You are on page 1of 16

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA


BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGGARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL I SULTRA
PPK 1.3 PROV. SULAWESI TENGGARA

REKAPITULASI LAPORAN KEMAJUAN PEKERJAAN


NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO)
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022
KONSULTAN : PT.UMUM
KEMENTERIAN PEKERJAAN TRIBINA MATRA CARYA
DAN PERUMAHAN RAKYAT CIPTA KSO PT. WINSOLUSI KONSULTAN -
PT. ARISTA CIPTA
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGGARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL I SULTRA
REALISASI
PPK 1.3 PROV. KEMAJUAN
PEKERJAAN MINGGU KE 69 (06 Oktober - 13 Oktober 2023)
SULAWESI TENGGARA
BOBOT (%)
NO. OUTPUT PEKERJAAN
RENCANA REALISASI DEVIASI
I KONTRAK INDUK GABUNGAN 81.887 79.880 -2.008

1. PELEBARAN JALAN 81.862 79.531 -2.331

2. PEMELIHARAAN JALAN 83.542 76.827 -6.715

3. PEMELIHARAAN JEMBATAN 80.366 71.629 -8.737

II KONTRAK TAHUN 2023 72.993 73.191 0.198

1. PELEBARAN JALAN 73.014 75.961 2.947

2. PEMELIHARAAN JALAN 70.033 96.437 26.404

3. PEMELIHARAAN JEMBATAN 72.545 100.000 27.455

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 69
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4189 0.700 - 0.700 0.293 - 0.293 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0838 0.675 0.017 0.692 0.057 0.001 0.058 69,236,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0009 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0025 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 1.00 35,000,000.00 35,000,000.00 0.0293 0.598 0.033 0.631 0.018 0.001 0.019 22,090,391.83
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0168 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0829 0.582 0.035 0.616 0.048 0.003 0.051 61,017,152.30
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0190 0.608 0.032 0.641 0.012 0.001 0.012 14,557,903.14
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1676 0.685 0.013 0.698 0.115 0.002 0.117 139,500,000.00
Sub Total ( 1 ) 1,030,212,272.73 0.8631 0.567 0.008 0.575 686,392,289.39
II DIVISI 2. DRAINASE 18,347.000 120.000 18,467.000
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2306 9,944.074 65.040 10,009.114 0.208 0.001 0.210 250,227,850.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9047 6,897.054 54.840 6,951.894 4.045 0.032 4.077 4,866,325,807.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 134.40 4,275,906.49 574,681,832.26 0.4815 134.400 - 134.400 0.481 - 0.481 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 354.00 7,268,205.12 2,572,944,612.48 2.1556 354.000 - 354.000 2.156 - 2.156 2,572,944,612.48
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm M1 13.20 42,718,794.10 563,888,082.12 0.4724 13.200 - 13.200 0.472 - 0.472 563,888,082.12
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.8385 5,105.000 54.000 5,159.000 5.346 0.057 5.403 6,448,750,000.00
Sub Total ( 2 ) 16,809,675,676.86 14.0833 12.709 0.090 12.799 15,276,818,183.85
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -
3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2605 62,118.215 518.000 62,636.215 0.833 0.007 0.840 1,002,179,444.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.2845 16,861.852 470.192 17,332.045 1.413 0.039 1.452 1,733,204,474.36
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3694 67,354.346 1,400.000 68,754.346 0.282 0.006 0.288 343,771,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0049 164.000 - 164.000 0.005 - 0.005 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0112 218.000 - 218.000 0.011 - 0.011 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0366 390.000 - 390.000 0.037 - 0.037 43,692,686.70
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0152 78.000 - 78.000 0.015 - 0.015 18,193,400.94
Sub Total ( 3 ) 3,559,701,668.11 2.9824 2.596 0.052 2.648 3,161,013,878.54

2 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.2078 23,660.320 420.000 24,080.320 11.894 0.211 12.105 14,448,192,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1485 6,660.160 437.500 7,097.660 1.395 0.092 1.487 1,774,415,000.00
Sub Total ( 5 ) 18,329,013,316.00 15.3562 13.289 0.303 13.591 16,222,607,000.00
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8278 61,567.049 1,797.816 63,364.865 0.774 0.023 0.796 950,472,971.62
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7430 67,416.447 825.571 68,242.018 0.734 0.009 0.743 887,146,235.95
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2503 3,894.164 45.274 3,939.438 0.245 0.003 0.248 295,457,854.46
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 26.9085 20,625.760 269.490 20,895.250 24.625 0.322 24.946 29,775,731,250.00
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.4934 12,106.580 360.080 12,466.660 13.693 0.407 14.100 16,829,991,000.00

Sub Total ( 6 ) 51,590,342,354.06 43.2229 40.070 0.763 40.834 48,738,799,312.02


VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3070 - 64.800 64.800 - 0.193 0.193 230,543,186.26
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8204 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5017 211.875 181.125 393.000 0.200 0.171 0.370 442,125,000.00
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7084 5.500 5.500 11.000 0.016 0.016 0.032 38,435,209.01
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1003 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3177 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4854 - - - - - - -
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.0454 12,694.768 713.670 13,408.438 6.913 0.389 7.302 8,715,484,700.00
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3037 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2218 869.000 - 869.000 0.222 - 0.222 264,776,061.88
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0251 94.730 - 94.730 0.025 - 0.025 29,986,789.08
Sub Total ( 7 ) 20,096,358,540.74 16.8369 7.376 0.769 8.145 9,721,350,946.22

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0211 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0211 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0141 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2350 1,211.320 - 1,211.320 0.122 - 0.122 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grad Buah 144.00 450,000.00 64,800,000.00 0.0543 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.3745 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0094 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9004 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1927 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2715 - - - - - - -
Sub Total ( 9 ) 6,115,339,800.00 5.1235 0.123 - 0.123 147,358,400.00

3 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.2988 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 0.0657 131.400 - 131.400 0.066 - 0.066 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 0.4890 214.095 - 214.095 0.520 - 0.520 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 0.0799 22.000 - 22.000 0.059 - 0.059 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 0.1354 29,153.700 - 29,153.700 0.134 - 0.134 160,345,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 0.2178 498,673.000 - 498,673.000 0.209 - 0.209 249,336,500.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 1.00 5,000,000.00 5,000,000.00 0.0042 0.716 - 0.716 0.003 - 0.003 3,581,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 1.00 22,000,000.00 22,000,000.00 0.0184 0.716 - 0.716 0.013 - 0.013 15,758,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 1.00 12,500,000.00 12,500,000.00 0.0105 0.716 - 0.716 0.008 - 0.008 8,953,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 1.00 25,000,000.00 25,000,000.00 0.0209 0.716 - 0.716 0.015 - 0.015 17,907,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.716 - 0.716 0.007 - 0.007 8,595,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 1.00 9,000,000.00 9,000,000.00 0.0075 0.716 - 0.716 0.005 - 0.005 6,446,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.716 - 0.716 0.007 - 0.007 8,237,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.716 - 0.716 0.007 - 0.007 8,237,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 1.00 6,000,000.00 6,000,000.00 0.0050 0.716 - 0.716 0.004 - 0.004 4,297,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.716 - 0.716 0.007 - 0.007 8,595,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.716 - 0.716 0.008 - 0.008 9,311,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.716 - 0.716 0.008 - 0.008 9,311,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.716 - 0.716 0.018 - 0.018 21,488,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.716 - 0.716 0.006 - 0.006 7,162,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.716 - 0.716 0.018 - 0.018 21,488,571.43
Sub Total ( 10 ) 1,828,143,000.00 1.5316 1.164 - 1.164 1,389,309,550.61
TOTAL 119,358,786,628.49 100.000 PROGRESS REALISASI 77.895 1.985 79.880 95,343,649,560.64
Pajak Pertambahan Nilai (Ppn) 11% 13,129,466,529.13 PROGRESS RENCANA 81.162 0.726 81.887 10,487,801,451.67
TOTAL 132,488,253,157.63 DEVIASI (3.267) 1.259 (2.008) 105,831,451,012.31
DIBULATKAN 132,488,253,000.00 (1.259) 105,831,451,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek

4 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 69
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4254 0.700 - 0.700 0.298 - 0.298 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0851 0.675 0.017 0.692 0.057 0.001 0.059 69,236,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0010 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0026 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0043 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 1.00 35,000,000.00 35,000,000.00 0.0298 0.598 0.033 0.631 0.018 0.001 0.019 22,090,391.83
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0170 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0842 0.582 0.035 0.616 0.049 0.003 0.052 61,017,152.30
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0128 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0193 0.608 0.032 0.641 0.012 0.001 0.012 14,557,903.14
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0128 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0043 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1702 0.685 0.013 0.698 0.117 0.002 0.119 139,500,000.00

Sub Total ( 1 ) 1,030,212,272.73 0.8765 0.576 0.008 0.584 686,392,289.39


II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2342 9,944.074 65.040 10,009.114 0.212 0.001 0.213 250,227,850.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9810 6,897.054 54.840 6,951.894 4.108 0.033 4.140 4,866,325,807.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (precast M1 134.40 4,275,906.49 574,681,832.26 0.4890 134.400 - 134.400 0.489 - 0.489 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (precast M1 354.00 7,268,205.12 2,572,944,612.48 2.1892 354.000 - 354.000 2.189 - 2.189 2,572,944,612.48
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm (precast M1 13.20 42,718,794.10 563,888,082.12 0.4798 13.200 - 13.200 0.480 - 0.480 563,888,082.12
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.9293 5,105.000 54.000 5,159.000 5.429 0.057 5.487 6,448,750,000.00
Sub Total ( 2 ) 16,809,675,676.86 14.3024 12.907 0.091 12.998 15,276,818,183.85
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2801 62,118.215 518.000 62,636.215 0.846 0.007 0.853 1,002,179,444.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.3045 16,861.852 470.192 17,332.045 1.435 0.040 1.475 1,733,204,474.36
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3751 67,354.346 1,400.000 68,754.346 0.287 0.006 0.292 343,771,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0050 164.000 - 164.000 0.006 - 0.006 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0114 218.000 - 218.000 0.011 - 0.011 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0372 390.000 - 390.000 0.037 - 0.037 43,692,686.70
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0155 78.000 - 78.000 0.015 - 0.015 18,193,400.94
Sub Total ( 3 ) 3,559,701,668.11 3.0287 2.637 0.053 2.690 3,161,013,878.54

5 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.3976 23,660.320 420.000 24,080.320 12.079 0.214 12.293 14,448,192,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1974 6,660.160 437.500 7,097.660 1.417 0.093 1.510 1,774,415,000.00
Sub Total ( 5 ) 18,329,013,316.00 15.5951 13.495 0.307 13.803 16,222,607,000.00
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8406 61,567.049 1,797.816 63,364.865 0.786 0.023 0.809 950,472,971.62
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7546 67,416.447 825.571 ######## 0.746 0.009 0.755 #VALUE!
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2542 3,894.164 45.274 3,939.438 0.248 0.003 0.251 295,457,854.46
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 27.3270 20,625.760 269.490 20,895.250 25.008 0.327 25.334 29,775,731,250.00
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.7188 12,106.580 360.080 12,466.660 13.906 0.414 14.320 16,829,991,000.00
Sub Total ( 6 ) 51,590,342,354.06 43.8952 40.694 0.775 41.469 #VALUE!
VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3273 - 64.800 64.800 - 0.196 0.196 230,543,186.26
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8331 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5406 211.875 181.125 393.000 - - - -
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7350 5.500 5.500 11.000 - - - -
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1018 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3382 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4930 - - - - - - -
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.1706 12,694.768 713.670 13,408.438 7.021 0.395 7.415 8,715,484,700.00
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3084 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2253 869.000 - 869.000 0.225 - 0.225 264,776,061.88
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0255 94.730 - 94.730 0.026 - 0.026 29,986,789.08
Sub Total ( 7 ) 20,096,358,540.74 17.0988 7.272 0.591 7.862 9,240,790,737.21

6 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0143 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0143 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0214 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0214 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0143 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2542 1,211.320 - 1,211.320 0.124 - 0.124 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0551 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.3803 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0095 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9455 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1957 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2757 - - - - - - -
Sub Total ( 9 ) 6,115,339,800.00 5.2032 0.125 - 0.125 147,358,400.00
TOTAL 117,530,643,628.49 100.000 PROGRESS REALISASI 77.705 1.826 79.531 #VALUE!
Pajak Pertambahan Nilai (Ppn) 11% 12,928,370,799.13 PROGRESS RENCANA 81.146 81.862 #VALUE!
TOTAL 130,459,014,427.63 DEVIASI (3.440) 1.826 (2.331) #VALUE!
DIBULATKAN 130,459,014,000.00 (1.826) #VALUE!
Disetujui Diperiksa Disiapkan
Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT. AGUNG
KONSULTAN - PT. ARISTA CIPTA SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

7 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 69
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 23.2272 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 5.1031 131.400 - 131.400 5.134 - 5.134 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 38.0071 214.095 - 214.095 40.431 - 40.431 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 6.2098 22.000 - 22.000 4.584 - 4.584 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 10.5237 29,153.700 - 29,153.700 10.442 - 10.442 160,345,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 16.9290 498,673.000 - 498,673.000 16.237 - 16.237 249,336,500.00
Sub Total ( 10 ) 1,535,643,000.00 100.0000 76.8275 - 76.8275 1,179,795,979.18
TOTAL 1,535,643,000.00 100.000 PROGRESS REALISASI 76.827 - 76.827 1,179,795,979.18
Pajak Pertambahan Nilai (Ppn) 11% 168,920,730.00 PROGRESS RENCANA 82.216 83.542 129,777,557.71
TOTAL 1,704,563,730.00 DEVIASI (5.389) - (6.715) 1,309,573,536.89
DIBULATKAN 1,704,563,000.00 - 1,309,573,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

8 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 69
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 1.00 5,000,000.00 5,000,000.00 1.7094 0.716 - 0.716 1.224 - 1.224 3,581,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 1.00 22,000,000.00 22,000,000.00 7.5214 0.716 - 0.716 5.387 - 5.387 15,758,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 1.00 12,500,000.00 12,500,000.00 4.2735 0.716 - 0.716 3.061 - 3.061 8,953,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 1.00 25,000,000.00 25,000,000.00 8.5470 0.716 - 0.716 6.122 - 6.122 17,907,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 1.00 12,000,000.00 12,000,000.00 4.1026 0.716 - 0.716 2.939 - 2.939 8,595,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 1.00 9,000,000.00 9,000,000.00 3.0769 0.716 - 0.716 2.204 - 2.204 6,446,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 3.9316 0.716 - 0.716 2.816 - 2.816 8,237,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 3.9316 0.716 - 0.716 2.816 - 2.816 8,237,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 1.00 6,000,000.00 6,000,000.00 2.0513 0.716 - 0.716 1.469 - 1.469 4,297,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 1.00 12,000,000.00 12,000,000.00 4.1026 0.716 - 0.716 2.939 - 2.939 8,595,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 4.4444 0.716 - 0.716 3.183 - 3.183 9,311,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 4.4444 0.716 - 0.716 3.183 - 3.183 9,311,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 10.2564 0.716 - 0.716 7.347 - 7.347 21,488,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.716 - 0.716 2.449 - 2.449 7,162,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 10.2564 0.716 - 0.716 7.347 - 7.347 21,488,571.43
TOTAL 292,500,000.00 100.000 PROGRESS REALISASI 71.629 - 71.629 209,513,571.43
Pajak Pertambahan Nilai (Ppn) 11% 32,175,000.00 PROGRESS RENCANA 82.052 80.366 23,046,492.86
TOTAL 324,675,000.00 DEVIASI (10.423) - (8.737) 232,560,064.29
DIBULATKAN 324,675,000.00 - 232,560,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

9 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 69 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 69INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 0.30 500,000,000.00 150,000,000.00 0.1659 - - - - - - -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 0.66 100,000,000.00 65,631,578.95 0.0726 0.331 0.017 0.349 0.037 0.002 0.039 34,868,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 6.00 70,000.00 420,000.00 0.0005 3.000 - 3.000 0.000 - 0.000 210,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 150,000.00 900,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 450,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 200,000.00 1,200,000.00 0.0013 3.000 - 3.000 0.001 - 0.001 600,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 125,000.00 750,000.00 0.0008 3.000 - 3.000 0.000 - 0.000 375,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0033 - - - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0055 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 0.64 35,000,000.00 22,449,291.24 0.0248 0.239 0.033 0.273 0.009 0.001 0.011 9,539,683.07
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0221 - - - - - - -
5.00 5. Personel K3 Konstruksi Buah 0.67 99,000,000.00 66,050,649.96 0.0730 0.249 0.035 0.284 0.027 0.004 0.031 28,067,802.26
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0166 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 0.63 22,727,272.73 14,206,206.32 0.0157 0.233 0.032 0.266 0.006 0.001 0.007 6,036,836.73
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0166 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0055 - - - - - - -
1.21 Manajemen Mutu Ls 0.64 200,000,000.00 128,500,000.00 0.1421 0.328 0.013 0.340 0.072 0.003 0.075 68,000,000.00

Sub Total ( 1 ) 516,827,726.47 0.5715 0.155 0.011 0.166 150,007,743.12


II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 6,099.13 25,000.00 152,478,150.00 0.1686 5,033.554 65.040 5,098.594 0.139 0.002 0.141 127,464,850.00
2.2.(1) Pasangan Batu dengan Mortar M3 5,710.20 700,000.00 3,997,143,493.00 4.4203 4,244.159 54.840 4,298.999 3.285 0.042 3.328 3,009,299,300.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (p M1 134.40 4,275,906.49 574,681,832.26 0.6355 134.400 - 134.400 0.636 - 0.636 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (p M1 296.40 7,268,205.12 2,154,295,997.57 2.3823 296.400 - 296.400 2.382 - 2.382 2,154,295,997.57
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm (p M1 13.20 42,718,794.10 563,888,082.12 0.6236 - - - - - - -
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 4,575.00 1,250,000.00 5,718,750,000.00 6.3241 4,105.000 54.000 4,159.000 5.674 0.075 5.749 5,198,750,000.00

Sub Total ( 2 ) 13,161,237,554.95 14.5545 12.117 0.119 12.236 11,064,491,979.82


III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 67,613.34 16,000.00 1,081,813,390.40 1.1963 35,698.602 518.000 36,216.602 0.632 0.009 0.641 579,465,634.67
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,144.96 100,000.00 1,114,496,000.00 1.2325 12,675.492 470.192 13,145.685 1.402 0.052 1.454 1,314,568,474.36
3.3.(1) Penyiapan Badan Jalan M2 64,166.26 5,000.00 320,831,300.00 0.3548 43,347.816 1,400.000 44,747.816 0.240 0.008 0.247 223,739,079.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 29.00 39,983.05 1,159,508.45 0.0013 149.000 - 149.000 0.007 - 0.007 5,957,474.45
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 182.00 61,536.34 11,199,613.88 0.0124 218.000 - 218.000 0.015 - 0.015 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 207.00 112,032.53 23,190,733.71 0.0256 382.000 - 382.000 0.047 - 0.047 42,796,426.46
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 1.00 233,248.73 233,248.73 0.0003 76.000 - 76.000 0.020 - 0.020 17,726,903.48

Sub Total ( 3 ) 2,552,923,795.17 2.82 2.361 0.069 2.430 2,197,668,915.49

10 / 16
PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 14,486.66 600,000.00 8,691,994,416.00 9.6121 13,861.926 420.000 14,281.926 9.198 0.279 9.476 8,569,155,600.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 4.1558 6,660.160 437.500 7,097.660 1.841 0.121 1.962 1,774,415,000.00
Sub Total ( 5 ) 12,449,976,916.00 13.7679 11.039 0.400 11.439 10,343,570,600.00
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 46,717.40 15,000.00 700,760,995.99 0.7749 42,417.577 1,797.816 44,215.393 0.704 0.030 0.733 663,230,888.21
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 48,419.05 13,000.00 629,447,646.02 0.6961 47,615.247 825.571 48,440.818 0.685 0.012 0.696 629,730,631.98
6.3.(8) Bahan anti pengelupasan Kg 3,891.90 75,000.00 291,892,571.00 0.3228 3,802.787 45.274 3,848.061 0.315 0.004 0.319 288,604,598.42
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 16,063.68 1,425,000.00 22,890,738,656.25 25.3139 14,150.767 269.490 14,420.257 22.299 0.425 22.724 20,548,866,937.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 8,976.25 1,350,000.00 12,117,934,751.65 13.4007 8,268.660 360.080 8,628.740 12.344 0.538 12.882 11,648,798,522.78

Sub Total ( 6 ) 36,630,774,620.92 40.5085 36.347 1.008 37.355 33,779,231,578.88


VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.7252 - 64.800 64.800 - 0.255 0.255 230,543,186.26
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 1.0829 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 3.3020 - 181.125 181.125 - 0.225 0.225 203,765,625.00
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 2.2550 - 5.500 5.500 - 0.021 0.021 19,217,604.51
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1324 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.7392 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 25,549.07 20,934.10 534,846,777.78 0.5915 - - - - - - -
7.9.(1) Pasangan Batu M3 12,645.42 650,000.00 8,219,520,651.07 9.0896 10,566.438 713.670 11,280.108 7.595 0.513 8.108 7,332,069,935.94
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.4009 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 529.49 304,690.52 161,330,583.43 0.1784 757.790 - 757.790 0.255 - 0.255 230,891,429.15
7.15.(2) Pembongkaran Beton M3 90.09 316,550.08 28,519,294.56 0.0315 90.094 - 90.094 0.032 - 0.032 28,519,294.56
Sub Total ( 7 ) 18,563,476,122.16 20.5286 7.8821 1.0145 8.8966 8,045,007,075.41

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0017 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0186 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0186 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 121.00 200,000.00 24,200,000.00 0.0268 - - - - - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0279 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 79.00 200,000.00 15,800,000.00 0.0175 - - - - - - -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.6301 1,211.320 - 1,211.320 0.161 - 0.161 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0717 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.4943 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0124 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 3.8284 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.2543 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.3583 - - - - - - -
Sub Total ( 9 ) 6,113,339,800.00 6.7605 0.161 - 0.161 145,358,400.00

11 / 16
PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.3944 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 (0.79) 600,000.00 (474,000.00) (0.0005) 161.195 - 161.195 0.107 - 0.107 96,716,716.38
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 (12.83) 2,900,000.00 (37,220,129.18) (0.0412) 49.900 - 49.900 0.160 - 0.160 144,710,418.43
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 7.80 3,200,000.00 24,959,994.13 0.0276 - - - - - - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 229.39 5,500.00 1,261,645.00 0.0014 11,737.600 - 11,737.600 0.071 - 0.071 64,556,800.00
10.1.(22) Pengendalian Tanaman M2 21,264.66 500.00 10,632,330.00 0.0118 139,436.300 - 139,436.300 0.077 - 0.077 69,718,150.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 0.28 5,000,000.00 1,418,571.43 0.0016 0.286 - 0.286 0.002 - 0.002 1,430,000.00
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 0.28 22,000,000.00 6,241,714.29 0.0069 0.286 - 0.286 0.007 - 0.007 6,292,000.00
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 0.28 12,500,000.00 3,546,428.57 0.0039 0.286 - 0.286 0.004 - 0.004 3,575,000.00
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 0.28 25,000,000.00 7,092,857.14 0.0078 0.286 - 0.286 0.008 - 0.008 7,150,000.00
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 0.28 12,000,000.00 3,404,571.43 0.0038 0.286 - 0.286 0.004 - 0.004 3,432,000.00
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 0.28 9,000,000.00 2,553,428.57 0.0028 0.286 - 0.286 0.003 - 0.003 2,574,000.00
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 0.28 11,500,000.00 3,262,714.29 0.0036 0.286 - 0.286 0.004 - 0.004 3,289,000.00
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 0.28 11,500,000.00 3,262,714.29 0.0036 0.286 - 0.286 0.004 - 0.004 3,289,000.00
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 0.28 6,000,000.00 1,702,285.71 0.0019 0.286 - 0.286 0.002 - 0.002 1,716,000.00
10.2.(12) Pemeliharaan Jembatan S.Tanggetada Bentang 8.8 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 0.28 12,000,000.00 3,404,571.43 0.0038 0.286 - 0.286 0.004 - 0.004 3,432,000.00
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 0.28 13,000,000.00 3,688,285.71 0.0041 0.286 - 0.286 0.004 - 0.004 3,718,000.00
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 0.28 13,000,000.00 3,688,285.71 0.0041 0.286 - 0.286 0.004 - 0.004 3,718,000.00
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 0.28 30,000,000.00 8,511,428.57 0.0094 0.286 - 0.286 0.009 - 0.009 8,580,000.00
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 0.28 10,000,000.00 2,837,142.86 0.0031 0.286 - 0.286 0.003 - 0.003 2,860,000.00
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 0.28 30,000,000.00 8,511,428.57 0.0094 0.286 - 0.286 0.009 - 0.009 8,580,000.00
Sub Total ( 10 ) 438,833,449.39 0.4853 0.508 - 0.508 459,357,084.8097
TOTAL 90,427,389,985.05 100.000 PROGRESS REALISASI 70.571 2.620 73.191 66,184,693,377.54
Pajak Pertambahan Nilai (Ppn) 11% 9,947,012,898.36 PROGRESS RENCANA 71.910 1.082 72.993 7,280,316,271.53
TOTAL 100,374,402,883.40 DEVIASI (1.339) 1.538 0.198 73,465,009,649.07
DIBULATKAN 100,374,402,000.00 (1.538) 73,465,009,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

12 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 69 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 0.30 500,000,000.00 150,000,000.00 0.1761 - - - - - - -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 0.66 100,000,000.00 65,631,578.95 0.0771 0.331 0.017 0.349 0.039 0.002 0.041 34,868,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 6.00 70,000.00 420,000.00 0.0005 3.000 - 3.000 0.000 - 0.000 210,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 150,000.00 900,000.00 0.0011 3.000 - 3.000 0.001 - 0.001 450,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 200,000.00 1,200,000.00 0.0014 3.000 - 3.000 0.001 - 0.001 600,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 125,000.00 750,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 375,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0035 - - - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0059 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 0.64 35,000,000.00 22,449,291.24 0.0264 0.239 0.033 0.273 0.010 0.001 0.011 9,539,683.07
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0235 - - - - - - -
5.00 5. Personel K3 Konstruksi Buah 0.67 99,000,000.00 66,050,649.96 0.0776 0.249 0.035 0.284 0.029 0.004 0.033 28,067,802.26
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0176 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 0.63 22,727,272.73 14,206,206.32 0.0167 0.233 0.032 0.266 0.006 0.001 0.007 6,036,836.73
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0176 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0059 - - - - - - -
1.21 Manajemen Mutu Ls 0.64 200,000,000.00 128,500,000.00 0.1509 0.328 0.013 0.340 0.077 0.003 0.080 68,000,000.00
Sub Total ( 1 ) 516,827,726.47 0.6068 0.165 0.011 0.176 150,007,743.12
II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 6,099.13 25,000.00 152,478,150.00 0.1790 5,033.554 65.040 5,098.594 0.148 0.002 0.150 127,464,850.00
2.2.(1) Pasangan Batu dengan Mortar M3 5,710.20 700,000.00 3,997,143,493.00 4.6931 4,244.159 54.840 4,298.999 3.488 0.045 3.533 3,009,299,300.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (precast M1 134.40 4,275,906.49 574,681,832.26 0.6747 134.400 - 134.400 - - - 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (precast M1 296.40 7,268,205.12 2,154,295,997.57 2.5294 296.400 - 296.400 2.529 - 2.529 2,154,295,997.57
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 4,575.00 1,250,000.00 5,718,750,000.00 6.7144 4,105.000 54.000 4,159.000 6.025 0.079 6.104 5,198,750,000.00
Sub Total ( 2 ) 12,597,349,472.83 14.7907 12.190 0.126 12.316 11,064,491,979.82
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 67,613.34 16,000.00 1,081,813,390.40 1.2702 35,698.602 518.000 36,216.602 0.671 0.010 0.680 579,465,634.67
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,144.96 100,000.00 1,114,496,000.00 1.3085 12,675.492 470.192 13,145.685 1.488 0.055 1.543 1,314,568,474.36
3.3.(1) Penyiapan Badan Jalan M2 64,166.26 5,000.00 320,831,300.00 0.3767 43,347.816 1,400.000 44,747.816 0.254 0.008 0.263 223,739,079.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 29.00 39,983.05 1,159,508.45 0.0014 149.000 - 149.000 0.007 - 0.007 5,957,474.45
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 182.00 61,536.34 11,199,613.88 0.0131 218.000 - 218.000 0.016 - 0.016 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 207.00 112,032.53 23,190,733.71 0.0272 382.000 - 382.000 0.050 - 0.050 42,796,426.46
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 1.00 233,248.73 233,248.73 0.0003 76.000 - 76.000 0.021 - 0.021 17,726,903.48
Sub Total ( 3 ) 2,552,923,795.17 2.9974 2.507 0.073 2.580 2,197,668,915.49

V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!


5.1.(1) Lapis Fondasi Agregat Kelas A M3 14,486.66 600,000.00 8,691,994,416.00 10.2054 13,861.926 420.000 14,281.926 9.765 0.296 10.061 8,569,155,600.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 4.4123 6,660.160 437.500 7,097.660 1.955 0.128 2.083 1,774,415,000.00
Sub Total ( 5 ) 12,449,976,916.00 14.6176 11.720 0.424 12.144 10,343,570,600.00

13 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 46,717.40 15,000.00 700,760,995.99 0.8228 42,417.577 1,797.816 44,215.393 0.747 0.032 0.779 663,230,888.21
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 48,419.05 13,000.00 629,447,646.02 0.7390 47,615.247 825.571 ######## 0.727 0.013 0.739 #VALUE!
6.3.(8) Bahan anti pengelupasan Kg 3,891.90 75,000.00 291,892,571.00 0.3427 3,802.787 45.274 3,848.061 0.335 0.004 0.339 288,604,598.42
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 16,063.68 1,425,000.00 22,890,738,656.25 26.8762 14,150.767 269.490 14,420.257 23.676 0.451 24.127 20,548,866,937.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 8,976.25 1,350,000.00 12,117,934,751.65 14.2278 8,268.660 360.080 8,628.740 13.106 0.571 13.677 11,648,798,522.78
Sub Total ( 6 ) 36,630,774,620.92 43.0085 38.591 1.070 39.661 #VALUE!
VII DIVISI 7. STRUKTUR
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 1.1497 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 3.5058 - 181.125 181.125 - - - 203,765,625.00
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.8466 - - - - - - -
7.9.(1) Pasangan Batu M3 12,645.42 650,000.00 8,219,520,651.07 9.6506 10,566.438 713.670 11,280.108 8.064 0.545 8.609 7,332,069,935.94
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.4256 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 529.49 304,690.52 161,330,583.43 0.1894 757.790 - 757.790 0.271 - 0.271 230,891,429.15
7.15.(2) Pembongkaran Beton M3 90.09 316,550.08 28,519,294.56 0.0335 90.094 - 90.094 0.033 - 0.033 28,519,294.56
Sub Total ( 7 ) 14,309,753,689.07 16.8012 8.369 0.545 8.913 7,795,246,284.65
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0018 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0197 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0197 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 121.00 200,000.00 24,200,000.00 0.0284 - - - - - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0296 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 79.00 200,000.00 15,800,000.00 0.0186 - - - - - - -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.7307 1,211.320 - 1,211.320 0.171 - 0.171 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0761 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.5248 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0132 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 4.0646 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.2700 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.3804 - - - - - - -
Sub Total ( 9 ) 6,113,339,800.00 7.1777 0.171 - 0.171 145,358,400.00
TOTAL 85,170,946,020.45 100.000 PROGRESS REALISASI 73.712 2.249 75.961 #VALUE!
Pajak Pertambahan Nilai (Ppn) 11% 9,368,804,062.25 PROGRESS RENCANA 71.948 73.014 #VALUE!
TOTAL 94,539,750,082.70 DEVIASI 1.764 2.249 2.947 #VALUE!
DIBULATKAN 94,539,750,000.00 (2.249) #VALUE!
Disetujui Diperiksa Disiapkan
Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT. AGUNG
KONSULTAN - PT. ARISTA CIPTA SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

14 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 69 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 91.5566 - 280.755 280.755 - - - 356,687,180.87
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 6.00 600,000.00 3,600,000.00 0.9241 161.195 - 161.195 24.826 - 24.826 96,716,716.38
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 6.00 2,900,000.00 17,400,000.00 4.4663 49.900 - 49.900 37.145 - 37.145 144,710,418.43
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 - 3,200,000.00 - - - - - - - - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 229.39 5,500.00 1,261,645.00 0.3238 11,737.600 - 11,737.600 16.571 - 16.571 64,556,800.00
10.1.(22) Pengendalian Tanaman M2 21,264.66 500.00 10,632,330.00 2.7292 139,436.300 - 139,436.300 17.896 - 17.896 69,718,150.00
TOTAL 389,581,155.87 100.000 PROGRESS REALISASI 96.437 - 96.437 375,702,084.81
Pajak Pertambahan Nilai (Ppn) 11% 42,853,927.15 PROGRESS RENCANA 67.618 70.033 41,327,229.33
TOTAL 432,435,083.02 DEVIASI 28.819 - 26.404 417,029,314.14
DIBULATKAN 432,435,000.00 - 417,029,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

15 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 69 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 06 Oktober - 13 Oktober 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 0.28 5,000,000.00 1,418,571.43 1.7094 0.284 - 0.284 1.709 - 1.709 1,418,571.43
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 0.28 22,000,000.00 6,241,714.29 7.5214 0.284 - 0.284 7.521 - 7.521 6,241,714.29
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 0.28 12,500,000.00 3,546,428.57 4.2735 0.284 - 0.284 4.274 - 4.274 3,546,428.57
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 0.28 25,000,000.00 7,092,857.14 8.5470 0.284 - 0.284 8.547 - 8.547 7,092,857.14
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 0.28 12,000,000.00 3,404,571.43 4.1026 0.284 - 0.284 4.103 - 4.103 3,404,571.43
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 0.28 9,000,000.00 2,553,428.57 3.0769 0.284 - 0.284 3.077 - 3.077 2,553,428.57
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 0.28 11,500,000.00 3,262,714.29 3.9316 0.284 - 0.284 3.932 - 3.932 3,262,714.29
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 0.28 11,500,000.00 3,262,714.29 3.9316 0.284 - 0.284 3.932 - 3.932 3,262,714.29
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 0.28 6,000,000.00 1,702,285.71 2.0513 0.284 - 0.284 2.051 - 2.051 1,702,285.71
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 0.28 12,000,000.00 3,404,571.43 4.1026 0.284 - 0.284 4.103 - 4.103 3,404,571.43
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 0.28 13,000,000.00 3,688,285.71 4.4444 0.284 - 0.284 4.444 - 4.444 3,688,285.71
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 0.28 13,000,000.00 3,688,285.71 4.4444 0.284 - 0.284 4.444 - 4.444 3,688,285.71
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 0.28 30,000,000.00 8,511,428.57 10.2564 0.284 - 0.284 10.256 - 10.256 8,511,428.57
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 0.28 10,000,000.00 2,837,142.86 3.4188 0.284 - 0.284 3.419 - 3.419 2,837,142.86
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 0.28 30,000,000.00 8,511,428.57 10.2564 0.284 - 0.284 10.256 - 10.256 8,511,428.57
TOTAL 82,986,428.57 100.000 PROGRESS REALISASI 100.000 - 100.000 82,986,428.57
Pajak Pertambahan Nilai (Ppn) 11% 9,128,507.14 PROGRESS RENCANA 74.903 72.545 9,128,507.14
TOTAL 92,114,935.71 DEVIASI 25.097 - 27.455 92,114,935.71
DIBULATKAN 92,114,000.00 - 92,114,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek