Proyecto: PTAP PUERTO LOPEZ

Fecha: 2016.08.03

CARTILLA DE HIERROS
Estructura: MURO DE CONTENCIÓN RELLENO TIPO MT1

Item Figura Barra No. Peso (kg/m) Longitud (m) Cantidad Peso Item (kg)
A 0.30 9.16 0.30 6 2.235 9.76 5 109.07
B 0.35 4.18 0.35 7 3.042 4.88 5 74.22
C 0.30 6.71 0.30 6 2.235 7.31 4 65.35
D 0.25 9.16 0.25 5 1.552 9.66 6 89.95
E 0.30 4.18 0.30 6 2.235 4.78 3 32.05
F 0.30 6.19 0.30 6 2.235 6.79 12 182.11
G 0.00 1.30 0.00 4 0.994 1.30 38 49.10
H 0.00 1.30 0.00 5 1.552 1.30 118 238.08
I 4 0.994 0.00 0 0.00
J 4 0.994 0.00 0 0.00
K 4 0.994 0.00 0 0.00
L 4 0.994 0.00 0 0.00
M 4 0.994 0.00 0 0.00
N 4 0.994 0.00 0 0.00
O 4 0.994 0.00 0 0.00
P 4 0.994 0.00 0 0.00
Q 4 0.994 0.00 0 0.00
R 4 0.994 0.00 0 0.00
S 4 0.994 0.00 0 0.00
T 4 0.994 0.00 0 0.00
U 4 0.994 0.00 0 0.00
V 4 0.994 0.00 0 0.00
W 4 0.994 0.00 0 0.00
X 4 0.994 0.00 0 0.00
Y 4 0.994 0.00 0 0.00
Z 4 0.994 0.00 0 0.00
AA 4 0.994 0.00 0 0.00
AB 4 0.994 0.00 0 0.00
AC 4 0.994 0.00 0 0.00
AD 4 0.994 0.00 0 0.00
AE 4 0.994 0.00 0 0.00
AF 4 0.994 0.00 0 0.00
AG 4 0.994 0.00 0 0.00
AH 4 0.994 0.00 0 0.00
AI 4 0.994 0.00 0 0.00
AJ 4 0.994 0.00 0 0.00
AK 4 0.994 0.00 0 0.00
AL 4 0.994 0.00 0 0.00
AM 4 0.994 0.00 0 0.00
AN 4 0.994 0.00 0 0.00
AO 4 0.994 0.00 0 0.00
AP 4 0.994 0.00 0 0.00
AQ 4 0.994 0.00 0 0.00
AR 4 0.994 0.00 0 0.00
AS 4 0.994 0.00 0 0.00
AT 4 0.994 0.00 0 0.00
AU 4 0.994 0.00 0 0.00
S= 839.94
Proyecto: PTAP PUERTO LOPEZ
Fecha: 2016.08.03

CALCULO DE VOLUMEN DE CONCRETO


Estructura: MURO DE CONTENCIÓN RELLENO TIPO MT1

Nota: No se incluye el peso de la malla electrosoldada f'c: 28.00 MPa


fy: 420.00 MPa
Volumen: 9.80 m3/m
Cuantia de acero: 85.71 kg/m3

3
Descripción Largo (m) Ancho (m) Alto (m) Volumen (m )
Concreto de limpieza 6.40 1.00 0.07 0.45
S: 0.45
f'c: 14.00 MPa