Ceiling Level
2,100
4 deg Pitch behind
Sand Bark
head
Window head Level Iron Stone
MAX EXT WALL HEIGHT
1,209
8 deg P
Level 1 itch be
600
hind cill Wilderness
5,769
2,100
921
2,400
2,400
Pale Eucalypt
cill
NGL Garage Level Wilderness
300
proposed G L
e x is t in g N G L
Column
Stacked Stone. External Colours
Natural stone color
1 EAST ELEVATION - FRONT VIEW
SCALE 1 : 100
All external colour selections for homes at Twin Creeks must be submitted with building design plans for Twin Creeks
endorsement.
A maximum of 10% of any facade area of your home may be a contrasting colours selected from colours in the natural
landscape. These contrasting colours may only be used for highlights, feature panels and trims.
Grid The roof colour should compliment the colour of the home.
Twin Creeks Properties Pty Ltd
D008I-TC_SmallLot-Guidelines_colours 2 /4
NGL e x is t in g N G L
Ecru P15 D1
1 0 m M a x H e i g h t - N /A R o o f B e y o n d
Hog Bristle Qtr P124D1Q
Submerge P30B5
520
2,100
Loganberry P01F7
900
450
Olive Reserve P18F7
600
450
1,500
2,100
Watchet PP30B2
2,100
1,500
e x is t in g N G L
1:100 @ ORIGINAL SIZE 1:200 @ A3 Print Out
0 1 3 6 10m
0 1 3 6 10m
0322
with the terms of engagement for that
commission.
Opus Arch Pty Ltd
10 Hilder Road P4 05-07-2022 REVISED CONCEPT P12 10-08-2023 Color Scheme SCALE:
As Shown
DRAWN: CHECKED:
Unauthorised use of this drawing is prohibited. Ermington NSW 2111 P3 01-06-2022 REVISED CONCEPT
Reference to DRP Feedback - additional kitchens deleted - plan amended
DV DV
P11 06-07-2023 Reference to DRP Feedback - additional kitchens deleted
Phone 02 8987 4620 STATUS: Plot Date: SHEET: REV:
info@opusarch.com.au P2 07-02-2022 REVISED CONCEPT P10 08-02-2023 DRP Pre-Submission to TwinCreeks
Verify all dimensions on site
scale all drawings with caution
not be used for construction purposes until issued
by the Architect for construction.
Nominated Architect
Don Venkteshwar Registered Architect
Reg No. 8142
P1
REV
2-12-2021
DATE
REVISED CONCEPT
NOTATION/AMENDMENT
P9
REV
14-12-2022
DATE
FOR CORDINATION
NOTATION/AMENDMENT
FINAL SCHEME 10/08/2023 DA14 P12
GSPublisherVersion 2135.0.2.100