Professional Documents
Culture Documents
Kas Tim Bahlul
Kas Tim Bahlul
PEMASUKAN PENGELUA
NO TANGGAL JUMLAH NO
1 Viar ### IDR 950,000 1
2
3
4
5
JUAL TK SABAM
SP 36 35 IDR 100,000
ZA 11 IDR 250,000
SP 36 10 IDR 100,000
BASF 5 IDR 550,000
JUAL ANTON
SP 36 10 IDR 100,000
ZA 10 IDR 310,000
SP 36 10 IDR 100,000
BASF 10 IDR 640,000
AS TIM BAHLUL
PENGELUARAN KAS
NO
Real Bayar Viar IDR 600,000
Bearbrand 5 (Puding Tim Pomp IDR 55,000
Uang Hilang (Andreas) IDR 250,000
Bayar Proposal IDR 200,000 960
Sepeda Motor IDR 100,000 4080
2160
Real Bayar Viar IDR 350,000 2080
Sepeda Motor IDR 90,000
IDR
Real Bayar Viar IDR 350,000
Sepeda Motor IDR 70,000
IDR 3,500,000
IDR 2,750,000
IDR 1,000,000
IDR 2,750,000
IDR 10,000,000
IDR 1,000,000
IDR 3,100,000
IDR 1,000,000
IDR 6,400,000
IDR 11,500,000