Vertically Check

PROJECT : HDB CENTRAL AREA C8

DATE : 26.08.2023

Y (+)

X (-) 13mm X (+)

22mm

Y (-)

ITEMS
Pile No. G22-3
Diameter (mm) 1000
Casing Top Level (mRL) 103.840
Plumping depth (m) 6.30
Inclination ratio (max value) 1:286

………………. ………………… …………………

Piling Contractor Rep Main Contractor Rep RE/RTO’s Rep