You are on page 1of 13
Page 1 of 4 TAS Specs Sr eee Document Number:RP 1° Organization:API 4-96 Document Number| Pubs [Bottom Loading and Vapor Recovery for MC-306 Tank Motor Vehicles Seventh Edition (R 1995) R995) Recommended Practice for Testing Well Cements Twenty-Second Edition; Addendum 1 October 1999; Addendum 2 November 2000 (Withdrawn) Recommended Practice for Application of Cement Lining to Steel | Tubular Goods, Handiing, Installation and Joining Third Edition; ISO 10409 Recommended Practice for Performance Testing of Cementing Float Equipment Third Edition; ANSVAPI 10F/1SO 18165-2001 (2000) ACTY | Stee! Pipelines Crossing Railroads and Highways APLRP 1004 | 01 Jan 1988 | ACTV APERP10B | 01 Dec 1997] ACTV 01 Jan 1994 | WDRN} APIRP 10E, APLRP10F | 01 Apr 2002 ACTV APL RP 1102_| 01 Jan 1993, APiRP 1107 | 01 Jan 1991 APIRP 1109 _| 01 Jan 1993 APERP 1110 _ [01 Mar 1997 Pipeline Maintenance Welding Practices RP 1107 is now part of 1104 19th Edition; Errata 1993 ACTY [Marking Liquid Petroleum Pipeline Facilities actv ACTV | Pressure Testing of Liquid Petroleum Pipelines Fourth Edition ign, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Design) Third Edition Developing a Highway Emergency Response Plan for Incidents Involving Hazardous Materials Third Edition Design of Solution-Minded Underground Storage Facilities R(1999) 01 Jul 1999 | ACTV APLRP 1111 }01 Nov 1997] ACT APIRP 1112 APIRP 1114 [ 01 Jan 1994 [ ACTV APIRPIII7 | 01 Jan 1996 [ACTV ‘APIRP 1118 | 01 Jan 1991 [ WDRN] (Withdrawn) Training and Qualification of Liquid Pipeline Controllers APLRP 1120 _| 01 Jan 1992 [ ACTY | Training and Qualification of Liquid Pipeline Maintenance Personnel R(1995) a Development of Public Awareness Programs by Hazardous Liquid Pipeline APLRP 1123, | 01 Jan 1996 | act |Onerer APIRP 1124 | OL Jan 1991 | ACTV | Ship, Barge, and Terminal Hydrocarbon Vapor Collection Manifolds R(1995) APLRP 1125 [01 Feb 1991 | ACTV | Overfll Control Systems for Tank Barges First Edition R(1995) APLRP 1127 | 01 Jan 1993 | ACTV [Marine Vapor Control Training Guidelines APIRP1129 | 01 Jan 1996 | ACT | Assurance of Hazardous L APLRP 1139 _| OL Jan 1993, | (Withdrawn) Training Guidelines for Tank Ship Personnel APLRP 1140 _| 01 Jan 1991 (Withdrawn) Guidelines for Developing Bridge Management Teams [Guidelines for Confined Space Entry on Board Tank Ships in the Petroleum Industry [[aerne ran [ oi un 2000 [ ACTY | Recommended Pcie for Care and Use of Subsurface Pumps Fouth Elion Recommended Practice for Care and Handling of Sucker Rods Eighth Edition; [aerne oe [0 ox 1H cry Stn io 150 Sup BSL Movement of In-Service Pipelines APIRP 1141 | 01 Jan 1994] ACTV ‘APIRP ITER | 01 Jan 1990 | ACTV | Recommended Practice for Guarding of Pumping Units http://www ihsere.com/egi-bin/dodiss2?201=80552063560000061326800200843042040... 11/21/2002 Page 2 of 4 Recommended Practice for Installation and Lubrication of Pumping Units R (2000) Recommended Practice for Design Calculations for Sucker Rod Pumping, Systems (Conventional Units) Fourth Edition R(2000) RECOMMENDED PRACTICE FOR GROUNDED 830-VOLT, THREE- [PHASE ELECTRICAL SYSTEM FOR OIL FIELD SERVICE FIRST EDITION ‘APLRP.LIPGT | 01 Jan 1992 [ ACTV [Recommended Practice for Packaged Combustion Gas Turbines R(2000) RECOMMENDED PRACTICE FOR ELECTRIC SUBMERSIBLE PUMP. INSTALLATIONS SECOND EDITION RECOMMENDED PRACTICE FOR ELECTRIC SUBMERSIBLE PUMP. INSTALLATIONS FIRST EDITION Recommended Practice for the Operation, Maintenance and Troubleshooting of Electric Submersible Pump Installations R(2000) [Recommended Practice for Electrical Submersible Pump Teardown Report Third Edition R(1999) [Recommended Practice for Electric Submersible Pump Testing Second Edition; Effective Date: 10/01/1997 [Recommended Practice for Electric Submersible Pump Installations Second Edition [Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations Third Edition APIRP11G | 01 Jan 1994 | ACTV APLRPLIL | 01 Jan 1988 | ACTV APIRP LIM | 01 Jul 1973 | HIST APIRP.LIR [30 May 1986] HIST APLRPUIR | 01 Mar 1980] HIST APLRPL 01 Jan 1994 | ACTV APLRP LIS! | 01 Sep 1997 | ACTV. APLRP 1182 | 01 Aug 1997] ACTV. ‘01 Mar 1999] ACTV APLRP.11S4 | 01 Jul 2002 | ACTV RP11SS | 01 Feb 1993 | ACTV | Recommended Practice for Application of Electric Submersible Cable Systems [Recommended Practice for Testing of Electric Submersible Pump Cable Systems (1999) Recommended Practice on Application and Testing of Electric Submersible Pump Seal Chamber Sections R(1999) «fan 1953 | acy [Rezammended Pract on Electric Submersible Pump System Vibrations R APERP11S6 | 01 Jan 1995 | ACTV APLRP 11S7 | 01 Jan 1993, APLRP 1188 APERP.LIT, RECOMMENDED PRACTICE FOR SIZING AND SELECTION OF APLRPLIU | 20 Jun 1984 | HIST | cL ECTRIC SUBMERSIBLE PUMPS FIRST EDITION. [RECOMMENDED PRACTICE FOR SIZING AND SELECTION OF ELECTRIC SUBMERSIBLE PUMP INSTALLATIONS SECOND EDITION, 'ACTY | Gas-Lift Valve Performance Testing Second Edition [Recommended Practice for Operations, Maintenance, and Trouble-Shooting of Gas Lift Installations Second Edition [Recommended Practice for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves Second Edition cry [Recommended Practice for Rep, Testing, and Seting Gas Lit Vales Second ‘cry | Recommended Practice forthe Operation, Maintenance and Testing of Firebox ACTY TI Fiame Arrestors R(2000) ‘Recommended Practice for Setting, Maintenance, Inspection, Operation and Repair of Tanks in Production Service Fifth Edition; Effective Date: 10/01/1997 [Recommended Practice for Installation and Operation of Wet Steam Generators 01 Jan 1994 | ACTY TRG 000) APIRP IU | 01 Jan 1986 | HIST APLRP11V2_| 01 Mar 2001 APLRP 11v5 | 01 Jun 1999 | ACTV 01 Jul 1999 | ACTV APIRP 11V7. | 01 Jun 1999 APLRP.I2N | O1 Jan 1994 APLRP12R1 | 01 Aug 1997 nist RECOMMENDED PRACTICE STANDARD PROCEDURE FOR FIELD OH eee ‘TESTING DRILLING FLUIDS TWELFTH EDITION; SUPPLEMENT | - 1989) http://www ihserc.com/cgi-bin/dodiss2?201=80552063560000061326800200843042040... 11/21/2002 Page 3 of 4 (SUPERSEDED BY RP 13B-1 AND RP 13-2) APIRP 138 APIRP 138-1 01 Sep 1997 Jol May 1985] HIST AcTY RECOMMENDED PRACTICE STANDARD PROCEDURE FOR FIELD TESTING DRILLING FLUIDS ELEVENTH EDITION; SUPPLEMENT 1 - 1986 Recommended Practice Standard Procedure for Field Testing Water-Based Drilling Fluids Second Edition; Addendum 1 May 2000 APLRP 133-2 APIRP 13C APIRP 13D, APIRP 13E RPG 01 Feb 1998, (01 Jan 1996 CTY ‘CTY Recommended Practice Standard Procedure for Field Testing Oil-Based Drilling Fluids Third Edition; Supplement | May 2000 Recommended Practice for Drilling Fluid Processing Systems Evaluation 01 Jun 1995 01 Jan 1993 01 Jan 1991 ACTY ACTV, WDRN| APIRP 13H [01 May 1984) HIST [Recommended Practice on the Rheology and Hydraulics of Oil-Well Drilling Fluids Recommended Practice for Shale Shaker Screen Cloth Dé (Withdrawn) Recommended Practice Standard Procedure for Drilling Mud Report Form RECOMMENDED PRACTICE STANDARD PROCEDURE FOR DRILLING FLUID BIOASSAYS (TENTATIVE) FIRST EDITION APIRP 131 APLRP.13K, (01 Jan 1996, Jo1 May 2000] ACTV ACTY Recommended Practice Standard Procedure for Laboratory Testing Drilling. Fluids Sixth Edition Testing of Heavy Brines 01 Feb 1996 ACTV Recommended Practice for Chemical Analysis of Barite Second Edition; Errata 4/25/1998 Design, Installation, Repair and Operation of Subsurface Safety Valve Systems APLRP14B | 01 Jan 1994 | ACTV | courth Edition; [SO 10417; Errata - 1996 Recommended Practice for Analysis, Design, Installation, and Testing of Basic APIRP MC] 01 Mar 2001 } ACT | surface Safety Systems for Offshore Production Platforms Seventh Edition RECOMMENDED PRACTICE FOR ANALYSIS, DESIGN, INSTALLATION pire 14 01 Nov 1986] nist | AND TESTING OF BASIC SURFACE SAFETY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS FOURTH EDITION; ERRATA - NOVEMBER 1986 APLRP 14C APIRP 14C APIRP 14E 01 Jan 1986 15 Apr 1984] HIST 01 Jan 1991 Hist AcTV RECOMMENDED PRACTICE FOR ANALYSIS, DESIGN, INSTALLATION ‘AND TESTING OF BASIC SURFACE SAFETY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS FOURTH EDITION; ERRATA - NOVEMBER 1986 RECOMMENDED PRACTICE FOR ANALYSIS, DESIGN, INSTALLATION | AND TESTING OF BASIC SURFACE SAFETY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS THIRD EDITION; ERRATA - JUNE 1984 Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems R(2000) APIRP 14F APLRP 14G. APERP 14H APIRP 14FZ | 01 Sep 2001 01 Jan orn 93 | 01 Jul 1994 acTV AcTV [Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilites for Unclassified and Class 1, Division 1 and Division 2 Locations Fourth Edition [Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class 1, Zone 0, Zone | and Zone 2 Locations First Edition [Recommended Practice for Fire Prevention and Control on Open Type Offshore Production Platforms R(2000) [Recommended Practice for Installation, Maintenance and Repair of Surface [Safety Valves and Underwater Safety Valves Offshore Fourth Edition; 1S 10419; Errata - 1996 http://www ihsere.com/cgi-bin/dodiss2?201=80552063560000061326800200843042040... 11/21/2002 Page 4 of 4 Recommended Practice for Design and Hazards Analysis for Offshore APIRE 14) [01 May 2001 acry [Rem Facilities Second Ealtion 01 Jun 1997 | ACTV | Bulk Oil Testing, Handling, and Storage Guidelines First Edition (Withdrawn) Recommended Practice for Care and Use of Reinforced ous 97 | won an Cag a Oto RECOMMENDED PRACTICE FOR CARE AND USE OF REINFORCED ‘01 Mar 1976] HIST | THERMOSETTING RESIN LINE PIPE (RTRP) SECOND EDITION (WITHDRAWN), 01 Mar 1999] ACT | Recommended Practice for Care and Use of Fiberglass Tubulars Second Edition (01 Mar 1996 | ACTV | Closure of Underground Petroleum Storage Tanks ‘01 Mar 1996 | ACTY | Installation of Underground Petroleum Storage Systems Tan 193, Bulk Liquid Sock Control at Retail Oues R001) ‘Storing and Handling Ethanol and Gasoline-Ethanol Blends at Distribution Ol Jan 1985 ] HIST | Terminals and Service Stations Storage and Handling of Gasoline-MethanoVCosolvent Blends at Distribution ‘Terminals and Service Stations (R. 1993) R(2000) 01 Jan 1992 | HIST 01 Oct 1997 | WORN | (Withdrawn) Interior Lining of Underground Storage Tanks Fourth Edi ‘Superseded by STD 1631-2001 Cathodic Protection of Underground Petroleum Storage Tanks and Piping Ol Sep 1995 | ACTV. APLRP.1525 APIRP 1SL4, APLRP 1STL4 API RP 1604 APIRP 1615 API RP 1626 APLRP 1631 APLRP 1631 aul API RP 1632 Systems (Withdrawn) Handling Water Discharges from Automotive Service Facilities Located at Petroleum Marketing Operations Using the API Color-Symbol System to Mark Equipment and Vehicles for Product Identification at Service Stations and Distribution Terminals Second Edition; Supplement A R(2000) ‘Set of Six API Recommended Practices on Underground Petroleum Storage ‘Tank Management Index Entry Only ‘Set of Six API Recommended Practices on Underground Petroleum Storage ‘Tank Management Index Entry Only (Withdrawn) Recommended Practice for Design of Control Systems for Drilling Well Control Equipment APLRP 1633 APLRP 1637 01 Jan 1996 | ACTV [ari so [ovens [ncr [esate ces faan oun aaa Tew formed Ft Deas an poo of Sian Sa ‘APIRP17B _ [01 Mar 2002 | ACTY | Recommended Practice for Flexible Pipe Third Edition Jariarize | [Recommended Practice on TFL (Through Flowline) Systems Second Edition; O1 Sep 2002 | ACTY liso 13628-3 APIRP.17G API RP 1650 [Recommended Practice for Design and Operation of Completion’ Workover Riser O1 Jan 1995 | ACTY | systems First Edition APLRP171 [01 Aug 1996] ACTV [installation Guidelines for Subsea Umbilicals First Edition Recommended Practices for Evaluation of Well Perforators First APIRP 198 [01 Nov 2000] ACT Y eae 2001 ition; Errata http://www ihserc.com/egi-bin/dodiss2?201=80552063560000061326800200843042040... 11/21/2002 IHS Page 1 of 2 Bee cuenee ‘API RP 2001 ‘01 Jun 1998 ‘ACTV [Fire Protection in Refineries Seventh Edition API RP 2003 01 Sep 1998 | ACTV Protection Against Ignitions Arising out of Static, Lightning, and Stray [Currents Sixth Edition API RP 2005 API RP 2009 APLRP 2016 APLRP. 3 API RP 2027 1028 APLRP 2021 O1 Sep 1996 01 Feb 2002 | ACTV 1 Aug 2001 | ACTV fo1 May 2001] ACTV ‘01 Aug 2001 | ACTV (01 Mar 2002 | ACTV 01 Feb 2002 | ACV ACTV [Service Station Safety Sixth Faition; Supplement - 1996 [Safe Welding, Cutting, and Other Hot Work Practices in the Petroleum and Petochemical Industries [Guidelines and Procedures for Entering and Cleaning Petroleum Storage Tanks First Edition Management of Atmospheric Storage Tank Fires Fourth Edition [Guide for Safe Storage and Handling of Heated Petroleum-Derived Asphalt Products and Crude-Oil Residua Ignition Hazards and Safe Work Practices for Abrasive Blasting of [Atmospheric Storage Tanks in Hydrocarbon Service Third Edition Flame Arresters in Piping Systems ACTV | Repairing Crude Oil, Liquefied Petroleum Gas, and Product Pipelines R(1999) API RP 2220 APL RP.2221 ‘APIRP-2350 APLRP 2556 APIRP 27 APLRP2A APIRP.2200 | 01 Jan 1994 APIRP2201 | 01 Jan 1995 APIRP 2210 _| 01 Jun 2000 01 Jan 1991 01 Jan 1996 01 Jan 1996, 01 Jan 1993 01 Jan 1991 JO1 Aug 1952 ‘ACTV [Procedures for Welding or Hot Tapping on Equipment in Service ACTY [Flame Arresters for Vents of Tanks Storing Petroleum Products Third Edition ACTY [Improving Owner and Contractor Safety Performance ACTY [Implementing a Contractor Safety and Health Program ‘ACT | Overfill Protection for Storage Tanks in Petroleum Facilities Second Edition ACTY | Correcting Gauge Tables for Incrustation R(1998) RECOMMENDED PRACTICE FOR DETERMINING PERMEABILITY OF POROUS MEDIA THIRD EDITION (R 1956) (WITHDRAWN) RECOMMENDED PRACTICE FOR PLANNING, DESIGNING AND HIST | CONSTRUCTING FIXED OFFSHORE PLATFORMS NINETEENTH EDITION HIST API RP 2A-LRFD| 01 Jul 1993 ACTV | Offshore Platforms - Load and Resistance Factor Design First Edition; Errata - Recommended Practice for Planning, Designing and Constructing Fixed |October 1993; Supplement 1 - February 1997 APLRP2A-WSD | 01 Dec 2000} ACTY | Oershore Platforms - Working Suess Design Twenty-First Edition APIRP2D API RP 2FP1 API RP 2FPS 01 Mar2001 } ACTV | recommended Practice for Planning, Designing, and Construction Floating (01 Feb 1993 | WDRN | of Moorings for Floating Production Systems First Edition; Replaced by RP Recommended Practice for Planning, Designing and Constructing Fixed ‘Recommended Pract Fourth Edition (Withdrawn) Recommended Practice for Design, Analysis, and Maintenance for Operation and Maintenance of Offshore Cranes 2SK http://www ihserc.com/egi-bin/dodiss2?201=80552063560000061326800200843042040...__ 11/21/2002 Page 2 of 2 Production Systems First Edition RECOMMENDED PRACTICE FOR PRODUCTION FACILITIES ON API RP 2G. 01 Jan 1974 | HIST |OFFSHORE STRUCTURES FIRST EDITION; SUPPLEMENT | - 1975 [QWITHDRAWN) Sopa 01 Dee 1956 | Ac |!t-Serviee Inspection of Mooring Hardware for Floating Dring Units Second ARPA OL Jan 1982 | ist [RECOMMENDED PRACTICE FOR CARE AND USE OF MARINE DRILLING RISERS SECOND EDITION (WITHDRAWN) [Recommended Practice for Planning, Designing, and Constructing Helipors for Fixed Offshore Platforms Recommended Practice for Qualification Testing of Steel Anchor Designs for Floating Structures Recommended Practice for Planning, Designing, and Constructing Structures and Pipelines for Arctic Conditions R(2001) (Withdrawn) Recommended Practice forthe Analysis of Spread Mooring Systems for Floating Drilling Units RECOMMENDED PRACTICE FOR DESIGN AND OPERATION OF MARINE DRILLING RISER SYSTEMS SECOND EDITION (REPLACED BY RP 169-93) Recommended Practice for Design, Rating, and Testing of Marine Drilling Riser Couplings APLRP 2L 01 Jan 1996 | ACTV APL RP 2M. 01 Jan 1996 | ACTV APLRP2N 01 Jan 1995 APIRP2P. 01 Jan 1987 APLRP2Q 15 Apr 1984 APIRP2R 01 Jan 1984 Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms (TLPs) First Edition ‘Recommended Practice for Design and Analysis of Stationkeeping Systems for Floating Structures Second Edition; Replaces RP 2FP1 Recommended Practice for Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring First Edition Recommended Practice for Planning, Designing, and Constructing Tension Leg Platforms Second Edition Recommended Practice for Ultrasonic and Magnetic Examination of Offshore ‘Structural Fabrication and Guidelines for Qualification of Technicians [Recommended Practice for Preproduction Qualification for Steel Plates for Offshore Structures Third Edition; Errata, November 1998 APLRP2RD | 01 Jun 1998 ane fermi 01 Aug 1998] ACTV APL RP 2SK http://www ihsere.com/cgi-bin/dodiss2?201=80552063560000061326800200843042040...__ 11/21/2002 Page 1 of 1 TE BSc 1gey ‘Search Term: Organization:AP! 4-44 ma Se eo Tae ]RECOMMENDED PRACTICE FOR CARE AND USE OF CABLE DRILLING APIRP3 01 Jun 1988 | HIST | ap FISHING TOOLS SECOND EDITION (WITHDRAWN) RECOMMENDED PRACTICE FOR CARE AND USE OF CABLE DRILLING 61 Dec 1975 | HIST | AND FISHING TOOLS FIRST EDITION sr JRECOMMENDED PRACTICE AND STANDARD FORM FOR ELECTRICAL APIRP3I 01 Jan 1967 | HIST 1) oGs THIRD EDITION (R 1976) (WITHDRAWN) anineaia [ov aus 997] acy [Semi Foro Haro resent of Dowatale Wl Log Da int RECOMMENDED PRACTICE FOR STANDARD CALIBRATION AND or amie] sr FERIA FOR SCLEAR 108 RD EDMION WHOA) RECOMMENDED PRACTICE STANDARD HYDROCARBON MUD LOG APIRP34 [1 Nev 1958] HIST | FORM FIRST EDITION (WITHDRAWN) RECOMMENDED PRACTICE FOR OIL-MAPPING SYMBOLS FIRST apieeas [1 Apri9s7| usr [RECOMMENDED PRACT RECOMMENDED PRACTICE FOR DETERMINING PRODUCTIVITY ous 9 | sr [Rie er Eo rTDRAW RECOMMENDED PRACTICE PROOF-TEST PROCEDURE FOR apieest [01 Feb 1980] tis |EVALUATION OF HIGH PRESSURE CASING AND TUBING | CONNECTION DESIGNS SECOND EDITION (SUPERSEDED BY RP SCS) i RECOMMENDED PRACTICE FOR BIOLOGICAL. ANALYSIS OF APLRP 38 61 Dec 1975 HIST | SUBSURFACE INJECTION WATERS THIRD EDITION (R 1982) Recomended Presies on Measuring te Viscous Propenies of Cros Linked APLRP39— ]01 May 1998] ACTV | Waier-Based Fracturing Fluid Third Edition http://www. ihsere.com/egi in/dodiss2?7201=80552063560000061326800200843042040... 11/21/2002 Page 1 of 1 ES Do ‘Search Terms Document Number:RP 4° Organization: API 4212 oo = APiRP40 | 01 Feb 1998] ACTV APLRP40 | O1 Feb 1998 Recommended Practices for Core Analysis Second Edition Recommended Practices for Core Analysis Second Edition APiePao [Oran 1960 (Withdrawn) Core-Analysis Procedure, Recm, Practice for (Withdrawn) nes _[ovr [Recommended Practice for Presenting Performance Data on Cementing and Hydraulic Fracturing Equipment Second Edition R(2000) API RP 42 RECOMMENDED PRACTICES FOR LABORATORY TESTING OF SURFACE ACTIVE AGENTS FOR WELL STIMULATION SECOND EDITION (R 1990) APIRP 43 | 01 Jan 1991 (Withdrawn) Recommended Practices for Evaluation of Well Perforators Fifth Edition RECOMMENDED PRACTICE FOR SAMPLING PETROLEUM RESERVOIR APLRP 44 | 01 Fan 1966} HIST |F1 Uups FIRST EDITION (WITHDRAWN) 'APERPAS [01 Aug 1998] ACTV [Recommended Practice for Analysis of Oilfield Waters Third Edition RECOMMENDED PRACTICE FOR TESTING FOAM AGENTS FOR MIST APLRPA6 [OU Nov 1966) HIST | DRILLING FIRST EDITION (WITHDRAWN) APIRP48 — | O1 Feb 1972} HIST RECOMMENDED PRACTICE FOR DRILL STEM TEST REPORT FORM (R 1990) ‘APLRP49 — [01 May 2001| ACTV. [Recommended Practice for Drilling and Well Servicing Operations Involving. Hydrogen Sulfide Third Edition [Recommended Practice for Maintenance and Use of Drilling and Well Servicing Structures Second Edition http://www ihsere.com/cgi-bin/dodiss??201=80552063560000061326800200843042040... 11/21/2002 Page 1 of 3 CS oe ‘Search Terms Document Number:RP 5° ‘Organization:AP! 4-55 oe = Natural Gas Processing Plant Practices for Protection of the Environment APLRP.SO Second Edition R(2000) Recommended Practice for Classification of Locations for Electrical API RP 500, Installations at Petroleum Facilities Clasifed as Clas Division 1 and Division 2 Second Edition; Errata 8/17/98 RECOMMENDED PRACTICE FOR CLASSIFICATION OF LOCATIONS FOR ELECTRICAL INSTALLATIONS AT DRILLING RIGS AND. APIRPS00B | 01 Oct 1987] HIST | PRODUCTION FACILITIES ON LAND AND ON MARINE FIXED AND. MOBILE PLATFORMS THIRD EDITION; ERRATA - MAY 1988, |(SUPERSEDED BY RP 500) RECOMMENDED PRACTICE FOR CLASSIFICATION OF AREAS FOR. ELECTRICAL INSTALLATIONS AT DRILLING RIGS AND APIRP 500B —] 01 Jul 1973 | HIST | pRODUCTION FACILITIES ON LAND AND ON MARINE FIXED AND MOBILE PLATFORMS; SUPPLEMENT 2- 198 [Recommended Practice for Classification of Locations for Electrical APLRP 50S] 01 Nov 1997] ACTVJ Installations at Petroleum Facilites Classified as Class 1, Zone 0, Zone 1, and {Zone 2 First Edition; Errata 8/17/98 [Onshore Oil and Gas Production Practices for Protection of the Environment APLRPSI 01 Feb 2001 | ACT] ee pines 0111995 Jacry | and Deiling Pasties or Protein of he Environment ‘Second Edition R RECOMMENDED PRACTICE FOR THE DESIGN AND INSTALLATION 1 RP.520 PT2 | O1 Jan 1963 | HIST | OF PRESSURE - RELIEVING SYSTEMS IN REFINERIES SECOND EDITION (R 1973) Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries; Part I~ Sizing and Selection Seventh Edition APLRP.520PTI | 01 Jan 2000 | ACTV| Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries Part I1- Installation R(2000) Gra oor acy] Sule for hressure Relieving and Depesuring Stems Fourth Edion; Brat APL RP 520 PTI] 01 Jan 1994 | ACTV| February 15, 1999 ‘API RP.S3 (01 Mar 1997 | ACTV | Blowout Prevention APLRP 531M _ | 01 Jan 1980 [ACTV| Measurement of Noise from Fired Process Heaters R(1995) jipment Systems for Drilling Wells Third Edition Post-Combustion NOx Control for Fired Equipment in General Refinery Services First Fdition APIRPS36 | 01 Mar 1998] ACTV| [Recommended Practice for Occupational Safety for Oil and Gas Well Drilling APLRP 54 ae ee and Servicing Operations Third Edition ‘APLRP 540 | 01 Apr 1999 | ACTV| Electrical Installations in Petroleum Processing Plants Fourth Edition [Recommended Practices for Oil and Gas Producing and Gas Processing Plant (Operations Involving Hydragen Sulfide Second Edition R(2000) ‘01 Jan 1995 [ ACTV | Process Measurement Instrumentation R(2000) APLRP SS I5 Feb 1995 ]ACTV| APLRP.SSL Toros 198 [ACTY| anion sens Fiat aon http://www ihsere.com/cgi-bin/dodiss2?201=80552063560000061326800200843042040..._ 11/21/2002 APLRP S52 APLRP 553 01 Sep 1998 |ACTV APIRPSS4__| 01 Sep 1995 ] ACTV| Page 2 of 3 Refinery Control Valves First Edition Process instrumentation and Control First Edition APLRP.555 o1 Nov 2001 lol May 1997] acTV APLRP.556 Process Analyzers Second Edition instrumentation and Control Systems for Fired Heaters and Steam Generators First Edition ‘APERPSS7 [01 Dec 2000] ACTV| [Guide to Advanced Control Systems First Edition [Recommended Practices for Testing Sand Used in Hydraulic Fracturing APIRP.S6 [01 Dec 1995) HIST [Operations Second Esition RECOMMENDED PRACTICES FOR OFFSHORE WELL COMPLETION, APLRPS7 15 Jan 1986 | HIST SERVICING, WORKOVER, AND PLUG AND ABANDONMENT OPERATIONS FIRST EDITION (WITHDRAWN) Inspection of Pressure Vessels (Towers, Drums, Reactors, Heat Exchangers, APLRPS72 [01 Feb 2001 | ACT een eae alttas APLRPS73 | 01 Oct 1991 [ACTV| Inspection of Fired Boilers and Heaters Or Dee 00 aimee [ovina [acn| API RP 58 01 Dec 1995 |ACTV fot May 2002| ACTV| APL RP 576 APILRP 580. Inspection Practices for Piping System Components Second Edition Inspection of Atmospheric and Low-Pressure Storage Tanks Inspection of Pressure-Relieving Devices Second Edition [Meera Verification Program for New and Exiting Alloy Piping Systems Fist Fitness-for-Service First Edition; Errata March 2000 Recommended Practices for Testing Sand Used in Gravel Packing Operations Second Edition R(2000) Risk-Based Inspection First Edition API RP 582 Or Mar 200 APIRP 59 01 Jan 1987 | HIST PI 1 Feb 1998 [AcTV| — APLRP SA3 01 un 1386 [AcrY] APLRP SBI 'V | Welding Guidelines for the Chemical, Oil, and Gas Industries First Edition RECOMMENDED PRACTICES FOR WELL CONTROL OPERATIONS. FIRST EDITION (WITHDRAWN) User Acceptance of Refinery Valves Second Edition [Recommended Practice on Thread Compounds for Casing, Tubing, and Line Pipe First Edition; Supersedes Bull SA2 Id Inspection of New Casing, Tubing, and Plain End Drill Pipe Sixth Edition, ee 1, April 15, 1999 [CTV | Gauging and Inspection of Casing, Tubing, and Line Pipe Threads Fifth Edi APIRP.SCI APLRPSC5 | 01 Dec 1996] ACTV| [Recommended Practice for Care and Use of Casing and Tubing Eighteenth Edition [Recommended Practice for Evaluation Procedures for Casing and Tubing [Connection Second Edition Welding Connections to Pipe First Edition 01 Dec 1996 | ACTV APLRP.SC7 [Coited Tubing Operations in Oil and Gas Well Services First Edition APIRP st1__| Ov rz002 API RP SL2 01 Jul 2002 J ACTY) http://www. ihsere.com/cgi-bin/dodiss2?201=80552063560000061326800200843042040... [Recommended Practice for Railroad Transportation of Line Pipe Sixth Edition Recommended Practice for Internal Coating of Line Pipe for Non-Corrosive |Gas Transmission Service Fourth Edition 11/21/2002 APLRP SL3 Page 3 of 3 01 Jan 1996 | ACTV| Recommended Practice for Conducting Drop-Weight Tear Tests on Line Pipe APIRP SLS APLRP SL6 (01 Mar 1975 01 Mar 1979 HIST RECOMMENDED PRACTICE FOR MARINE TRANSPORTATION OF LINE PIPE FIRST EDITION; SUPPLEMENT 1 - 1977 RECOMMENDED PRACTICE FOR TRANSPORTATION OF LINE PIPE |ON INLAND WATERWAYS FIRST EDITION (WITHDRAWN) APLRPSL7 APIRP SLB 01 Jan 1988 01 Dee 1996 AcTY| CTV] Recommended Practices for Unprimed Internal Fusion Bonded Epoxy Coating lof Line Pipe [Recommended Practice for Field Inspection of New Line Pipe Second Edition APIRPSL9 [01 Dec 2001 | ACTV | External Fusion Bounded Epoxy Coating of Line Pipe First Edition [Recommended Practice for Transportation of Line Pipe on Barges and Marine APLRPSLW | 01 Dec 1996] act] Yecormended traces APIRPSUE [01 Mar 2002] ACTV [Recommended Practice for Evaluation of Pipe Imperfections First Edition http://www.ihsere.com/cgi-t in/dodiss2?201=80552063560000061326800200843042040... 11/21/2002 Page | of 2 (Withdrawn) Recommended Practices for Testing, High-Strength Proppants Used 01 Dec 1995 | WDRN |p iydraulic Fracturing Operations Second Edition R(2000) RECOMMENDED PRACTICES FOR EVALUATING SHORT TERM PROPPANT PACK CONDUCTIVITY FIRST EDITION (WITHDRAWN) RECOMMENDED PRACTICES! GUIDELINES FOR EVALUATION OF MOBILE OFFSHORE DRILLING UNIT (MODU) EMERGENCY POWER SYSTEMS AND FIRE PROTECTION SYSTEMS FIRST EDITION (WITHDRAWN) APLRP 621 __ [01 Mar 2001 | ACTV | Reconditioning of Metallic Gate, Globe, and Check Valves First Edition APLRP 60 APIRP 6! — | 01 Oct 1989 HIST APIRP62 — | 01 Oct 1988 | HIST [Recommended Practices for Evaluation of Polymers Used in Enhanced Oil Recovery Operations First Edition R(2000) Recommended Practices for Diverter Systems Equipment and Operations Second Edition APLRP63 | 01 Jun 1990 | ACTV APLRP.64 — 01 Nov 2001] ACTV 01 Sep 2002 | ACTV |Cementing Shallow Water Flow Zones in Deep Water Wells First Edition APIRP 651 _ | 01 Nov 1997| ACTV | Cathodic Protection of Aboveground Petroleum Storage Tanks Second Edition 'APLRP652 [01 Dec 1997 ACTV [Lining of Aboveground Petroleum Storage Tank Bottoms Second Edition [QWithdrawn) Recommended Practices for Exploration and Production Data Interchange Second Edition APLRP.66 — | 01 Jun 1996 | WDRN API RP 67 Recommended Practices for Oilfield Explosives Safety First Edition R(2000) [Recommended Practice for Oil and Gas Well Servicing and Workover [Operations Involving Hydrogen Sulfide First Edition [Quality Improvement Manual for Mechanical Equipment in Petroleum, [Chemical, and Gas Industries Recommended Practices for Machinery Installation and Installation Design First Edition APIRP6S | 01 Jan 1998 | ACTV API RP 683 APLRP.686 | 01 Apr 1996] ACTV Rotor Repair First Edition TAPIRP a7 [01 Sep 2001 Recommended Practice for Repair and Remanufacture of Wellhead and [Christmas Tree Equipment First Edition RECOMMENDED PRACTICE ON THROUGH FLOWLINE (TFL) PUMP DOWN SYSTEMS THIRD EDITION (WITHDRAWN) Recommended Practice for Occupational Ssfety for Onshore Oil and Gas Production Operations First Edition [Recommended Practices for Development of a Safety and Environmental 01 Jul 1998 | ACTV | Management Program for Outer Continental Shelf (OCS) Operations and Facilities Second Edition APLRP6AR | 15 Apr 1994] ACTV APIRP6G | 01 Jan 1982 | HIST APLRP74 | 01 Oct2001 | ACTV APL RP75 01 Jan 1990 | ACTV | Management of Process Hazards First Edition; Er ‘API RP 750. tum - 1990 R195) http://www ihsere.convcgi-bin/dodiss2?201=80522013560000047364800200843047040..._ 11/21/2002 Page 2 of 2 APLRP7Si__ | 01 Feb 1999 | ACTV | Safe Operation of Hydroffuoric Acid Alkylation Units Second Fdition [Management of Hazards Associated with Location of Process Plant Buildings CMA Manager's Guide; First Edition; Errata - 1995 [Recommended Practice for Testing of Thread Compound for Rotary Shouldered [Connections R(1999) Recommended Practice for Installation, Maintenance, and Operation of Internal- Combustion Engines R(2000) ‘AcTy | Recommended Practice for Drill Stem Design and Operating Limits Sixteenth Edition; Errata May 2000 RECOMMENDED PRACTICE FOR DRILLING MACHINERY; SECOND EDITION SUPPLEMENT | - 1981 Procedures for Inspection, Maintenance, Repair, and Remanufacture of Drilling Equipment Guidelines for the Defi APIRP 752 |01 May 1995] ACTV APLRP7AL | 01 Jan 1992 | ACTV APLRP7C-11F | 01 Jan 1994 APIRP 7G 01 Aug 1998 APLRP7H — | O1 Jan 1981 | HIST 01 Dec 1995 APLRPIL. API RP 80 ion of Onshore Gas Gathering Lines First Edition Recommended Practice for Procedures for Inspections, Maintenance, Repair, and APIRESB [Ol Mar2002 Remanufacture of Hoisting Equipment Seventh Edition ACTY Management Practices, Self-Assessment Process, and Resource Materials Second] Edition APLRP 9000 | 01 Oct 1998 | ACTV 01 Mar 1990 | WORN (Withdrawn) Prevention of Brittle Fracture of Pressure Vessels [Materials and Fabrication Requirements for 2-1/4Cr-IMo and 3Cr-IMo Steel Heavy Wall Pressure Vessels for High Temperature, High Pressure Hyrdogen Service First Edition APIRP934 | OI Dec 2000 Refractory Installation Quality Control Guidelines-Inspection and Testing Monolithic Refractory Linings and Materials First Edition ‘Steels for Hydrogen Service at Elevated Temperatures and Pressures in ACTV | Petroleum Refineries and Petrochemical Plants Fifth Edition; Errata October = 1997; Supplement 1-1998 ACTY | Avoiding Environmental Cracking in Amine Units Second Edition APIRP936 | 01 Oct 1996 | ACTV APLRP941 — | OI Jan 1997 APLRP 945 | O1 Oct 1997 Recommended Practice on Application, Care, and Use of Wire Rope for Oil Field Service Tenth Edition APERP9B — | 01 Jun 1999 http://www ihsere.com/cgi-bin/dodiss2?201=80522013560000047364800200843047040.... 11/21/2002

You might also like