Quality Walkabout Report 09-01-2024 # Week 02

You might also like

You are on page 1of 6

FPSO Voyageur Spirit

Quality Management Walkabout Report


Doc. No: VOY-QW- 014 (Week # 02)

Introduction

Project Management Program – “Quality Management Walkabout” carried out on January 9th ,
2024 - 09.30 hrs.

Department/Sub-Contractor Fabrication / Mubarak Marine


Location Mubarak Marine Workshop (DMC)

Attendees

Mr. John ENI QC Lead.

Mrs. Anne Britt Haag ALTERA HSSEQ Manager.

Mr. Tapan Bhattacharya ALTERA QC

Mr. Ali Basheer DDWD-Project Quality Manager


Mr. Rajaganapathy. S DDWD-QC Inspector

Mr. Hassan Mubarak Marine –Project Engineer

Mrs. Meryam Mubarak Marine –Project Engineer

Mr. Dhaneesh Vellilapulli Mubarak Marine – QA / QC Engg.

Page 1 of
FPSO Voyageur Spirit

Quality Management Walkabout Report


Doc. No: VOY-QW- 014 (Week # 02)

Observation/ Responsible Action to


S/No Image
(In-process inspection reference) Dept/Supervision be taken by

!
Access platforms & stagings not
1 securing properly, need Dhanesh Dhanesh
Improvement .- Voyageur

In process inspection number:


S11020-IP-00148

!
Un-Qualified Tack Welder doing
Tack weld observed during Dhanesh Dhanesh
2 Walkabout – Brasilia

In process inspection number:


S11021-IP-00065

!
Tack Welding Size & Quality not
3 meeting WPS Requirements –
Dhanesh Dhanesh
Brasilia (Repated Observation,
NCIR Will be Issued)

In process inspection number:


S11021-IP-00065

Page 2 of
FPSO Voyageur Spirit

Quality Management Walkabout Report


Doc. No: VOY-QW- 014 (Week # 02)

Observation/ Responsible Action to


S/No Image
(In-process inspection reference) Dept/Supervision be taken by

!
4 Calibiration Stricker for Portable Dhanesh Dhanesh
Quiver not available. - Brasilia

In process inspection number:


S11021-IP-00065


5 Latest Rev. WPS available at Dhanesh N/A
work place.- Voyageur

In process inspection number:


S11020-IP-00148


Assembly Drawing Latest Rev
6 verified and found Ok.- Voyageur Dhanesh N/A

In process inspection number:


S11020-IP-00148

Page 3 of
FPSO Voyageur Spirit

Quality Management Walkabout Report


Doc. No: VOY-QW- 014 (Week # 02)

Observation/ Responsible Action to


S/No Image
(In-process inspection reference) Dept/Supervision be taken by


Proper Strong back provided on
7 fit-up Stage, to avoid Distortion Dhanesh N/A
during welding. - Brasilia

In process inspection number:


S11021-IP-00065


Run-on Plate provided with
Same grade, thick &
8 Configuration of the weld Joint Dhanesh N/A
found Acceptable. - Brasilia

In process inspection number:


S11021-IP-00065


Fit-up Joint Configuration and
Hi-lo Verified againts WPS &
9 Dhanesh N/A
Drawings found acceptable.
- Brasilia

In process inspection number:


S11021-IP-00065

Page 4 of
FPSO Voyageur Spirit

Quality Management Walkabout Report


Doc. No: VOY-QW- 014 (Week # 02)

Observation/ Responsible Action to


S/No Image
(In-process inspection reference) Dept/Supervision be taken by


Weld traceability matrix box
provided with all required details
10 Dhanesh N/A
and found acceptable. - Brasilia

In process inspection number:


S11021-IP-00065


Material marking and traceability
verified as per drawing found
11 Dhanesh N/A
acceptable. - Brasilia

In process inspection number:


S11021-IP-00065


Welder Qualification Checked as
per Project approved WQT list,
12 Dhanesh N/A
WL - 211 is Qualified for FCAW
Process.

In process inspection number:


S11020-IP-00148

Page 5 of
FPSO Voyageur Spirit

Quality Management Walkabout Report


Doc. No: VOY-QW- 014 (Week # 02)

Observation/ Responsible Action to


S/No Image
(In-process inspection reference) Dept/Supervision be taken by


Welding machine Calibiration
13 Dhanesh N/A
Verified and found satisfactory.

In process inspection number:


S11020-IP-00148


Cutting & Beveling Provided as
per drawing found acceptable. -
14 Dhanesh N/A
Brasilia

In process inspection number:


S11021-IP-00065

Observation/ Responsible Action to


S/No Image
(In-process inspection reference) Dept/Supervision be taken by

Conclusion:
Project Quality Walkabout carried out for FPSO Voyageur Spirit & FSO Brasilia Project by
ENI, Altera & DDWD representatives. Ongoing activities at Mubarak Marine shop are in
line with Project requirements, except for serial No.1 TO 4 where immediate action is
required from Mubarak Marine.