You are on page 1of 1
7 BHARAT SANCHAR NIGANELIMELED: OFFICE OF DIVISIONAL ENGINEER (Mobile Sersices), DUARWAD HT MOBILE SECTION PINTO ROAD, HUE S80 0.20 that Hubli 06-12-2084 HECOM DISTRICT, No: DGM(MS) HIBLAG USO Saturation/2022.2.464 As pet the iustuetions of competent authority (H file m0 16959 MIG!) Nevutiation Connnittee had detailed discussion to review the Denne note piven by HESCOM tor proviaon ot Power connection at Hirehanji Tal-Byadagi Site, The committee comprises of Halla inye members UShei SC.Kutharni: AGM OMS) Hubs 2) SHS.G.Karmarkar) SDE(Hlectrica bali 3) Shri HLS. Parvater, SDE Ranebennur The committee met on line on 06 12-2023. Present Status: 1. The 4G New site is proposed at Hirehanji TilBy adayitn instruction received time to time application was made by BSNL. Hubali ment, The Requirement is of single phase 3K WL. oF thy site an as per fir provision ot Electric Conneetion to HESCOM Dep connection, 2. Inreply'to our applivation The HESCOM submitted demand note of Rs, 3. 91,000 Under DCW method, 3. The amount quotated is above Rs.2 Lakhs per and diteetions received negotiation is required to be earried out with Electeivity department ating the quotated amount may be One letter was given on 05.12.2023 0 EE Ranebennur st inebennur on reviewed. The Committee had detailed discussion with HESOM officer at 05.12.2023. The Committee analysed on the following points Hof only single phase 11 connection and aund other items, 1. The Committee explained about our requiren requested to recalculate the estimate without adding. transform 2. The EE HESCOM and AEE HESCOM both available during meeting at HESCOM olliee 3. The ALE at Ranebennur had gone through the latest submitted demand note, He explained the various provisions of demand notes and seope af work 4. They told that there is: no further provision in the esisting transtormer and all are work under overload. 5. The Commitee requested with technical justification and tied to convince how things ean be minimised in current estimate, 6. Afier elaborate discussion F submitted by his section office Ue assured that the possibility of any reduetion of material will be seen! onee again, Hunthor the officers HHESCOM told thal the entire ease is 0 he reviewed fiom beginniny and itamne take another minimum 15 days period. f iareed 10 review the estimate Recommendation: The committee jointly recommends that we may wait for any revision of demand Note from HESCOM and after getting clearance from them lowest demand note if available may be further processed please. BH, Geen oes e ‘Shri ¥LS.Parvater Shri S.G. Karmarkar Shri S.C. KAIkj aie 6 q Ree (ar) SDE (Electrical), Tubal AGM (MS¥Tlubali S.D.E. NWOP (Groups) ‘Wohyy/ RANEBENNUR-581115, ovaimecu wit Garis C

You might also like