PT.KOMIPO PEMBANGKITAN JAWA BALI | Doc. Ref. KPIB-0952.04
hia PLTUTANJUNG JATIB UNIT #284. Foyntio, | KPUPOISEORZZT
oF
MINUTE OF MEETING __ | 222°0% | Ereinesrine
Rev.No. | 00
OPERATION & MAINTENANCE
TANJUNG JATIB
COAL FIRED POWER PLANT UNIT 3 & 4
PURPOSE OF MEETING VENUE / DATE / TIME
KPJB Meeting Room 2
Meeting Coordination Related Additional Time
for Purchase Order No 17992 “Corrosive
Protection at Absorber Tank TJB Unit #3&4” At 14:00 am on 7 December 2023
‘Attendees
PLN TJB LIBRATAMA PLN Site
Ardian KM Roni A KPIB Site
Dany $ Daniel Priro S$
Yossa A
KPJB
Remarks
‘Attachments: |
1. Attendance List
2. Weekly Report (Week 7)
3. Timeline Schedule Replacement of Exp JointPT.KOMIPO PEMBANGKITAN JAWA BALI | Dec. Ref. | KPJB-0062-04
PLTU TANJUNG JATIB UNIT #384 | FomnNo, | KPIBOSSZORZZFIE
on
Design Dw._| Engineer
— MINUTE OF MEETING = a 2
Prev- :
Item Discussion Items Action | Remark :
No: pie
Introduction
]
i The meeting began at 14.00 WIB on 7 December 2023 psp | Into
and was chaired by Mr. Bayu Eko N from KPJB.
2 ogress of Work:
Starting from 26 November 2023, PT Libratama cannot
conduct work of coating on Absorber Tank Unit #3 due
to leakage of SO: on expansion joint Absorber Inlet
position,
Progress actual on 22-26 November 2023 is $6,5% with | All Info
lagging 42%.
PY Libratama explain for completion of work PO No
17992 need estimation 19 calendar days.
KPIB HSE division issuing rule to stop activity on around
‘Absorber Tank Unit #3 whieh potentially disturbing of
health worker.
3. Information
KPJB Mechanical division issuing schedule of
replacement expansion joint Absorber Inlet starting from | 1 ee
6-9 December 2023,
4. Conclusion
‘The duration of contract PO No 17992 is 13 Oet- 12 Dee |
2023 (60 days calendar days)
‘The disturbance due to leakage of expansion joint on
Absorber Inlet Unit #3 from 26 Nov ~ 9 Dec 2023 (14
calendar days).
Page 2013hia PLTU TANJUNG JATIB UNIT #384
PT.KOMIPO PEMBANGKITAN JAWA BALI | Osc-Ref._| KPJB.0952.04
ot
Form No. | KPIBASE2 0822-7
wacom | MINUTE OF MEETING | 2e20"50 | Enoinesina
Rev.No, [00
Prev- ;
Kem | tem Discussion Items Action | Remark:
No:
It-was agreed that additional time for completion of work:
stait from 13 Dee - 26 Dec 2023 all Info
Approval
med on behalf of Signed on behalf of
KPIB LIBRATAMA
(Wahyu Tri W) (Ahmad Bukron)
Page 3 073,a ee ee ee
ke SB Form No KPJB-0958-01-Z2-FM-02
Soe ATTENDANCE LIST aon Enainesting
umber
[Day/Date : | Kems, + dea 402s
[Time i] eo ob.
Venue: | Metiy Raw 2
Meckig tedoit perombshay eka Conese (election? ob Absocbar Tank."
boys ed AB I by
2 | ten & ten / 494
3 | Anion bon. ew / hor F
4 | Dy-s PUN / Her
5 | Runw-A- Libratamn c
S| Daner Rice S Cipratara
7 [Spm a Upvettounar "
8
5 g
rr 7
zr of
2 7
a Fe
14 4
45 te
16 8
7 7
18 8
19 19
20 20
24 j24
22 22
23 [22
24 24
[a is
—)BD Hp 200 es
PLN me, 7 Ubrotema eater
ceca
rene == =
———— ale it
acon ro
ae miele 7 =
Z
anes ae Wee =
ee | fg
=a Se eee ee
———eas Wa
TaseUEN WAN TepeaT paw
joaug une ‘Bue uemeuuaH SM exlupuy
\ ‘i
oe, i ¥
or V
iq panorddy hq pamainay | Aqparedeig
eae Bumueap pue| | |
| ca
“| T [ployeas jeuayeus
pee sajsuen ‘vonanpul ayes) | T
uuoneredaid
60 80 40 90
jueusy : €z0z Jequies9q uonduosaq | oN
AN3IN3DV1d34 LNIOS NOISNVdX3 LIINI YISYOSAV JINGIHIS JINIL