You are on page 1of 4

Task Time (Sec) ZZ

T1 43
T2 53
T3 59
T4 68
T5 49
T6 52
T7 46
T8 55
T9 53
T10 61
Mean 53.9 - The base
Std Dev 7.4
N 10
- The bands
95% Confidence Interval: 4.6 Margin of error 2.27937997 51.62062
90% Confidence Interval: 3.8 Margin of error 1.91291597
80% Confidence Interval: 3.0 Margin of error 1.49040645
58.5
Task Time (Sec) ZZ (Initial Design) Fariz (Redesign)
T1 43 45
T2 53 53
T3 59 46
T4 68 66
T5 49 52
T6 52 52
T7 46 40
T8 55 60
T9 53 37
T10 61 50
Mean: 53.9
Std Dev: 7.4
N: 10

90% Confidence Interval: 3.8


Margin of error 1.9

t.test
Participant Initial design Redesign
P1 2 3
P2 1 2
P3 3 3
P4 5 5
P5 4 5
P6 2 3
P7 1 2
P8 3 3
P9 2 2
P10 1 2
Mean:
90% Confidence Interval:
Margin of error

t.test (paired)

You might also like