Architecture & Urban legislation

Submitted by: Rawda Wael ID: 202000283 Submitted to: DR. Maram Adel
1- The role of the Owner 2- The role of the Engineer 3- The role of the Contractor
 Right of Access to the Site.  Engineer’s Duties and Authority.  Performance Security.
The Contractor has access to the entire site from the The Engineer is appointed by the Employer to The Contractor is responsible for ensuring the
Employer, but may not own exclusive possession. perform tasks under the Contract, with a qualified validity of the Performance Security until the Works
Employer may retain foundation, structure, workforce. They cannot change contract terms, but are completed and any flaws are fixed, unless they
equipment, or access points until Performance can use authority as stated. Employer consent is receive the Performance Certificate 28 days before
Security is received. required for authorized use, and changes must be its expiry date.
 Permits, Licenses or Approvals. promptly communicated.  Contractor’s Representative.
The employer will provide assistance to the  Delegation by the Engineer. The Contractor must designate a representative and
contractor in obtaining necessary national laws and Engineers can assign tasks, delegate authority, or grant essential rights, and must submit their details
authorizations, licenses, or consents, as requested by withdraw delegations, including independent to the Engineer before the Commencement Date,
the contractor. inspectors or resident engineers, with assignments and cannot remove or substitute their representative
 Employer’s Personnel. and revocations written and received by all parties. without Engineer's approval.
The employer ensures that its employees and  Instructions of the Engineer.  Subcontractors.
contractors on site perform the same tasks as the The contractor must adhere to all instructions from The Contractor cannot subcontract the entire Works,
contractor is required to perform. the Engineer or designated assistant regarding the and any actions or defaults by subcontractors will be
 Employer’s Financial Arrangements. Contract, and can request additional or modified held accountable. Subcontracts must include
The Employer must inform the Contractor of a bank drawings for work execution and defects. Both provisions requiring assignment, and Engineers
loan suspension within seven days, provide full parties must receive written confirmation within two must be given 28 days' notice.
details, and provide evidence of alternative funds for working days.  Assignment of Benefit of Subcontract
payment after sixty days.  Replacement of the Engineer. In the event that a Subcontractor's duties beyond the
 Employer’s Claims. If the Employer plans to replace the Engineer, it applicable Defects Notification Period's expiration
The Employer or Contractor will receive they are must notify the Contractor of the name, address, and date and the Engineer notifies the Contractor
entitled to payment under conditions or extend the appropriate experience of the intended replacement beforehand to transfer the benefit of such
Defects Notification Period, but not for other at least 42 days in advance of the planned obligations to the Employer, then the Contractor is
services. replacement date. required to comply. After the assignment takes
 Determinations. effect, the Contractor will not be liable to the
The Engineer will consult with each party to reach a Employer for any work done by the Subcontractor,
consensus, and if no agreement is reached, the unless otherwise specified in the assignment.
Engineer will make a fair decision in accordance  Site Data
with the contract, with each party implementing the The Contractor shall be responsible for interpreting
resolution. all such data.