7
BHARAT SANCHAR NIGANELIMELED:
OFFICE OF DIVISIONAL ENGINEER (Mobile Sersices), DUARWAD HT
MOBILE SECTION PINTO ROAD, HUE S80 0.20
that Hubli 06-12-2084
HECOM DISTRICT,
No: DGM(MS) HIBLAG USO Saturation/2022.2.464
As pet the iustuetions of competent authority (H file m0 16959 MIG!) Nevutiation
Connnittee had detailed discussion to review the Denne note piven by HESCOM tor proviaon ot
Power connection at Hirehanji Tal-Byadagi Site, The committee comprises of Halla inye members
UShei SC.Kutharni: AGM OMS) Hubs
2) SHS.G.Karmarkar) SDE(Hlectrica bali
3) Shri HLS. Parvater, SDE Ranebennur
The committee met on line on 06 12-2023.
Present Status:
1. The 4G New site is proposed at Hirehanji TilBy adayitn
instruction received time to time application was made by BSNL. Hubali
ment, The Requirement is of single phase 3K WL.
oF thy site an as per
fir provision ot
Electric Conneetion to HESCOM Dep
connection,
2. Inreply'to our applivation The HESCOM submitted demand note of Rs, 3. 91,000 Under
DCW method,
3. The amount quotated is above Rs.2 Lakhs per and diteetions received negotiation is
required to be earried out with Electeivity department
ating the quotated amount may be
One letter was given on 05.12.2023 0 EE Ranebennur st
inebennur on
reviewed. The Committee had detailed discussion with HESOM officer at
05.12.2023.
The Committee analysed on the following points
Hof only single phase 11 connection and
aund other items,
1. The Committee explained about our requiren
requested to recalculate the estimate without adding. transform
2. The EE HESCOM and AEE HESCOM both available during meeting at HESCOM olliee
3. The ALE at Ranebennur had gone through the latest submitted demand note, He explained the
various provisions of demand notes and seope af work
4. They told that there is: no further provision in the esisting transtormer and all are work
under overload.
5. The Commitee requested with technical justification and tied to convince how things ean be
minimised in current estimate,
6. Afier elaborate discussion F submitted by his section office
Ue assured that the possibility of any reduetion of material will be seen! onee again, Hunthor
the officers HHESCOM told thal the entire ease is 0 he reviewed fiom beginniny and itamne
take another minimum 15 days period. f
iareed 10 review the estimate
Recommendation:
The committee jointly recommends that we may wait for any revision of demand
Note from HESCOM and after getting clearance from them lowest demand note if available
may be further processed please.
BH, Geen oes e
‘Shri ¥LS.Parvater Shri S.G. Karmarkar Shri S.C. KAIkj
aie 6 q Ree (ar) SDE (Electrical), Tubal AGM (MS¥Tlubali
S.D.E. NWOP (Groups)
‘Wohyy/ RANEBENNUR-581115,
ovaimecu wit Garis
C