You are on page 1of 7
8 MARUTI ENTERPRISE @& G1, GIDC ESTATE, PHASE.1, BLUE STAR ROAD, NARMADA NAGAR -392015, BHARUCH. [7 “or insPECTION, CERTIFICATION AND CALIBRATION OF EQUIPHENT AS PER FACTORIES ACT] MOB.: 9825684100 - Office no.: 9409205373 & 8141617127 E-mail: maruticpb@yahoo.in Test Certificate No.: HES- 125/21 Date: 28/06/2024 FORM NO: 10 (Prescribed under rule 60) Prescribed for report of the lifting machines, ropes an lifting tackles PARTICULARS Registration No: License No: NIC Code No: NA (As given In the license) 1. Name of Occupier of Factory : MIS, HOPE ENGINEERING SOLUTIONS. 2. Address of the Factory +: M-403, SILENT PARK CHS. LTD. MIRA BHAYANDER ROAD : NEAR GOLDEN NEST, BHAYANDER-EAST, THANE-401105, 3, Distinguishing Marks and des To identify the lifting machine, lifting tackle etc. : SWL: 05 Ton, SR.Nt + Length: 03 Mtrs, Color: tion sufficient : Polyester Webbing Sling, Make: 'N.A’, 004315, 4, Date when lifting machine was first used in the : 2021 Factory Wh i 5. Date of each examination made under section : Through Visual itspection, Ph 29(1)(a)(i) and by whom it was carried out : By Mr. Manoj Panchal on 28/06/2021 6.Date and number of the certificate relating to: By Marlufacturer | ‘Any test and examination made under sub-rule i Of rule 60 together with the name of the Person who issued the certificate vl! 7. Date of annealing or other heat treatment of The chain and iting tackle carried out under) Sub-rule (5) of rule 60 and by whom carried oul! ist Applicable Due To Material Of Construction Found in order. Functional Load Test Carried out. | 1d Defects Noticed, Safe To Use At The SWL Capacity. isual Inspection For Damage Should Be Carried Out y User Before Use The Same. 8, Particulars of any defect found at any such), Examination or after annealing and affecting |), The safe working load and the step taken to ||| Remedy such defect. 7 "| | gertfy that on,'28/06/2024, | thoroughly examined lifting machinelropeliting tackle and that tne above salon fiero (a MANOJ. R. PANCHAL | COMPETENT PERSON & CHARTERED ENGINEER.AM1E0669.9 B. TECH (M), ASNT LEVEL II (UT) il ob Competency Certifeate No}: cuuoisHicPTIAN9seaT22010 AndDate || 710812020 To 08/08/2021 Issuedby | NEXT INSPECTION & EXAMINATION RECOMMENDED ON 27/06/2022 4 sa, S282 MARUTI ENTERPRISE “&®) G1, GIDC ESTATE, PHASE-1, DLUE STAR ROAD, NARMADA NAGAR -392015, BHARUCH, TPE INSPECTION, CERTIFICATION AND CALIBRATION OF EQUIPMENT AS PER FACTORIES ACT, MOB.: 9825684100 _ Office no.: 9409205373 & 6141617327 _ E-mall: marutlepb@yahoo.in ‘Tost Certificato No.: HES- 126/24 Dato: 26/00/2021 FORM NO: 10 (Proscribod undor rulo 60) Proscribod for roport of tho lifting machines, ropos an lifting tacklos *ARTICULARS Rogistration No: NIC Code No: NA 4, Namo of Occuplor of Factory Licanse No: (As ivan in tho tieanss): US, HOPE ENGINEERING SOLUTIONS 2, Addross of tho Factory :M.403, SILENT PARK CHS. LTD. MIRA BHAYANDER ROAD ENEAR'GOLDEN NEST, BHAYANDER-EAST, THANE-401105, 3. Distinguishing Marks and description sufficient : Polyostor Wobbing Sllng, Maka: NA’, To Identify tho Ifting machino, lifting tacklo otc. : SWL: 05 Ton, SR.NO: 004416, + Longth: 09 Mira, Color: ‘RED’ \ 4. Dato when lifting machino was first used In tho : 2024 (ll Factory | hrough Visual faspoctiol, Physleal Obsorvation, Functlonal Load Tost Carried Out A Por Standard : By Mr, Manoj Panchal ont 28/06/2021 6. Date and number ofthe certificate relating to: By Mal\ufacturor H all Any test and examination made undor sub-rule My || if Ofrulo 60 togethor with the namo of the. \y Wa! Person who issued the certificate afl , 5. Dato of oach oxamination made undor section 29(1)(ay(l) and by whom Itwas carrlod out \ 7. Date of annealing or other heat treatment of The chain and lifting tacklo carried out under) Sub-rute (5) of rule 60 and by whom carried ot {ot Applicable Due To Material Of Construction ourid In order, Functional Load Tost Carried out. i : WM 8. Particulars of any defect found at any such) :'No Defacts Noticed, Safo To Uso At Tho SWL Capacity. Examination or attor annealing and afocting||): Vishal inapoctlon For Damage Should Be Caras Gav The safe working load and the step taken to ||| By User Bofore Use Tho Samo. Remedy such defect. i | certify that on,|28/06/2024, 1 thoroughly oxamined liting machine/ropelliting tackle and that, the above is a correct report of the result. Ph Poe MANOJ. R. PANCHAL COMPETENT PERSON & CHARTERED ENGINEER-AM180669.9, B. TECH (M), ASNT LEVEL I (UT) ‘7ioer2020 To osniz021 Diroctor, Industrial Safoty & Hoaitt + Gularat Stato, Ahmadabad NEXT INSPECTION & EXAMINATION RECOMMENDED ON 27/06/2022 Issuedby | rh. 1S 82 MARUTIENTERPRISE & St, GIDC ESTATE, PHASE.1, BLUE STAR ROAD, NARMADA NAGAR -392015, BHARUCH. , S21: SIPC ESTATE, PHASE.1, BLUE STAR ROAD, NARMADA NAGAR -392015, BHARUCH. PI INSPECTION, CERTIFICATION AND CALIBRATION OF EQUIPMENT AS PER FACTORIES ACT. 825684100 Office no.: 9409205373 & 8141617127 E-mail: maruticpb@yahooin_ ‘Test Certificate No,: HES- 127/21 Date: 28/06/2021 FORM NO: 10 (Prescribed under rule 60) Prescribed for report ofthe lifting machines, ropes an lifting tackles y t MO} PARTICULARS Registration No: License No: NIG Code Ho: RA (As given inthe teense}: 4, Name of Occupler of Factory MIS, HOPE ENGINEERING SOLUTIONS. hy 2. Address of the Factory 1-403, SILENT PARK CHS. LTD. MIRA BHAYANDER ROAD 3, Distinguishing Marks and description sufficient ; Polyester Webbing Sling, Make! To identify the lifting machine, lifting tackle et 4. Date when liting machine was first used in the : 2024 1 Factory 5. Date of each examination made under section ‘hrough Visual inspection, Physical Observation, 29(1)(ail) and by whom it was carried out Functional Load est Carried Out As Per Standard : By Mr. Manoj Panchal on 28/06/2021 i i 6. Date and number of the certificate relating to ‘Any test and examination made under sub-rule Of rule 60 together with the name of the Person who issued the certificate (ih ii Date of annealing or other heat treatment of The chain and ling tackle carried out unde Suberule (5 of rule 60 and by whom cari 6 hi No Defects Noticed. Safe To Use At The SWL Capacity. isial Inspection For Damage Should Be Carried Out y User Before Use The Same, (ety 8. Particulars of any defect found at any such! Examination or after annealing and affectir The safe working load and the step taken to Remedy such defect i L erty that on|'28/06/2024, 1 thoroughly examined liting machinelropeiing tackle and that a eee MANOJ. R. PANCHAL the above Competency Certificate No sand Dato or.020 To elotrazt COMPETENT PERSON & Isoued by tr Indus Seely & CHARTERED ENGINEER-AN100669-9 {Guarat Stato, Ahmadabad __B.TECH (M), ASNT LEVELII (UT) NEXT INSPECTION & EXAMINATION RECOMMENDED ON 27/06/2022 v4. 0 aS MARUTI ENTERPRISE &®) GAR -392015, BHARUCH. ‘Test Certificate No.: HES- 128/24 Dato: 28/06/2021, FORM NO: 10 (Proseribod undor rulo 60) Proscribed for roport of tho lifting machinos, ropos an lifting tacklos PARTICULARS Rogistration No: conse Not [NIC Code No: NA {As olvon in tho eons}: 4. Name of Occupier of Factory MIS, HOPE ENGINEERING SOLUTIONS alli, 2. Address of the Factory +: M403, SILENT PARK CHS, LTD. MIRA BHAYANDER ROAD | NEAR GOLDEN NEST, BHAYANDER FAST, THANESD1105 3. Distinguishing Marks and description ouffcient: Polyestor Wobbing Sting, Make! To identify the lifting machino, lifting tackle otc, : SWL: 03 Ton, SR.NO: 593257, + Length: 06 Mire, Color: i inh 4, Date when lifting machine was first used in the : 2024 Factory 5. Date of each examination made under section 29(1)(ayii) and by whom it was carried out rough Visual inspection Physical Obsorvation, Functional Load Test Carried Out As Por Standard By Mr. Manoj Panchal on 28/06/2021 6. Date and number of the certificate relating to: By Mafiufacturer ‘Any test and examination made under sub-rule iT Of rule 60 together with the name of the, Porson who issued the certificate it! 7. Date of annealing or other heat treatment of; Not peels Due To Material OF Construction The chain and lifting tackle carried out under: Found ln order, Functional Load Test Carried out. Sub-ule (6) of rule 60 and by whom carried out Hh, No Defects Noticed. Safe To Use At The SWL Capacity. isial Inspection For Damage Should Be Carried Out iy User Before Use The Same. 8. Particulars of any defect found/at any sud Examination orateranneting and acting) The cafe working load and tne stop taken Remody such dafect, i \.cortity that on, 28/06/2024, | thoroughly examined lifting machinelropeliting tackle and that PL. a1 (2 MANOJ. R. PANCHAL COMPETENT PERSON & rector, Industral Safety & Health CHARTERED ENGINEER-AM180669.9, |) ppl! Fouarat state, anmadabad i B.TECH (M), ASNT LEVEL Il (UT) And Date Issued by RY 8 MARUTIENTERPRISE & G4, GIDC ESTATE, PHASE-I, BLUE STAR ROAD, NARMADA NAGAR -392015, BHARUCH. ‘TPE INSPECTION, CERTIFICATION AND CALIBRATION OF EQUIPMENT AS PER FACTORIES AC MOB.: 9825684100 _ Office no.: 9409205373 & 8141617127 E-mail: maruticpb@yahoo. Test Certificate No.: HES- 129/24 Date: 28/06/2021 FORM NO: 10 (Prescribed under rule 60) Prescribed for report of the lifting machines, ropes an lifting tackles PARTICULARS Roglstration No: License No: NIC Code No: NAA (As oven inte ticns ‘1. Name of Occupier of Factory : MIS, HOPE ENGINEERING SOLUTIONS ‘| It, MN, 7-403, SILENT PARK CHS. LTD. MIRA, anaVanteg ROAD IEAR GOLDEN NEST, BHAYANDER EAST, THANE-404105 2, Address of the Factory 3. Distinguishing Marks and description sufficir To Identify the lifting machine, lifting tackle et eer Wettrg sina te SWL: 05 Ton, SR.NO: 006493, | ssivoieeenornee | 4, Date when lifting machine was first used in the : 2021 Factory 5. Dato of each exar 29(4)(a)il) and by whom itwas carried out ion made under section: Through Vistalliaspectiohy Phy Functional Load Test Carried Out As Per Standard : By Mr. Manoj Panchal ‘on'28/06/2021 Date and number of the certificate relating to ‘Any test and examination made under sub-rule Of rule 60 together with the name of the, Person who issued the certificate i 7.Date of annealing or other heat treatment of, Nét Applicable Due To Material Of Construction ‘The chain and iting tackle earied out unde! Found ord, Functional Load Test Carried out. Sub-rle (6) ofule 80 and by whom eared out) |) lh, qe 8. Particulars of any defect found'at any such |) Safe To Use At The SWL Capacity. Examination or after annealing and affecting||) : Visual Inspection For Damage Should Be Carried Out The safe working load and the step taken to ||; By User Before Use The Same. Remedy such defect. 1 i i Defects Notice \,gertfy that on, '28/06/2021, | thoroughly examined lifting machinelropelifting tackle and that, MRD MANOJ. R. PANCHAL Competency Cerificate No: GUSDISHICPT/A/02968472/2010 ‘And Dato {07/08/2020 To o6/oer202t COMPETENT PERSON & Issued by Y Director, Industral Safety & Health (CHARTERED ENGINEER-AM180669.9 ji): Gujarat State, Ahmadabad NEXT INSPECTION & EXAMINATION RECOMMENDED ON 27/06/2022 B. TECH (M), ASNT LEVEL Il (UT) 4. 2S MARUTI ENTERPRISE “& G1, GIDC ESTATE, PHASE.!, BLUE STAR ROAD, NARMADA NAGAR -392015, BHARUCH, TPL INSPECTION, CERTIFICATION AND CALIORATION OF EQUIPMENT AS PER FACTORIES ACT. | MON.: 9825684100 Office no.: 9409205373 & 8141617127 E-mail: maruticpb@yahoo.in Test Certificate No.: HES- 130/21 Date: 26/06/2021 FORM NO: 10 (Prescribed under rule 60) Prescribed for report of tho lifting machines, ropes an lifting tackles PARTICULARS, Registration No conse No: NIC Code No: KA, (As glvon in the tlean 4. Name of Occupier of Factory : MIS, HOPE ENGINEERING SOLUTIONS 2. Address of the Factory M403, SILENT PARK CHS. LTD. MIRA BHAYANDER ROAD NEAR GOLDEN NEST, BHAVANDER-EAST, THANE-401105 3. Distinguishing Marks and description sufficient : Polyester Wobbing Sling, Make: 'N.A’, To identity the lifting machine, lifting tackle ote, : SWL: 05 Ton, SR.NO: 006007, + Length: 06 Mtrs, Color: ‘RED 1 4. Date when lifting machine was first used In the : 2021 Factory 5. Date of each examination made undor section: Through Visual Inspection, Physical Observation, 29(1}(a)(i) and by whom it was carried out: & Functional Load Test Carried Out As Per Standard : By Mr. Manoj Panchal on 28/06/2021 6. Date and number of the certificate rolating to: By Manufacturor Any test and examination made under sub-rule Of rule 60 together with the name of the Person who Issued the certificate 7. Dato of annealing or other heat treatment of: Not Applicable Duo To Materlal Of Construction Tho chain and lifting tackle carried out under : Found In order, Functional Load Test Carried out. ‘Sub-rule (5) of rule 60 and by whom earried out 8, Particulars of any defect found at any such. : No Defocts Noticed. Safo To Use At The SWL Capacity. Examination or after annealing and affecting ||, : Visual Inspection For Damage Should Be Carried Out The safe working load and the step taken to |: By User Before Use The Same, Remedy such defect. | certify that on, 28/06/2021, | thoroughly examined lifting machine/ropellifting tackle and that PR be Competency Certificate No, : GUSMDISHICPT/AV029584722010 MANOJ. R. PANCHAL ‘And Date 7108/2020 To 06/08/2021 COMPETENT PERSON & tasved by Director, Industrial Safety & Health (CHARTERED ENGINEER-AM180669-9 Gujarat State, Ahmadabad 8. TECH (M), ASNT LEVEL II (UT) NEXT INSPECTION & EXAMINATION RECOMMENDED ON 27/06/2022 Ins-00 4 ase: 2 MARUTI ENTERPRISE @® St, GIDC ESTATE, PHASE-1, BLUE STAR ROAD, NARMADA NAGAR -392018, BHARUCH, TPE INSPECTION, CERTIFICATION AND CALIBRATION OF EQUIPMENT AS Pit FACTORIES ACT, MOB.: 9825684100 Office 1409205373 & 8 27 E- 94 Tost Certificate No.: HES- 131/24 Dato: 26/00/2021 FORM NO: 10 (Proscribod undor rule 60) Prescribed for roport of the lifting machinos, ropos an lifting tacklos PARTICULARS Registration No: conse No: NIG Code No: NA (As alven in tho teense) 1. Name of Occupier of Factory MIS, HOPE ENGINEERING SOLUTIONS. 2. Address of the Factory +: M-403, SILENT PARK CHS. LTD. MIRA BHAYANDER ROAD {NEAR GOLDEN NEST, BHAYANDER-EAST, THANEWO(108 thet 8. Distinguishing Mars anl description suciont:Tple Spur Goat Chan Ploy Bloc, Mako:"N.A! | To identify the ing machine, lifting tackle etc. : SWL: 10 Ton, Lift: 25 mtrs, SR.NO: 19060086, # Lond Chaln Grado-80 with Load Hook. 4, Date when lifting machine was first used in the : 2021 Factory 55 Date of each examination made under section Through Visual inspection, Physical Observation, 29(4)(a)(ii) and by whom it was carried out 8 Functional Load Test Carried Out As Per Standard : By Mr. Manoj Panchal on 28/06/2021 6. Date and number of the certificate relating to: By Manufacturer Any test and examination made under sub-rule hi Of rule 60 together with the name of the 7 h, Person who issued the certificate i 7. Date of annealing or other heat treatment of: Not Applicabie Due To Material Of Construction The chain and lifting tackle carried out under): Found in order, Functional Load Tost Catriod out Sub-rute (5) of rule 60 and by whom carried out 8. Particulars of any defect found at any such | :No Defects Noticed. Safe To Uso At The SWL Capacity, Examination or after annealing and affecting, |), : Visual Inspection For Damage Should Be Carried Out ‘The safe working load and the step taken to |): By User Before Use The Same. Remedy such defect. | oertify that on, 28/06/2021, | thoroughly examined lifting machinelropelliting tackle and that Mo Rome MANOJ. R. PANCHAL Competency Catifeate Ne: CUIDISHICPTIADa3sR4722010 Anddate | orive2020 To osos202t COMPETENT PERSON & issvedby | rector, Industral Saey & Heath (CHARTERED ENGINEER-Attt00669.9 Gujarat State, Ahmadabad = LS B. TECH (M), ASNT LEVEL II (UT) NEXT INSPECTION & EXAMINATION RECOMMENDED ON 27/06/2022

You might also like