You are on page 1of 12

Job Number Sheet

Job Title
Client
Your details here
Calcs by Checked by Date

Circular column design E14

Pile design by PROKON. (CirCol Ver W5.0.02 - 10 Jun 2022)

Concrete Design code: BS8110 - 1997

Input Data

Pile dimensions
Pile type CFA
Pile length m 6
Pile diameter mm 500
Pile section Circular
Increased Base~% 30

Safety factors
Shaft 3
End bearing 4

Design parameters
K 1.05
Capacity when founded in rock
Shaft %UCS 10
Base %UCS 450.00

Settlement parameters
K1 2
K2 0.2
K3 1.0
S/EB ratio 5
Fines 30

Design Load: 44.38

c UCS
Layer Depth Material Consistency H2O Yd p0' (MPa) delta Nq (kPa) f (kN/m2)

1 2.5 Sand Very Dense 20 25.0 35 50 18.38


2 5 Sand Medium Dense x 16 57.5 25 34 20 40.72
3 6 Sand Medium Dense x 18 69.0 37 20 54.59
x 73.0 0.00

Output values:

Calculation of layer and total capacities:

Layer 1

Calculation of p0

Dry density
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

d = 20.00

Thickness

t = 2.50

d. t
p0 =
2
20 ×2.5
=
2
= 25.000

c = Kv. p0. tan(d )


= 1.05 ×25 ×tan(35 )
= 18.380

Layer friction capacity

f = f . c. t . p
= .5 ×18.38 ×2.5 ×p
= 72.178 kN

Layer bearing capacity

q = 0 kN

Layer total capacity

Cap = f + q
= 72.18 + 0
= 72.180 kN

Layer 2

Calculation of p0

Dry density

d = 16.00

Thickness

t = 2.50
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

The layer has water


Density of previous layer

da = 20.00

Thickness previous layer

ta = 2.50

p0 for previous layer

p0a = 25.00

(d - 10 ). t da. ta
p0 = + p0a +
2 2
(16 - 10 )×2.5 20 ×2.5
= + 25 +
2 2
= 57.500

c = Kv. p0. tan(d )


= 1.05 ×57.5 ×tan(34 )
= 40.723

Layer friction capacity

f = f . c. t . p
= .5 ×40.723 ×2.5 ×p
= 159.919 kN

Layer bearing capacity

q = 0 kN

Layer total capacity

Cap = f + q
= 159.92 + 0
= 159.920 kN

Layer 3

Calculation of p0
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Dry density

d = 18.00

Thickness

t = 1.00

The layer has water


Density of previous layer

da = 6.00

Thickness previous layer

ta = 2.50

The previous layer has water


p0 for previous layer

p0a = 57.50

(d - 10 ). t (da - 10 ). ta
p0 = + p0a +
2 2
(18 - 10 )×1 (16 - 10 )×2.5
= + 57.5 +
2 2
= 69.000

c = Kv. p0. tan(d )


= 1.05 ×69 ×tan(37 )
= 54.595

Layer friction capacity

f = f . c. t . p
= .5 ×54.595 ×1 ×p
= 85.758 kN

Layer bearing capacity

q = 0 kN

Layer total capacity


Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Cap = f + q
= 85.758 + 0
= 85.758 kN

Layer 4

Calculation of p0

Dry density

d = 18.00

Thickness

t = 0.00

The layer has water


Density of previous layer

da = 8.00

Thickness previous layer

ta = 1.00

The previous layer has water


p0 for previous layer

p0a = 69.00

(d - 10 ). t (da - 10 ). ta
p0 = + p0a +
2 2
(18 - 10 )×0 (18 - 10 )×1
= + 69 +
2 2
= 73.000

c = Kv. p0. tan(d )


= 1.05 ×73 ×tan(0 )
= 0.0000×100

Layer friction capacity

f = f . c. t . p
= .5 ×0 ×0 ×p
= 0.0000×100 kN
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Layer bearing capacity

q = 0 kN

Layer total capacity

Cap = f + q
=0 +0
= 0.0000×100 kN

Total friction capacity - all layers

ftot = 317.86 kN

Total bearing capacity - bottom layer

btot = 0.00 kN

Total capacity

Cap = f tot + btot


= 317.86 + 0
= 317.860 kN

Total design friction capacity - all layers

f tot
f totd =
SF
317.86
=
3
= 105.953 kN

Total design bearing capacity - bottom layer

btot
btotd =
SF
0
=
4
= 0.0000×100 kN
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Total design capacity

Capd = f totd + btotd


= 105.95 + 0
= 105.950 kN

Settlement calculations:

Everett settlement at SLS:

Assume a value d = 0.36 mm

Ultimate adhesion transfer

Cult = Cf . PF
= 317.86 ×.3
= 95.358 kN

Ultimate inter granular transfer

Fult = Cf . (1 - PF)
= 317.86 ×(1 - .3 )
= 222.502 kN

Ultimate end bearing transfer

qult = 0.00 kN

Adhesion force transfer

. .
Fa = Cult . 1 - e -1 K1 d
= 95.357 × 1 - e -1 ×2 ×.36145
= 49.076 kN

Friction force transfer


Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

. .
Ff = Fult . 1 - e -1 K2 d
= 222.5 × 1 - e -1 ×.2 ×.36145
= 15.517 kN

Side shear force transfer

F = Fa + Ff
= 49.076 + 15.517
= 64.593 kN

S/EB ratio rat = 0.05

X value

d
X=
rat . sdia
.36145
=
.05 ×500
= 0.0145

End bearing transfer

K
q = qult . X 1 - X 3
1
= 0 ×.01446 1 - .01446
= 0.0000×100

Total force capacity

Ft = F + q
= 64.593 + 0
= 64.593 kN

This calculated capacity is close to the SLS pile loading of 44.38 kN


Therefore the assumed settlement at SLS is considered accurate.

Everett settlement at ULS:

Assume a value d = 0.54 mm

Adhesion force transfer


Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

. .
Fa = Cult . 1 - e -1 K1 d
= 95.357 × 1 - e -1 ×2 ×.54217
= 63.114 kN

Friction force transfer

. .
Ff = Fult . 1 - e -1 K2 d
= 222.5 × 1 - e -1 ×.2 ×.54217
= 22.865 kN

Side shear force transfer

F = Fa + Ff
= 63.115 + 22.865
= 85.980 kN

S/EB ratio rat = 0.05

X value

d
X= .
rat sdia
.54217
=
.05 ×500
= 0.0217

End bearing transfer

K
q = qult . X 1 - X 3
1
= 0 ×.02169 1 - .02169
= 0.0000×100

Total force capacity

Ft = F + q
= 85.979 + 0
= 85.979 kN
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

This calculated capacity is close to the ULS pile loading of 66.57 kN


Therefore the assumed settlement at ULS is considered accurate.

Concrete Design calculations:

Design code used: BS8110 - 1997

Concrete area Ac

p. dia2
Ac =
4
p×500 2
=
4
= 196.3×103 mm²

Calculate nominal reinforcement:

Nominal reinforcement

Anom = 0.004 . Ac
= 0.004 ×196350
= 785.400 mm²

Calculate required reinforcement:

Reinforcement area At

P - 0.4 . f cu. Ac
At =
0.8 . f y
66570 - 0.4 ×30 ×196350
=
0.8 ×450
= -6 360.0833 mm²

Since the calculated At < Anom, set At = Anom

Summary of output
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Summary of Output
Design Load (kN) 44.38
Calculated Capacity (SLS) (kN) 105.95
Shaft Stress (kPa) 226.03
Everett Settlement (SLS) (mm) 0.36
Everett Settlement (ULS) (mm) 0.54
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Very Dense Sand


f= 18.38 kPa

2.50 m 2.50 m

Medium Dense Sand


f= 40.72 kPa

5.00 m
Medium Dense Sand
f= 54.59 kPa
6.00 m

Medium Dense Sand


f= 0.00 kPa

9.00 m

You might also like