KH (Footwear Div) - Ranipet Site Plan
KH (Footwear Div) - Ranipet Site Plan
15'-9"
Pipe Line Fire H
ydrant 23'-0" 10 S
'
Revised Site Plan Showing The Existing Factory Building And Proposed Additional Construction of(Sec.Floor-Machinery Shelter) P (7.01m) (3.0 -0"
122'-0"(37.20m)
& Din ump Room
ing Ha 5m
52'
ll
50'-3" )
-6"
At T.S.No.15/3,4(p),5,6,7,8,9,10 ,11 & 16/2(p), Block :26, Ward :D, At Bye-Pass Road, Ranipet Town, Walajah Taluk,Ranipet District. Fire H
Stor
O.H.T-18'-0" y Well
Sump drant
(16
E W
e
16'-4"
Tank
R oo
17'-
.00
6"
m
31'-0"
Scale 1 : 400 9'-9
"
m)
Open To Sky
60'-6" 6'-0
17
" '-9
"
17'-9"
Be
PALLAR RIVER d Ro 6'-0
"
om
53'-9"
232'-0"(70.71m) 26'
"
-3"
' -6
13
) 21'-0
457'-0"(89.30m
23'-6"
19'-6"
Sewage Sewage
17'-6"
11'-6"
Collection
16'-3" Collection
Tank-I
60'-6"
11'-0"
15'-3"
10'-9"
Tank-I Garden Swimming REFERENCE
29'-6"
Shelter 29'-6" R
loor)
29'-9"
e Hall(G.F
47'-0"
Portico
UP
all 6m ht,
Pool
18'-0"
Open To Sky Ambulanc ll (F.Floor)
a
33'-3"
Training H m (S.Floor) Portico
This Plan Based On Approved By The
42'-9" e c o rd R o o Approach Road
R Director of Industrial Safety and Health Chennai-32.
Compound W
36'-0"
Build g -K
8'-0"
k in
Diesel Tan
36'-0"
Workshop 43'-9"
Die Making & 53'-9"
-6"
20'-0" Male
3'-9"
39'-0"
20'-6"
13'
1. N.U.(D1) -18920/2022 , DATED -26.07.2022
38'-3"
Toilet -3"
Material Store Building -D2 Fire Hydrant Workers g -L
Buil d in
10'-0" RWHT
Garden RWHT RWHT 26' om
Ro
17'-9"
Pipe Line "
Bed 6'-0
13'-6"
91'-0" S.F Second Floor Second Floor Guest House
25'-0"
Shelter
Machinery Godown Machinery Godown -9"
17'
6'-6
Fire Hydrant 10'-0" 60'-6"
20'-0" ad
Approach Ro (Metal Sheet Roof) (Metal Sheet Roof)
"
20'-0"
Pipe Line
Store 50'-9" 171'-9"
NOTE :-
RWHT
50'-9" Open To Sky
1.Fire Fire Hydrant Valve......
20'-0"
8'-6"
Sump Fire Hydrant
Tank 2.Double Door Hose Box.......
20'-0" Pipe Line
G.Floor -Building -F
125'-0"
125'-0"
175'-0"(53.30m)
75'-6"
3.Fire Hose Reel.....................
Sand Filter
Tank
Carbon
Filter Tank
F.Floor -Building -G
RWHT
252'-0"(76.50m)
Male Staff Dining Hall
Open To Sky
30'-3"
Loading & Unloading Area
Assorting Table
(Rcc Roof)
87'-9"
71'-3"
Garden
4'-9"
Approach Road
Fire Hydrant
18'-0" 20'-0"
250'-0"
187'-9"
RWHT Well
G.F- Maintenance Material Store
RWHT
(Building - J)
(Building -U)
Open To Sky
Upper Material Stores
200'-9"
Upper Material Cutting
Open To Sky
9'-6" 20'-6"
Approach Road
240'-9"
Sheet No:-1/21----------- 281.25
175'-3"
138'-9"
( Building - I )
10'-6"
80'-9"
Compressor Shed
30'-9"
100'-0"
35'-3"
Garden Pro-Mezzanine Floor UDP Area Generator
Building -N1
Building -X2 Sheet No:-6/21----------- 1081.44
Building -C 60'-3" Sheet No:-7/21----------- 348.78
G.F+3
Lift
12'-9"
20'-6" Compressor Sheet No:-8/21----------- 157.00
12'-3"
38'-6"
38'-0"
Open To Sky
Toilet
7'-3"
23'-9"
60'-0" 60'-9" 26'-0" 24'-9" Sheet No:-14/21----------- 35.25
m
Verandah
19'-3"
18'-9"
Panel
42'-0"
11'-6"
232'-6" O.T.S Compressor Room Winding Section &
Building -X
46'-6" Room
49'-0" 181'-6" AC Department Area Sheet No:-15/21----------- 4.00
Production Hall 200'-9" Sheet No:-16/21----------- 5.00
49'-0"
Panel Room
25'-9"
25'-9"
37'-0"
Open To Sky
EB Panel Board
40'-6"
Shellter
(G.F & F.Floor )
Work Shop &
121'-6"
35'-9"
Building -Y
Room
60'-3"
29'-3"
G.F-Finished Goods Ware House
24'-6"
150'-9"
Shelter
Production Hall (Building -D4 & B1)
AREA DETAILS :-
Machinery
SQ.FT SQ.MT
Godown
19'-9"
150'-9"
Building -B
10'-0"
10'-0"
Finished Goods Ware House
21'-6"
125'-6"
121'-6"
14'-6" Production Hall 143'-0"
1 Total Area of the Site (12.05 Acr) 5,24,898.00 48,782.40
125'-6"
Building -A
Gents & Ladies Toilet
25'-0"
2 Existing Building Area
76'-0"
51'-0"
31'-9"
28'-0"
5'-6" 16'-6" (Building -T)
Approach Road
12'-0"
3 Proposed Building Area 486.00 45.15
Approach Road
Generator Shelter
Workers Toilet
Shed
Building -X1 4 Open To Sky Area 2,10,995.25 19,609.25
40'-0"
12'-0"
40'-0"
Urinals
Staff &
430'-0"(131.00m)
18'-0"
Generator
Shed 77'-3"
COLOR INDEX :-
ial Ground
Building -L 10'-0"
Open To Sky
21'-9"
200'-9"
Shelter
13'-9"
25'-0"
10'-6"
Passage
10'-6"
14'-0" 281'-6" Office OTS OTS Store Room Boundary Line Shown in ...........................
11'-9" 8'-9" 8'-3" 11'-9" 11'-0" 28'-3" 9'-0" 29'-3"
47'-6" 58'-3"
71'-9"(21.87m)
40'-6" 100'-9" Existing Building Shown in ......................
Passage
24'-9"
24'-9"
24'-9"
Passage
Store Room
41'-3"
H.T / L.T Panel Hall
11'-9"
Building -D6 Lift
Room
(Metal Sheet Roof)
73'-0"
18'-9"
Open To Sky
73'-0"
12'-0"
Machinery Shelter
90'-0"
76'-0"
Building -A
Open To Sky
281'-6" F.F- Full Shoe Production Hall
76'-0"
(Building -D )
SPECIFICATION:-
0.50m)
Portico
20'-0"
461'-0"(14
100'-9" 25'-9" 2. Necessary Water Supply And External Sanitary Arrangement
Fire Hydrant Have been Provide.
Fire Hydrant
Pipe Line
Pipe Line
3. Fire Protection have been Provide By 4 Buckets, Water, Sand.
Open To Sky
Approach Road For EB Panel Room & Sand & Carbon Filter Fixing Of Fire Extinguisher.
11'-0"
8'-
Scrap Yard
90'-9"
13'-0"
2 8'-0" 18'-9" Settling
5'-0"
Collection Tank
Garden ) 13'-0"
10'-6"
(11 .42m 40'-6"(12.34m) 46'-11"(14.24m) 37'-9" 48'-0" 0m) s
23
Tank
Collection Tank
23'-3"(7.08m)
Approach Road Approach Road 7'-6" de Toi L 5. All Door ,Windows are Open Outward only.
21'-0"
'-6
12'-3"
24'-6"
3 Electric Attendance (Security, Supplier, a 13'-0"
"
L ts g -
&Visitors Room) n in
Recorded Area Ge uild 6. Number Of Employed Working in .................only.
7'-9"
)
32'-3"
34'-9"(10.60m)
B E.B Room
9" m nk 7'-6"
.90
-
56'
a 28'-3"
cT 10'-0"
80
pti
56'-9"(17.30m)
7
"(1 Se
APPLICANT:-
'-0
0 Secondary
28'-0"
9' - Aeration
26'-9"
Clarifier Tank
"(2
5 Tank
18'-0"
32'-0"(9.75m)
Sludge
17'-0"
4.4
Garden Collection
Drying 0"
12'-0" Tank 27'-
56
0m
18'-0" 18'-6"
'-6 24'-9" 13'-6"
)
"(1 28
69'-6"(21.20m)
7.2 2 Courier
Vacant Land 71'-9"(21.87m) (8 '-0"
13'-6"
Room .53
"
m
.46
0m 0 9 2m " m
RY
Building-Q
0.8 34'-0" )
"(7
ST
'-6
-6 m) Vacant Land
35'
24
U
ND
10'-3"
-
ING
Cell Receiving
RI
Room
IST
HE
81
Septic
Approach Road
AT
Tank
EX
'-0
107'-6"(32.80m)
LE
"(
24
Garden
125'-3" 13'-9"
13'-6"
K.H
15'-0" 25'-3"
.7
13'-9"
Time
15'-0"
0m
Ca
Toilet
(Metal Sheet Roof)
/S
Office 8'-9"
Building -L
"M
rP
)
ar
Garden
ki
ng
Approach Road
Approach Road
Male Workers Rest Hall
211'-0"(64.30m)
Administrative Office
243'-0"(74.06m)
EXISTING - Building -O
0m)
2'-0"(52.4
Compressor
17'-0"
72'-9"
Shoes,Ma m
Gate
Shelter
Visitors R
Building -P
Two Wheeler
Vacant Land
Parking Area
terial Stor
oo
75'-0"
94'-9"
17
e&
31'-6" 45'-6"
14'-3" SRI LAKSHMI BUILDERS
19'-9"
27'-6"
12'-0"
12'-0" Plot No.35 R.V.Building First Floor,
23'-3"
6'-3"
Portico
12'-0"
Gate
Security Building-R
54'-0"
29'-9"
6m)
12'-0"
Office Open To Sky Pipe Line
12'-
To Chennai