SALE & PURCHASE INSPECTION

Buyers’ representatives request for the master / crew to assist as best as possible and have the

Right to take photographs of tanks, holds, spaces, panels, cabins, public spaces, deck

accommodation and documentation/drawings

AA. CLASS STATUS RECORD / VESSEL CERTIFICATIONS

To provide temporary log-in for the Class records.

BB. DECK- ACCOMMODATION - CARGO HOLDS

1. Superficial inspection at Main Deck Area/ Forecastle/ Accommodation decks/ Bosun Store

2. All cranes & pedestal inside.

3. Superficial inspection of all Cargo Holds at empty condition

4. Superficial inspection of 2 TST tanks (one each side PT and one DBT if possible)

5. Accommodation area inside, and bridge

6. Bridge Logbook review.

7. Vessel Performance for last 3 Laden and ballast voyages in ECO and in full speed

8. Review of last UT measurements report.

9. Review of PSC report file.

CC. HATCH COVERS

1. Hose Tightness test records

2. Ultrasonic hatch cover tightness records

DD. BALLAST TANKS

Enter the empty ballast tanks """ always according to vessel's schedule after crew making

sure, that tanks atmosphere is safe.

EE. ENGINE ROOM

1. Superficial inspection of Engine room/ Machinery Spaces/ Steering Gear Room/ Duct Keel/

M/E Cofferdam

2. Copies of M/E Cylinder overhauling reports, including calibration of liners

3. Copies of M/E crankshaft deflection reports

4. Copies of M/E Bearing clearance records

5. Review of M/E and T/C overhauling/ maintenance records


6. Copies of M/E running hours and running hours since last overhauling reports

7. Crankcase superficial inspection (all cylinder crankcase doors to be opened).

8. Diesel Generator Overhauling Records and clearances/ measurements for Liners/ Pistons/ Con-Rods

9. Diesel Generator Crankshaft Deflection Records

10. M/E & D/G Indicator diagrams & performance data sheets.

11. Copies of DGs running hours and running hours since last overhauling reports.

12. Copy of Running hours and maintenance records (Major equipment’s only).

13. PMS database to be provided in electronic format.

14. Machinery with Makers Particulars List for Engine and Deck. (E/R, Deck, Bridge & electrical
equipment particulars list)

15. Superficial inspection of boiler smoke tubes with lower inspection door open.

16. Engine log book review and copies apply to Bullet # 7 Deck

17. Copies of last Lube oil analysis, Drain oil analysis (if any), Boiler & Jacket water treatment data.

FF. LSA/FFA equipment

1. Vessel routine inspection and maintenance

2. External servicing records

GG. OTHER MISCELLANEOUS REQUIRED

1. Off-Hire report - Mechanical breakdown

2. Running Defect List

3. Last Dry-dock repair reports and anchor chain calibration data.

4. Inventory of spares and inventory of wires and ropes.

5. Inventory of Hold cleaning equipment.

6. BWTS, IHM, EEXI, IEE survey –

7.IHM report and inventory and IHM SOC for EU and HKG to be provided.

8. Crane slewing bearing clearance report.

9. Last cranes load testing report.

10. condition of grabs

11. Last 10 cargos loaded.

12. Copies of BDN, mate's receipt for cargo delivery from 1st Jan 2023 to be provided.
13.Last UWI Report (Where do the sellers intend to provide the vessel for us to conduct an UWI)

14. EU MRV certificates to be retained and voyage data from 1st Jan 2023 till date of sale.

15. Last EU MRV & IMO DCS SOC to be provided.

16. CII rating and EEXI installation.( EEXI Technical File )

17. EEXI compliance speeds is Vref = XXXX knots with power limitation PME= XXXXkW (xx% of xxxx kW) :

18. All CSR certificates including Form 2 & 3

18. Copies of VGP records to be provided.

19. All the class and Flag certificate. Cert of ballast water management.

20. Copies / original of Garbage Record book (2 years) and Oil Record Book ( 3 years )

21.Copy of last 3 months of log book (buyers to be allowed to make copies)

22. Copies of SOPEP, Garbage Management Plan and LSA / FFA training manual if they are not company
specific forms.

23.Gas Bottles and LSA / FFA:

Since the sellers has XXXXX life rafts and XXX gas bottles, please reach out to them to ask if an account
transfer can be carried out. This way the takeover costs are reduced for us and also easier for sellers. A
full inventory of the gas bottles to be taken onboard in presence of our observers.

24. Communication Equipment:

Please check if the communication contract can be transferred under our own account. In this case, it
would be important to include in the MOA that sellers agree to terminate their Radio Station connection
within 6 hours of the sale to allow reactivation of the station via the buyers. This is because till the
station is activated by buyers and GMDSS is operational, ISM surveys cannot complete as SSAS test is
required. This sometimes causes delay to the vessel departure.

For price negotiations you may use the following;

Riding team for 6 months > 8,000 USD

Cargo Hold upgradation in DD > 250,000 USD

Shipside blasting in DD (estimated 80 % ) > 80,000 USD

Deck cosmetic upgrade > 40,000 USD

Renewal of pipelines > 70,000 USD

Survey due cost > 10,000 USD


Last Docking – July 2021.

Intermediate survey to be carried out by 10th Nov 2023.