You are on page 1of 20
REQUEST FOR TECHNICAL APPROVAL hie BERD — ee ees ikteeenetee 5 TERETE} Hljuomenn Tl ¢ Eire a = Samara] uc a Ce © Fone RTA-TCFE-M-GA-704-01 | Di Ttestns sessence a ee i on et ces cs eee Method Statement for Instalation of Car Parking Shade Structure Seareent stese Inte dcunenshan etn ord or [) woonxccron [rescence come CS] Secon sume Ech vt ect tet oer (J conascr a resuenar [Eng:Yazeed M. ALGhamal dul LAUT emir esti OO were ‘sarees Compary Goer use Contractor ALsALom EXPANSION OF TEMPORARY Method statement For Installation of car construction racumes) | parking shade Structure Contract No, 6600050455 PKG-29 &pgnussl gSoyt ia ‘Saudi Aramco oc. No, | mns-MS-025-08, BiNo, | 20-08003-0018 Rev.No. | 02 Mobarak M. Al-Salomi Cont. Co. EXPANSION OF TEMPORARY CONSTRUCTION FACILITIES- Package —29 Contract: 6600050455 BI No. : 10-09003-0014 ISSUE STATUS: or | 18-06-2023 | Tssued Sor review and > uo PPI ae = Sy ol Coneurred Checked by | Reviewed by | Reviewed by | by Rev.| Date Reason for Issue cu eera nM i > COMMENT RESOLUTION SHEET cozaar El : ts Ademco LIENT, SAUDI ARAMCO MMS TRANS.REFNO MMS-MS-025.01 PROJECT TITLE MARJAN DEVELOPMENT PROGRAM TCF EXPANSION - PACKAGE 29 COMPANY TRANS. REE 2 SATGPPD-TCREST2: No ‘CONTRACTIBENO. (6600050455/B1-10-09003-0014 DATE w.062003 DOC NUMBER RTASTCFE 0-6 CRS NUMBER a DOC REVISION i DOC DESCRIPTION ‘Method Statement for Installation of Car Parking Shade Structure (ZAMIL) Sr.No. ‘Saudi Aramco Comments CONTRACTOR RESPONSE Remark 1 | the document atached in metodstatementare not ete to he 29 Cone pastge No papa ‘ty ocanen ho wen and ed ye angry ‘uate evewed he crater Satins 2 __| bevomt ero samt congny ttre apo sraeon : Prepared oy: Checea/Reviewed 4: ‘Approved By: company Mobarak MAL Slot Mobark MAL Salemi Sau aromea name Waleed Mian Nonammed Abdu Latt SIGNATURE ss yw 7 NL DATE 20/f (Yor ‘SAUDI ARAMCO TANAJIB GAS PLANT PROJECTS DEPARTMENT INFRASTRUCTURE & THIRD PARTY COORDINATION DIVISION ‘SAPMT Sie Office, Tanajb DOCUMENT TRANSMITTAL TransmitalNo: __ SA-TEPPD-TOFEXT-25072025, Date: May 22,2023 To: Moberak MeraiALSalom Go. Lis Contract /81No, 6800060468 PO Box 122207 Riyadh 11721 stn MAHDI MUBARAK AL-SALOMI Contactor Representative — ony: 1 Administration 11 Project engineer 1 contot 1 asrmateria OO satety EH] Fite ‘Transmitted herewith are the following DOCUMENT TYPE T_catcuarionsy T_omawmais) rors) Oy _erene) _reronrsy [_ommer pocumenisy THRE OF ACTION Likeriow Lowrousemecoro _ [_Jreview [xjuroare Lotwens TERING. REFERENCE SECRETION 1 RTATCFEX0-GA704 _|Metnod Statement for nstalaton of Car Parking Shade Sucre fnewanis: |Correct & Resubmit. Please refer to alteched comments sheet ws 5-22-23 TGPPDIETECD/TOF Expansion Senices Received by! Nome: Date: Signature 95n Je1eus9 fueduiog ‘cowry Ipneg 28019 ~9 /odo -0 : (910 SIS) puto bp Lefeg sav jf a ‘FRIgNS-eE P 45emTOD “uonsa{ar ioae 0} jeaordde / maynas soy Auedwoo juqn: PweH | Jouid jauuosiad sayenb oem |e 4q pauiiis pue maraas ag pjnoys swwawnaop Arend iL 62 84d ayy oa pareati04| POSH | areauoumns pornou uw paypene swuatunoop ayy, | TD | 1 (10) sean | swuvnay | 010), | -asNousa uoLovanoo fa SINBHNOD ‘onetea | “ong e707 eh Aen seg FON enwusuEs, ys oN weunoeg = POL-VO-O*GIOL-VLY :ON fenweuEs, : & ‘o>wDJ0 Ipnos Hos imac aumonns apeys duped 409 40 uone|iesu 40) 1uawarerS PONEN HOL-V9-O-¥94D1-V1M 907 108LNOD SINaNNOD WoIsinig UoNeUIpI00D Aued-puNyy * eanjonnseAyUL ANSWLVd30 SLO3POUd INVTd SV9 BIYNVL Contractor dine I gSoljl <=. Method statement For | @seu!asoy! Installation of car Doc. No. | MMs. 025-02 EXPANSION OF TEMPORARY Tino, | 10030030018 ConstauctionFacums) | parking shade Structure ‘contract No. 6500050455 PKG-29, fer no. | 02 Revision No. Revision Date Page Scope of Revi 00 1605-2008 all Tissue or 19062003 al Tie Sits & package 0 Zamil¥ Zamil Architectural Industries Architectural Zamil Shade PROJECT TOF-PKG26- Car parking shade [Dos, Ref. No. ZA-SHD-MSINS-03 Revt Material ‘Steel and HOPE Fabric Date issued; 18.06.2023, Nature + Car Parking Shades Method Statement For Installation of car parking shade Structure ROLE ‘TITLE SIGNATURE DATE CMs Reviewer Projects ees 18.08.2023 Approved by Spaaion 18.08.2023 Manager Zamil¥ Zamil Architectural Industries Architectural Zamil Shade PROJECT = TCF-PKG-20- Car parking shade [Doc Ref, No_: ZAFSHD-MS-INS.03 Rev.01 ‘Material__:Steel and HDPE Fabric Date Issued -18.6.2023 Nature + Car Parking Shades Mi. vil. vill. List of Contents GENERAL PURPOSE & OBJECTIVE SCOPE OF WORK REFERENCE STANDARDS ILL PROJECT SPECIFICATIONS LIL RELATIVE STANDARDS ROLES & RESPONSIBILITIES (CONTRACTOR & SUB-CONTRACTOR) IV. PROJECT MANAGER IVII_SITE SUPERVISOR / FOREMAN Ill SAFETY SUPERVISOR / SAFETY OFFICER IVAV QUALITY CONTROL MATERIAL, TOOLS & EQUIPMENT Vi MATERIALS OF CONSTRUCTION Vill TOOLS FOR CONSTRUCTION (e.g. HAND TOOLS, POWER TOOLS) HEALTH, SAFETY & ENVIRONMENTAL (HSE) VLI_ PPE (PERSONNEL PROTECTIVE EQUIPMENT) CONSTRUCTION PROCEDURES VIL SITE PREPARATION VIl.IL WORK ACTIVITY/SITE EXECUTION STORAGE AND HANDLING OF MATERIAL PAGE NO ZamilF Zamil Architectural Industries Architectural Zamil Shade PROJECT: TCF-PKG-29 Car parking shade [Doc Ref No_: ZAl-SHD-MS-INS-03 RevO1 Material___Steel and HOPE Fabric Date Issued 18.6.2023 Nature: Car Parking Shades 1. GENERAL PURPOSE & OBJECTIVE The purpose of this procedure is to describe the material handling, safety requirements, and method of installation of HDPE car parking shade project. iM. SCOPE OF WORK The scope of work is to install the car parking shade; steel structure installation and followed by HDPE (roof covering fabric) for car parking shade project. Il REFERENCE STANDARDS ILL PROJECT SPECIFICATIONS Allsteels plates ASTM A36 All steel Sections -Pipes ASTM AS3_/ A500 or Equivalent ee ‘ASTM A193 Gr B7 /Gr 8.8 Structural Steel Welding Techniques AWS DLA Welders | welder certication & 1b card Roof Cover HOPE Fabric LIL RELATIVE STANDARDS Structural Steel Welding Techniques aes Painting System Powder coating Quality control system QMs-1so 90012015 3/Pa Zamil7 Zamil Architectural Industries Architectural Zamil Shade PROJECT =: TOF-PKG-29- Carparking shade [Dos Ref No ZAI-SHD-MS.INS-03 Rev.0t Material___-Steel and HOPE Fabric Date lssued = 186.2023 Nature + Car Parking Shades IV ROLES & RESPONSIBILITIES (CONTRACTOR & SUB-CONTRACTOR) IVA PROJECT/SITE ENGINEER Project engineer is to plan and forecast the construction schedule process and the economic and technical preparation (tools & equipments) to co-ordinate the work on the. site installation with all necessary safety measures. Site engineer shall visit the site and check for the site preparation & monitor the site activities of non-standard shade structure (new design scope of work) and for standard shade work (this project is ZAI -Standard shade design). project engineer shall co- ordinate/monitor the site work by review the site report from site supervisor. [VAI SITE SUPERVISOR / FOREMAN Site supervisor to brief installation team on method statement, risk assessment and material data sheet, prior to commencement of work. Assembly method, joint surface, joint direction, span direction, tolerances and precision/manageability liftablity and use of tools shall be identified and shall explain to installation team members. Scaffolding working platform are often used to ensure the safe working for the erection of membrane. Scaffolds can be stationary or wheeled depending on the site & structural system. Monitor the wind speed to control the lifting elements. ‘And shall check for the desired scope of the work is completed IVAlll SAFETY SUPERVISOR / SAFETY OFFICER ‘Safety supervisor shall responsible for the implementation/verification of the activities are performed under the safety measures. Example: sign boards; barricade, equipment inspection; Personnel protective equipment’s are used in the working areas; etc. IV.V QUALITY CONTROL Quality Inspector shall responsible for the performing the stage wise inspection in progressive site work as per the planned interval & inspection call; in order to report/ confirm the compliance of project requirements. Zamil¥ Zamil Architectural Industries Architectural Zamil Shade PROJECT _: TOF-PKG-29~ Car parking shade [Doc. Ref. No_: ZAI-SHD-MS-INS-03 RevOt Material___Steel and HOPE Fabric Date lssued = 186.2023, Nature + Car Parking Shades Quality manager shall responsible for the implementation of stage wise inspection in progressive site work as per the planned interval & inspection call; to verify the compliance of project requirements with reference to inspection and test paln/standards. IV MATERIAL, TOOLS & EQUIPMENT \V.L_ MATERIALS OF CONSTRUCTION (APPROVED WITH REF - MATERIAL DATA SHEET ‘Materials: 1) Post with SHS 200mm x 200 mm x6mm thick 4m height with weight 250kgapprox. 2) Beam with dia 100 mm x 100mm x 3mm x 6.5 m length -125 kg approx. 3) Beam for fabric dia 89.5 mmx 4.05mm x 6 m —50kg aprox. 4) Brace dia 80 mmx 3mm x 5.6 m — 80 kg approx. 5) Rafter - 30kg approx... 5) HDPE Fabric & Accessories (Bolt, nut, washer.) 30kg approx. Vull_ TOOLS & EQUIPMENTS FOR CONSTRUCTION (e.g. HAND TOOLS, POWER TOOLS) Tools and Equipment's that will be used, depending on site conditions: 1) Scaffolding,chain block. 2) Boom truck with required boom length. 3) All accessories (bolts & nuts) 4) Tools box which contains measuring tape, sprit level, spanners (12, M16, Ma, 20), hammers, screw driver, lever, chain block, fabric hole puncher, soldiering gun...ete. S[Page Zamily Zamil Architectural Industries Architectural Zamil Shade PROJECT _: TOF-PKG-29- Car parking shade [Doc Ref No: ZAI-SHD-MS.INS-03 Rev.0t Material___Steel and HDPE Fabric Date lssued 18.86.2023 Nature + Car Parking Shades \VI HEALTH, SAFETY & ENVIRONMENTAL (HSE) VII PPE (PERSONNEL PROTECTIVE EQUIPMENT) P.P.E REQUIREMENTS “Check” Safety Harness SCBA, Static Line Airline Steel Capped Boots ir Purifying Respirator Hard Hat Confined Space Harness Dark Safety Glasses Gloves - Cotton (Clear Safety Glases| Gloves —Hyflex (Nitrile) Goggles Gloves -Leather Riggers Face Shield Sun Screen O;O/}O;/O/8/8/8/e8/O/8 O/O;O;O};O}BsoO;/oO;o/a Hearing Protection Each job site activity shall be carried out with pre-planned safety measure to bring down the level of safety severity. Loss control report shall be performed by the safety officers if any hazard identifications; near-miss; safety violations etc... This loss control report is to analysis; whether any changes needed in the job safety analysis/procedure, Zamil’ Zamil Architectural Industries Architectural Zamil Shade PROJECT =< TCF-PKG-29- Car parking shade [Doc Ref. No_: ZAF-SHD-MS-INS-03 Rev Material__Steel and HDPE Fabric Date Issued = 186.2023, ‘Nature Car Parking Shades CONSTRUCTION PROCEDURES : VILL SITE PREPARATION Site supervisor to brief installation team on method statement, risk assessment and material data sheet, prior to commencement of work. ‘Assembly method, joint surface, joint direction, span direction, tolerances and precision/manageability /litablity and use of tools shall be identified. ‘Scaffolding working platform are often used to ensure the safe working for the erection of membrane. Scaffolds can be stationary or wheeled depending on the site & structural system, Monitor the wind speed to control the lifting elements. VILIL_ WORK ACTIVITY/SITE EXECUTION (e.g. INSTALLATION, ERECTION, and ASSEMBLY PROCEDURE) i) Installation of Steel Structure & Fabric 1) Packed bundles of shade materials will be moved by using forklift or boom truck from ‘Storage area to designated Location and will be unpacked then. 2) First item to be installed are the column. Installation to be done for two columns for a Single shade. 3) Column shall be taken out of its bundle and the column will then be lowered to ground over mat/ plastic sheet and support 4) Column will be lifted from to upright position using webbing and boom truck and lowered in its final position and anchored to the bolt as in (refer stage 01 drawing). Similarly fix the second column. ** Recommended to use boom truck for lifting by means of lifting belts. ** Repeat the same for all Post. And tighten all the bolts to snug tight as recommended, Zamil Zamil Architectural Industries Architectural Zamil Shade PROJECT = TCF-PKG-29- Car parking shade [ Doc. Ref. No_: ZAI-SHD-MS-INS-03 Rev.01 Material___Steel and HDPE Fabric Date Issued 186.2023, Nature: Car Parking Shades 5) Packed bundles of beam to be unpacked and lifted by boomtruck to the required height and to betemporarily supported until bolted are fixed as shown in drawings (also refer stage O2sketch). 6) Connect the brace between the beams and post as shown (refer stage 03 sketch). 7) After brace connection, Rafters of the shade to be installed at ground level and lifted with the cross piece at the midddle of the shade and fixed to the cantilever beam. (refer stage 04 sketch), And tighten all the bolts to snug tight as recommended. 8) Clean the floor and spread the fabric over the steel structure using nylon rope for support. 9) spread the fabric over the steel installed and inster fabric support beam inside the provided loop on thefabric , and fix with bolts and nuts with both columns 10) now insert the front fabric support beams through fabric loop provided & bolten between the beam using heavy structural bolts as per the drawing. Refer the stage 05& 6 sketch. Pulltension the fabric support beam appropriately by using webbing belt with chain block if required webbing belt shall be tied to boomtruck for tensioning support for the fabric by using chain block. target to achieve the desired shape of the structure as per the engineering detail drawings, Find the below sketches for progress of erection work of car parking shades. ii) Checklist for installation of structural steel & fabric Straightness of installed post/baseplate by using spirit level. And anchoring of bolts with snug tight as recommended Bolted connection of all bolts with Snug tight and marking to be provided for tightened bolts. 3) All materials and accessories shall be free of damage and deformities. If any non-conformance occurred during the installation; like (wrong fabrication of stee! structure and etc...). SY STAGE -02 (Steel beam Installation) STAGE -05 ( HDPE-Fabric Insertion in beam) STAGE -06 ( HDPE-Fabric fixation with post & beam) (Bolt Tightening)

You might also like