Introduction
Project Management Program – “Quality Management Walkabout” carried out on January 9th ,
2024 - 09.30 hrs.
Attendees
Page 1 of
FPSO Voyageur Spirit
!
Access platforms & stagings not
1 securing properly, need Dhanesh Dhanesh
Improvement .- Voyageur
!
Un-Qualified Tack Welder doing
Tack weld observed during Dhanesh Dhanesh
2 Walkabout – Brasilia
!
Tack Welding Size & Quality not
3 meeting WPS Requirements –
Dhanesh Dhanesh
Brasilia (Repated Observation,
NCIR Will be Issued)
Page 2 of
FPSO Voyageur Spirit
!
4 Calibiration Stricker for Portable Dhanesh Dhanesh
Quiver not available. - Brasilia
5 Latest Rev. WPS available at Dhanesh N/A
work place.- Voyageur
Assembly Drawing Latest Rev
6 verified and found Ok.- Voyageur Dhanesh N/A
Page 3 of
FPSO Voyageur Spirit
Proper Strong back provided on
7 fit-up Stage, to avoid Distortion Dhanesh N/A
during welding. - Brasilia
Run-on Plate provided with
Same grade, thick &
8 Configuration of the weld Joint Dhanesh N/A
found Acceptable. - Brasilia
Fit-up Joint Configuration and
Hi-lo Verified againts WPS &
9 Dhanesh N/A
Drawings found acceptable.
- Brasilia
Page 4 of
FPSO Voyageur Spirit
Weld traceability matrix box
provided with all required details
10 Dhanesh N/A
and found acceptable. - Brasilia
Material marking and traceability
verified as per drawing found
11 Dhanesh N/A
acceptable. - Brasilia
Welder Qualification Checked as
per Project approved WQT list,
12 Dhanesh N/A
WL - 211 is Qualified for FCAW
Process.
Page 5 of
FPSO Voyageur Spirit
Welding machine Calibiration
13 Dhanesh N/A
Verified and found satisfactory.
Cutting & Beveling Provided as
per drawing found acceptable. -
14 Dhanesh N/A
Brasilia
Conclusion:
Project Quality Walkabout carried out for FPSO Voyageur Spirit & FSO Brasilia Project by
ENI, Altera & DDWD representatives. Ongoing activities at Mubarak Marine shop are in
line with Project requirements, except for serial No.1 TO 4 where immediate action is
required from Mubarak Marine.
Page 6 of