Risk Assessment

Doc No: 01A SUBJECT : Installation ductable units with PI ducts for MC1 04/07/2023
accommodation
Rev 00
PROJECT : MC1 Accommodation
Task (Steps) Potential Hazard Who might be Existing Control Responsible Current Risk Additional Control Responsible Final Risk
affected person Con Prob Risk person Cons Prob `

 Follow Manual Handling  Ensure follow the


Procedure. correct cutting
 Follow Hot work Permit procedure
Procedure.
 Disc breaking Workers  Carry out periodical Supervisors/ 5 3 15  Follow Supervisor/ 3 2 6
 flying off sparks supervisor inspection for machine, disc, Employees supervisors instructions Engineer/
 Shock extension cables and  Follow the main client Workers
 Electrocution connections. safety advisors
Use of grinder for  Lackof supervision  Don’t use the machine /engineer instruction
cutting duct  Lack of awareness without safe guard.
supports for  Wear face shield and
DUCTABLE SPLIT safety glasses, leather gloves,
UNITS safety shoes, clothing and
safety helmet.
 Main contractor
 Grinding wheels stored on
permit to work system
hangers.
shall be obtained
 Do not place machine down
And followed.
before the rotation stops.

Demonstrate
competency in
performing the task
safely.

 Back Injuries  Maximum 20 kg will load  Main contractor


 Sprains manually during work permit to work
 Strains  Safe Manual handling system shall be
 Hernias methods shall be adopted obtained and
 Slips and Trips by keeping the back straight and followed.
 Work related upper limbs knees bended to prevent back
Manual handling of disorder injuries. Supervisor/
Operatives, Supervisor/
HVAC Ducts and  Cuts injuries  Lifting of heavy load 5 3 15 Engineer/ 4 2 8
property Engineer/ Workers
accessories should be avoided and shall Workers
be lifted by mechanical
means or by
Team lift.
Risk Assessment
Doc No: 01A SUBJECT : Installation ductable units with PI ducts for MC1 04/07/2023
accommodation
Rev 00
PROJECT : MC1 Accommodation
Task (Steps) Potential Hazard Who might be Existing Control Responsible Current Risk Additional Control Responsible Final Risk
affected person Con Prob Risk person Cons Prob `

 Lack of PPEs  Area shall be kept clean and


tidy to prevent slips and falls.
 Adequate personnel
protective equipment’s to be
worn by the operatives to
prevent cuts injuries caused by
sharp edges.
 Job rotation or
sufficient breaks shall be
given to the workers.
 Tool box talks to be
conducted by the
concerned supervisor prior the
task.
 Provision of cool
drinking water in the area to
be ensured.

Fall from Height. Erecting  All scaffolding material to  Ladder must be


scaffolding collapse be of sound materials. installed on firm & level
Falling materials Training and tool box talk to footing.
Un inspected ladders be conducted regarding  Leveling device to be
working at heights. used if required.
 Only trained scaffolders to  Always face the ladder
be used on the job. Use and hold on with both
Supervisor/
Working at height Worker/ co- appropriate PPE, Supervisors/ hands when climbing up
Engineer/
using Scaffolding & workers including Employees/scaffol 5 4 20 or down. Ladder work is 3 2 6
Workers/HS
Ladder Supervisor inspected full ding inspector a two men’s job, one to
E officer
body holdandsupport the
Harness to be used. ladder as theother climbs
Harness should be hooked in up.
a safe anchor
Point.
Risk Assessment
Doc No: 01A SUBJECT : Installation ductable units with PI ducts for MC1 04/07/2023
accommodation
Rev 00
PROJECT : MC1 Accommodation
Task (Steps) Potential Hazard Who might be Existing Control Responsible Current Risk Additional Control Responsible Final Risk
affected person Con Prob Risk person Cons Prob `

 Scaffolding inspection to
beconducted.  Monthly inspection of
 Scaffolding tag system ladders to be conducted.
to be followed.
 Scaffolding should be
inspected by certified person.
 Tool box talk Training to
workers prior to start work
about ladder use.
 Ladder must be
installed on firm & level footing.
 Leveling device to be used
if required.
 Straight ladder to be tied
on top,
 Do not use the top two steps.
 During working on
ladder one person should
hold the ladder
 Always face the ladder and
hold on with both hands
When climbing up or down.
Monthly inspection of ladders to
be conducted,