You are on page 1of 60

Consulting Engineers

Geo-Environment
Architect

DETAIL ENGINEERING DESIGN DRAWING


Rumah Pos Pengumben Nomor B-8A dan B-8B

Proyek Perencanaan Renovasi Rumah Perusahaan Komplek BULOG


Pos Pengumben Tahun 2022 Tropical House

Nomor Kontrak PJ-623/DS401/PL.05.02/08/2022 Compact House

Lokasi Komplek BULOG Pos Pengumben, Jakarta Barat Less Maintenance

Nomor Bangunan BLOK B-8


Sustainable
Perencana PT. GWA Desain Teknologi
Passive Design
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DAFTAR GAMBAR Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 -
Geo-Environment PENGUMBEN Novia Fatmawati.S.Ars Rezhania Prathista D, S.Ars. Agung Santoso, S.T.
Architects Revision No.
Architect Drafter Team Leader

Daftar Gambar
1 : 100
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
As indicated
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) SITEPLAN EKSISTING Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 A100
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

37.00

35.50
36.50

36.00
37
.5
0

37.721
slk

.00 36.0
0
37

50
36.
38.00

38.00
Luas Tanah = 281.28 m2

Simbol Keterangan

Siteplan Eksisting Batas Jalan

1 Selokan
1 : 200
0.00 Kontur mayor

0.00 Kontur minor

Dinding eksisting yang dibongkar


Scale :
Dinding eksisting yang dipertahankan

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH EKSISTING Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 A101
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4

1485

224 414 539 100 208

382
473

50
D

280
377

279
1933

1892
C
425

327
50
239

B
145

525
152

Denah Eksisting
1
123

1 : 100

Simbol Keterangan

177 102 747 306 156 Dinding eksisting yang dibongkar

Dinding eksisting yang dipertahankan


Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF DEPAN Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8
CONSULTING ENGINEERS A102
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Perspektif Depan Bangunan


1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF BELAKANG Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 A103
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Perspektif Belakang Bangunan


2
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) GAMBAR TAMPAK SISI UTARA DAN Sheet No.
BULOG A104
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG SELATAN BANGUNAN BLOK B8
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Finished Facade Elevation

470

Roof Ridge Elevation

415
Roof Band Elevation

270

Finished Floor Elevation

Tampak Sisi Utara


1
1 : 100

Finished Facade Elevation

470

Roof Ridge Elevation

415
Roof Band Elevation

270

Finished Floor Elevation

Tampak Sisi Selatan


2
1 : 100

Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) GAMBAR TAMPAK SISI TIMUR DAN Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BARAT BANGUNAN BLOK B8 A105
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Finished Facade Elevation

470

Roof Ridge Elevation

415
Roof Band Elevation

270

Finished Floor Elevation

Tampak Sisi Timur


3
1 : 100

Finished Facade Elevation

470

Roof Ridge Elevation

415
Roof Band Elevation

270

Finished Floor Elevation

Tampak Sisi Barat


4
1 : 100

Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH BANGUNAN BLOK B8 Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG A106
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

4 5 6
A106 A107 A107

1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280

Taman Taman
-0.10 -0.10

Carport Carport
-0.05 -0.05

G
A

170

170
Kamar Anak Kamar Anak

250

250
+0.00 +0.00

80

80
A105
F
B
170

170
Open Space Open Space
+0.00 +0.00
E
C
Innercourt Innercourt
430

430
-0.05 -0.05
120

120
2
A105 Dapur Dapur
+0.00 +0.00
140

140
D
Kamar Utama Kamar Utama
+0.00 +0.00
Kamar Anak
Kamar Anak
+0.00
300

300
+0.00

C
E
645

645
-0.03 -0.03
3 Kamar ART Kamar ART
215

215
A106 Toilet Toilet
+0.00 +0.00
-0.05 -0.05

B
F
Toilet ART Area Servis Toilet ART
130

130
Area Servis
+0.02 -0.08 -0.05 -0.05 -0.08 +0.02

A
G
Denah Bangunan Blok B8
1 Taman Belakang Taman Belakang

1 : 100

Scale : 160 75 120 45 230 230 45 120 75 160

280 350 350 280


0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) GAMBAR POTONGAN 1 DAN 2 Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A107
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 4 6 7
Finished Facade Elevation

STRUKTUR ATAP 470


Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm
Penutup Atap Solid UPVC Roof Single Layer Roof Ridge Elevation
Bumbungan UPVC
415
CEILLING Roof Band Elevation
Gypsumboard 1200x2400x9mm
270
SIDE DOOR
Pintu Expanda dengan rangka hollow 50x50mm

INTERIOR WALL
Hebel unfinished look
Fin. Acian semen instan warna abu - abu Kamar Anak
Open Space Open Space
Kamar Anak
FLOOR
Keramik 60 x 60 cm +0.00 +0.00 +0.00 +0.00 Finished Floor Elevation

0
PONDASI
Pondasi Batu Belah Base Foundation
110 280 350 350 280 -95

Potongan 1
1
1 : 100

STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm 1 3 4 5 7
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC

INTERIOR WALL
Hebel unfinished look Roof Ridge Elevation
Fin. Acian semen instan warna abu - abu
415
CEILLING
Gypsumboard 1200x2400x9mm

Roof Band Elevation

270

FLOOR
Keramik 60 x 60 cm

Taman Open Space Innercourt Innercourt Open Space Taman

-0.05 +0.00
-0.10 +0.00 -0.05 -0.10 Finished Floor Elevation

0
PONDASI
Pondasi Batu Belah Base Foundation

400 230 230 400 -95

Potongan 2
2
1 : 100

Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) GAMBAR POTONGAN 3 DAN 4 Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A108
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 3 4 5 7

STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm Roof Ridge Elevation
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC 415

CEILLING
Gypsumboard 1200x2400x9mm Roof Band Elevation

TOILET WALL 270


Keramik Dinding 30 x 60 cm

INTERIOR WALL
Hebel unfinished look
Fin. Acian semen instan warna abu - abu Taman Toilet Open Space Kamar ART Kamar ART Open Space Toilet Taman
FLOOR
Keramik 30 x 30 cm -0.03 +0.00 +0.00 +0.00 +0.00 -0.03
-0.10 -0.10 Finished Floor Elevation

0
PONDASI
Pondasi Batu Belah Base Foundation

-95
160 240 230 230 240 160

Potongan 3
3
1 : 100

A B D E F G
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm Finished Facade Elevation
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC 470

CEILLING
Gypsumboard 1200x2400x9mm

Roof Band Elevation


INTERIOR WALL
270
Hebel unfinished look
Fin. Acian semen instan warna abu - abu

FLOOR
Keramik motif Kayu 50x50 cm

PARAPET Kamar Anak Open Space Kamar Anak Toilet Toilet ART Taman
Carport
-0.05 +0.00 +0.00 +0.00 -0.05 -0.08 -0.10 Finished Floor Elevation

0
PONDASI
Pondasi Batu Belah
Base Foundation

-95

250 430 300 215 130

Potongan 4
4
1 : 100

Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) GAMBAR POTONGAN 5 DAN 6 Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A109
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC

FACADE WALL C D E F
Hebel Finishing Bata Tempel

Roof Ridge Elevation


CEILING
Gypsumboard 1200x2400x9mm 415

INTERIOR WALL
Hebel unfinished look Roof Band Elevation
Fin. Acian semen instan warna abu - abu
270

FLOOR
Keramik motif Kayu 50x50 cm

Carport Open Space Innercourt Kamar Utama Kamar ART Area Servis Taman

-0.05 +0.00 -0.05 +0.00 +0.00 -0.05 Finished Floor Elevation

PONDASI 0
Pondasi Batu Belah
Base Foundation

-95
622 250 120 440 215

Potongan 5
5
1 : 100
A B C D E F G
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm
Penutup Atap Solid UPVC Roof Single Layer Finished Facade Elevation
Bumbungan UPVC
470

CEILLING
Gypsumboard 1200x2400x9mm Roof Ridge Elevation
FACADE WALL 415
Hebel Finishing Bata Tempel

INTERIOR WALL
Hebel unfinished look
Fin. Acian semen instan warna abu - abu

FLOOR
Keramik motif Kayu 50x50 cm Open Space Selasar Area Servis Taman
Carport
-0.05 +0.00 +0.00 -0.05 -0.10 Finished Floor Elevation

PONDASI 0
Pondasi Batu Belah
Base Foundation

-95
565 810 215

Potongan 6
6
1 : 100

Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF BANGUNAN BLOK B8 Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG A110
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN
Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Perspektif Bangunan
1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH LANTAI Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A111
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280

Taman Depan Taman Depan


L9 L9

360

340
Carport Carport
L4 L4

G
A

170

170
Kamar Anak
250

250
Kamar Anak
L2 L2

80

80
F
B
170

170
Open Space Open Space
L1 L1
E
C
Innercourt Innercourt
430

430
120

120
L7 L7

Dapur Dapur
140

140
D
Kamar Utama Kamar Utama
L2 L2
Kamar Anak Kamar Anak
300

300
L2 L2

C
E
645

645
Kamar ART Kamar ART Toilet Simbol Keterangan
Toilet
215

215
L3 L3 L5
L5 L1 Keramik 60 x 60 cm

B
F L2 Keramik motif kayu 50 x 50 cm

Toilet ART Area Servis Area Servis Toilet ART L3 Homogenous tile putih 30 x 30 cm
130

130
L8 L6 L6 L8

A
G L4 Beton t = 5 cm

Denah Lantai L5 Keramik toilet 60 x 60 cm

1
Taman Belakang L9 L9 Taman Belakang
L6 Keramik 50 x 50 cm
1 : 100
L7 Batu koral putih

160 75 120 45 230 230 45 120 75 160 L8 Keramik toilet 30 x 30 cm


Scale :
280 350 350 280 L9 Batu split

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PINTU DAN JENDELA Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A112
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280

462
P4B P4A
G
A

170

170
P2 P2
250

250
Kamar Anak
J1 J1

80

80
F
B
P1 P1
170

170
PJ 5 J2 J2 PJ 5

Open Space Open Space


E
C
430

430
Innercourt Innercourt
120

120
PJ1 PJ1

Dapur Dapur
P1 PJ 4 PJ 4 P1
140

140
D

Kamar Utama Kamar Utama

Kamar Anak
300

300
Kamar Anak

P1 P1
J1 J1

C
E
645

645
BV P3 P3 BV

Toilet
215

215
Toilet Kamar ART Kamar ART

PJ2 PJ3 PJ3 PJ2


B
F
P3 P3 BV
130

130
BV
Toilet ART Toilet ART

A
G

Denah Pintu & Jendela Simbol Keterangan

1 P Pintu
1 : 100
160 75 120 45 230 230 45 120 75 160 J Jendela

Scale : 280 350 350 280 PJ Pintu Jendela

BV Boven
0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PINTU Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A113
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

DETAIL PINTU (P1) DETAIL PINTU (P2) DETAIL PINTU (P3) DETAIL PINTU (P4)
80
90 120 P4A P4B

5 96 5 5 82 5

5
35

35
5

5
210 210

210
100

100

205

205
120 80
90
5 110 5 5 70 5
5 80 5

10 10 10

5 31 5 60 5 22 5 60 5

KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN - KUSEN PVC KUSEN Hollow 50 x 50 mm
DAUN PINTU Engineering Door DAUN PINTU Engineering Door DAUN PINTU PVC DAUN PINTU Plat expanded metal besi type F - 3035
FINISHING finishing HPL FINISHING finishing HPL FINISHING - FINISHING Cat
DAUN JENDELA - DAUN JENDELA - DAUN JENDELA - DAUN JENDELA -
KACA JENDELA - KACA JENDELA - KACA JENDELA - KACA JENDELA -
HANDLE 1 set HANDLE 1 set HANDLE 1 set HANDLE 1 set
ENGSEL 3 bh ENGSEL engsel Pivot 1 set ENGSEL 3 bh ENGSEL 3 bh
KUNCI 1 set dengan handle KUNCI Cylinder kunci dengan ring warna hitam KUNCI 1 set kunci slot plastik KUNCI 1 set
JUMLAH UNIT 6 bh JUMLAH UNIT 2 bh JUMLAH UNIT 4 bh JUMLAH UNIT 2 bh
PENEMPATAN Kamar Utama, kamar Anak PENEMPATAN Open Space PENEMPATAN Kamar Mandi, Kamar Mandi ART PENEMPATAN Lorong Taman

Detail Pintu
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PINTU JENDELA 1 Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A114
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

DETAIL PINTU JENDELA (PJ 1) DETAIL PINTU JENDELA (PJ 2) DETAIL PINTU JENDELA (PJ 3) DETAIL PINTU JENDELA (PJ 4)

150
100 150
5 80 5 55 5
150
5 90 5
5 5
5 5

110

190 200
200 190
205 5

100

100
80

5
5

100 150
150 5 70 70 5
5 90 5
5 80 5 55 5 5 80 5 60

10 10

10

10

KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating
DAUN PINTU Alumunium 0.9 mm DAUN PINTU Engineering Door DAUN PINTU Engineering Door DAUN PINTU

FINISHING finishing Powder Coating FINISHING Finishing HPL FINISHING finishing HPL FINISHING -
DAUN JENDELA - DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating
KACA JENDELA Tempered 8mm KACA JENDELA Tempered 8 mm KACA JENDELA Kaca biasa 5mm KACA JENDELA Tempered 8mm
HANDLE 1 set HANDLE 1 set HANDLE 1 set HANDLE 1 set
ENGSEL 3 bh ENGSEL 3 bh ensel pintu, 1 set engsel pivot ENGSEL 3 bh engsel pintu, 2 bh engsel jendela ENGSEL 4 bh engsel jendela
KUNCI 2 set KUNCI 1 set dengan handle KUNCI 1 set dengan handle KUNCI 2 set
JUMLAH UNIT 2 bh JUMLAH UNIT 2 bh JUMLAH UNIT 2 bh JUMLAH UNIT 2 bh
PENEMPATAN Innercourt PENEMPATAN Dapur PENEMPATAN kamar ART PENEMPATAN Kamar Utama

Detail Pintu Jendela 1


1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 20
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PINTU JENDELA 2 Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A115
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

DETAIL PINTU JENDELA (PJ 5)

5
5

190

5
5
5 50 50 50 50 5
10

5 200 5

KUSEN Alumunium 0.9 mm, finishing Powder Coating

DAUN PINTU Alumunium 0.9 mm, finishing Powder Coating

FINISHING -

DAUN JENDELA -

KACA JENDELA Tempered 8mm

HANDLE 1 set

ENGSEL 12 bh

KUNCI 4 set

Detail Pintu Jendela 2 JUMLAH UNIT 2 bh

PENEMPATAN Open Space


1 : 20
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL JENDELA Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A116
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

DETAIL JENDELA (J1) DETAIL JENDELA BOVEN (BV) DETAIL JENDELA (J2)

60
70 5
5 50 5
5 60 5
5
5

30 40

130 120

200
70

5 60 5

5 10

5
10 5 170 5

5 50 5

60
10

5 170 5

KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating
DAUN PINTU - DAUN PINTU - DAUN PINTU -
FINISHING - FINISHING - FINISHING -
DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating
KACA JENDELA Kaca biasa 5mm KACA JENDELA Kaca biasa 5mm KACA JENDELA Tempered 8mm
HANDLE - HANDLE - HANDLE -
ENGSEL 2 bh ENGSEL - ENGSEL -
KUNCI 2 set KUNCI - KUNCI -
JUMLAH UNIT 4 bh JUMLAH UNIT 4 bh JUMLAH UNIT 2 bh
PENEMPATAN kamar Anak PENEMPATAN Kamar mandi, kamar mandi ART PENEMPATAN Innercourt

Detail Jendela
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH FURNITURE Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A117
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280

462
Simbol Keterangan

LF Loose Furniture

FF Fix Furniture

G
A E Elektronik

LF1 LF1

170

170
250

250
Kamar Anak

Simbol Keterangan Jml.


LF4 LF4
80

80
LF2 LF2
F
B LF1 Bed 120 x 200 cm 6
LF5 LF5 LF5 LF5
LF2 Lemari 50 x 200 cm 6
LF8 LF8 LF8 LF8
170

170
LF6 LF6
LF7 LF7 LF3 Meja belajar 60 x 80 cm 2
Open Space Open Space
E
C
LF8 LF8 LF8 LF8 LF4 Credenza 2
430

430
120

120
Innercourt Innercourt
LF5 Sofa single 4

Dapur LF6 Sofa double 2


Dapur
140

140
FF1 E1 E1 FF1 LF7 Meja makan 120 x 80 cm 2

D
LF8 Kursi makan 8
Kamar Utama Kamar Utama
LF1 LF2 LF9 LF9 LF2 LF1
LF9 Bed 180 x 200 cm 2
Kamar Anak
Kamar Anak
300

300
LF10 Kursi rias 2

LF10 LF10 Meja rias 60 x 120 cm 2


LF11
LF3 LF10 LF11 LF2 LF2 LF11 LF10 LF3
LF12 Lemari ART 2
C
E
645

645
FF2 LF12 LF12 FF2 FF1 Kitchen set 2

Toilet
215

215
Kamar ART Kamar ART Toilet FF2 Kloset 2
FF3
LF1 LF1
FF4 FF4 FF3
FF3 Shower set 2
B
F
FF4 Wastafel 2
FF5 E2 E2 FF5
130

130
Toilet ART Area Servis Area Servis Toilet ART
FF5 Kloset jongkok 2
A
G
E1 Kulkas 2

Denah Furniture E2 Mesin cuci 2

1
1 : 100

160 75 120 45 230 230 45 120 75 160

Scale : 280 350 350 280

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH RANGKA PLAFOND Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A118
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

250

250
B

C
430

430
D
300

300
E
215

215
F
Denah Rangka Plafond
130

130
1 G
1 : 100

Keterangan

- Rangka holllow 40x40 mm, ukuran 120x60 cm


Scale : 160 240 230 230
231 240
239 160

630 630
0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PLAFOND Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A119
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

630 630
280 75 45 230 230 45 75 280

170

170
G1 G1
250

250
80

80
B
170

170
C
G1 G1
430

430
120

120
140

140
D

G1 G1
300

300
G1 G1

E
645

645
215

215
G1 G1 G1

F
Simbol Keterangan
130

130
Gypsum Board 1200 x 2400 x 9mm,
G1
G Rangka Hollow 40x40mm

Denah Plafond
1
1 : 100

Scale : 160 75 120 45 230 230 45 120 75 160

280 350 350 280


0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 15
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PLAFOND Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A120
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Penutup Atap Solid UPVC Roof Single Layer

Rangka Kuda-kuda CNP 125x50x20x2.3 mm

Gording CNP 60x30x10x1.3 mm

Rangka Hollow 40x40 mm


Ring Balk RB 1 Plafond Gypsum Board 1200x2400x9mm

Rangka Hollow 40x40 mm Rangka Hollow 40x40mm


60

60

60

Detail Plafond 1
1
1 : 15 120

120

Penutup Atap Solid UPVC Roof Single Layer

Rangka Kuda-kuda CNP 125x50x20x2.3 mm

Gording CNP 60x30x10x1.3 mm


Perspektif Detail Plafond
3

Rangka Hollow 40x40 mm


Dinding Batu Hebel
Rangka Hollow 40x40 mm

Detail Plafond 2
2
1 : 15
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH RANGKA KANOPI Sheet No. A121
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

97 97

R
A G

100

90
R

R
G
A

250

250
R

C
430

430
D
300

300
E
215

345
F
130

Denah Rangka Kanopi


1 Simbol Keterangan
1 : 100 160 240 230 230
231 240
239 160

R Reng Baja Ringan 35x20x30x12x1mm


200 430 430 200
Scale : A Penutup Atap UPVC Roof Single Layer

G Rangka Baja Ringan Double 75x35x8x1.3mm


0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE As indicated
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL KANOPI Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A122
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Roof Band Elevation

270

2
A122

Detail Kanopi
1
1 : 25

STRUKTUR KANOPI 10
Double Baja Ringan Canal C 75x35x8x1.3mm 0
STRUKTUR KANOPI
Reng Baja Ringan 35x20x30x12x1mm 10
0
STRUKTUR KANOPI
Atap Solid UPVC Single Layer

DINDING
Pass. Dinding

90
BAUT
90
Dynabolt M8 x 85 mm

862

Detail 2-A 122 Perspektif Kanopi


2 3
1 : 12
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE As indicated
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PARAPET Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A123
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

111 240 60 335 335 60 240 65

Tampak Detail Parapet


1
1 : 50

PLANTER BOX
Ukuran 20 x 20 x 20 cm

RUMAH LAMPU LED STRIP


Lebar 25 mm
ex. Huben, type rulam-24

20

ROSTER
Terracotta
20

Ukuran 20 x 20 cm

Detail Potongan Parapet Perspektif Parapet


2 3
1 : 20
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL GERBANG Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A124
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

PLANTER BOX
Ukuran 20 x 20 x 20 cm GERBANG
Hollow 50 x 50 mm
5 80 55 80 5 80 5 80 5 80 5

REL ATAS
Roda dia 5 cm

PENGAMAN
Hollow 50 x 50 mm
90

PAS. DINDING
Unfinished hebel EXPANDED METAL
Type F3035
RODA
Roda pagar dia 10 cm

-0.05

Tampak Depan Gerbang


1
1 : 25 Potongan Detail Pagar
4
1 : 25

5 80 5 80 5 80 5 80 55 80 5
10
90

Tampak Belakang Gerbang


2
1 : 25

Perspektif Gerbang
Denah Gerbang 5
3
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH BESI PENGAMAN
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 Sheet No. A125
CONSULTING ENGINEERS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

255
250
B

C
430

430
D
300

300
E
215

345
F
130

G
Denah Besi Pengaman -
1
166

1 : 100

160 240 230 230 240 160


-
Scale : 194 436 430 200

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE As indicated
Scale
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL BESI PENGAMAN
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 Sheet No. A126
CONSULTING ENGINEERS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

BESI SIKU
3 x 3 cm
tebal 3 mm

BESI
Besi Tulangan D-6 mm

2.40
1
BAUT
A126 Dynabolt M8 x 85 mm

Detail A-126
1
1:5

TITIK LAS
titik pengelasan besi tulangan
berjeda tiap 2 tulangan vertikal
dan dilakukan dengan zig -zag
pada baris horizontal

BESI
Besi Tulangan D-6 mm
Berjarak 30 x 30 cm antar tulangan

-0.10

Detail Potongan Besi Pengaman Perspektif Detail Besi Pengaman


2 3
1 : 20
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale
No. Date Description Sign As indicated
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL SIGNAGE
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 Sheet No. A 127
CONSULTING ENGINEERS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Geo-Environment
Architects Architect Drafter Team Leader
Revision No. 0

1
A 127
3 6 4 5 4 6 3 6 3

4
12

20
KETEBALAN HURUF
1.5 cm
Carport

4
40

Denah Potongan Signage Detail Ukuran Signage


5 2
1 : 50 1:5
10 40 10

PLANTER BOX
Beton 3 cm

20
-

5
SIGNAGE
Plat Besi 2 mm ---
Coating Hitam

20
BESI SAMBUNGAN
Besi D - 6 mm

75
Potongan A-127 Detail Peletakan Signage
1 4
1 : 10 1 : 10
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF STRUKTUR Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S100
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Warna Keterangan

Sloof

Kolom
Perspektif Struktur Ringbalk
1
Pondasi Batu Kali
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PONDASI LAJUR Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S101
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

445

445
G

170

170
420

420
80

80
F
170

170
E
2
120

120
260

260
140

140
D
3
300

300
C
215

215
B
130

130
Denah Pondasi
1 A

1 : 100
211

211
120 505 45 120
Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PONDASI LAJUR Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S102
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Kolom KP1 10x10 cm

Sloof S1 10x15 cm

Lantai Keramik

Rabat Beton tebal 5 cm

Urugan Tanah

200
Pondasi Batu Belah Tipe 1

600
Aanstamping

Urugan Pasir tebal 5 cm

50100
50 600 50

Detail Pondasi Tipe 1


2
1 : 25

Kolom KP2 20x10 cm

Sloof S2 30x20 cm

Lantai Keramik

Rabat Beton tebal 5 cm

Urugan Tanah

20
Pondasi Batu Belah Tipe 2

600
Aanstamping

Urugan Pasir tebal 5 cm

50100
50 800 50
Detail Pondasi Lajur
1
Detail Pondasi Tipe 2
3
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH SLOOF Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S103
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

S2
S1 S1
G
170

170
S1

S1

S1
S1 S1
420

420
80

80
S1 S1
F

S2
170

170
S1 S1
E
120

120
S1

S1

S1

S1
S1 S1
260

260
140

140
S1 S1
D
S1

S2

S1
300

300
S1

S1
S1 S1 S1 S1
C
215

215
S1

S1

S2

S1

S1

S1
S1 S1 S1
B
130

130
S1

S1

S1 S1
A
Denah Sloof
S2

1
1 : 100 Keterangan

- Sloof S1 ukuran 15x20 dengan tulangan Utama 4 Ø8 dan


120 505 45 120 Sengkang Ø8 - 150.
Scale : - Sloof S2 ukuran 30x20 dengan tulangan Utama 6 Ø8 dan
Sengkang Ø8 - 150.
0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH KOLOM Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S104
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

KP 2

300

300
KP 2
130

130
KP 1 KP 1 KP 1 KP 1
G
170

170
KP 1 KP 2 KP 1
420

420
80

80
KP 1 KP 1 KP 1 KP 1
F
170

170
KP 1 KP 2 KP 1
E
120

120
KP 1 KP 2 KP 1
260

260
KP 1 KP 1
140

140
KP 1 KP 1 KP 1 KP 1
D
300

300
KP 1 KP 1 KP 1 KP 1 KP 2 KP 1 KP 1 KP 1 KP 1
C
KP 1 KP 1
215

215
KP 1 KP 1 KP 1 KP 2 KP 1 KP 1 KP 1
B
KP 1 KP 1
130

130
KP 1 KP 1 KP 1 KP 1
A
Denah Kolom
1
206

206
1 : 100 Keterangan
KP 2

- Kolom praktis KP 1 ukuran 10x10 dengan tulangan Utama 4 Ø8 dan


Sengkang Ø8 - 150.
Scale : 160 40 35 120 45 230 230 45 120 35 40 160 - Kolom praktis KP 2 ukuran 20x10 dengan tulangan Utama 4 Ø8 dan
Sengkang Ø8 - 150.

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH RINGBALK Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S105
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

RB 1 RB 1
G
170

170
RB 1

RB 1
250

250
RB 1 RB 1
80

80
RB 1 RB 1
F

RB 2
170

170

170

170
RB 1 RB 1
E

RB 1

RB 1
120

120
RB 1

RB 1
RB 1 RB 1
260

260
140

140
RB 1 RB 1
D
RB 1

RB 1
RB 2
RB 1

RB 1

RB 1

RB 1
300

300
RB 1 RB 1 RB 1 RB 1 RB 1 RB 1
C
RB 2
RB 1

RB 1

RB 1

RB 1

RB 1

RB 1
215

215
RB 1 RB 1 RB 1 RB 1 RB 1 RB 1
B
RB 1
RB 1

RB 1

RB 1
130

130
Denah Ringbalk A
RB 1 RB 1

1
RB 2

1 : 100
211

211
Keterangan

- Ringbalk RB 1 ukuran 10x15 dengan tulangan Utama 4 Ø8 dan Sengkang


Ø8 - 150.
Scale : 160 40 35 120 45 230 230 45 120 35 40 160 - Ringbalk RB 2 ukuran 20x15 dengan tulangan Utama 4 Ø8 dan Sengkang
Ø8 - 150.

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH RANGKA ATAP Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S106
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

1260

280 120 230 230 120 280

139 139

RK
G

TS

170
250
RK

TS TS TS

80
F RK

TS TS
170

170

RK
E
TS TS
120

RK
260

TS TS
140

G
RK
D
TS TS TS

RK
300

TS TS

RK
C
TS TS TS
215

TS TS

RK
B
G
Denah Rangka Atap
130

G Simbol Keterangan
1 A
RK Rangka Kuda-Kuda CNP 125x50x20x2.3 mm
1 : 100
G Gording CNp 60x30x10x1.3 mm

A Penutup UPVC Roof Single Layer

PA Plat Atap Beton tebal 12 cm


160 40 35 120 45 230 230 45 120 35 200
Scale :
TS Trekstang Besi Ø8

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE As indicated
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL RANGKA ATAP Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S107
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

A
FFL 4.150
Level 3
B

FFL 2.700
Level 2

280 120 230 230 120 280

630 630

1260

Detail Struktur Rangka Atap


1
1 : 75

Bubungan UPVC Trekstang Besi Ø8


Plat Sambung 12 mm Gording CNP 60x30x10x1.3 mm
Gording CNP 60x30x10x1.3 mm Rangka Kuda-kuda CNP 60x30x10x2.3 mm
Baut 1/2 inc Rangka Kuda-kuda CNP 125x50x20x2.3 mm Plat Sambung 12 mm
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Penutup Atap UPVC Roof Single Layer Penutup Atap UPVC Roof
Penutup Atap UPVC Roof Single Layer
Trekstang Besi Ø8
Trekstang Besi Ø8 Rangka kuda-Kuda CNP 125x50x20x2.3 mm

Ring Balk RB 15 x 20 cm

Detail A Detail B Detail C


A B C
1 : 25 1 : 25 1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF RANGKA ATAP Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S108
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Warna Keterangan

Perspektif Rangka Atap Rangka Kuda-Kuda Cnp 125 x 50 x 20 x 2.3

1 Gording Cnp 60 x 30 x 10 x 1.3


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PLAT ATAP Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S109
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

1260

280 120 230 230 120 280

170

170
250

250
80

80
F
170

170

170

170
E
120

120
260

260
140

140
D
300

300
C
215

215
B
130

130
Denah Plat Atap A

1
1 : 100 Plat Atap 120 mm 1 Plat Atap 120 mm

Scale : 160 40 35 120 45 230 230 45 120 35 200

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PLAT ATAP Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S110
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

200

18
5
0
21
130

A A

A
50

Detail Plat Atap Perspektif Penulangan Plat Atap


1 2
1 : 25

Tualngan P8 - 150 Tulangan P8 - 150


Tulangan P8 - 150 Tulangan P8 - 150
Plat Atap tebal 12 cm
Plat Atap Beton tebal 12 cm

Ringbalk RB 1
10

10
200 130 50

Section A Section B
A B
1 : 25 1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PROYEK RENOVASI RUMAH DINAS PERUM PERUSAHAAN UMUM (PERUM) DENAH STOP KONTAK
BULOG POS PENGUMBEN BULOG BANGUNAN BLOK B8 Sheet No. M100
CONSULTING ENGINEERS Novia Fatmawati, S.Ars Lidya Chistanti D P, S.T Agus Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 350 350 280

Kamar Anak Kamar Anak


MCB 1 MCB 1

250

250
AC Phase 6A Phase 6A AC

Open Space Open Space

C
Innercourt Innercourt
430

430
Dapur AC AC Dapur

Kamar Utama Kamar Utama

Kamar Anak Kamar Anak


300

300
AC AC

E
215

215
Toilet Kamar ART Kamar ART Toilet

Denah Stop Kontak


130

130
Toilet A.R.T Toilet A.R.T
Service Area Area Servis
1 G
1 : 100 Simbol Keterangan

Stop Kontak

Scale : MCB 1 Phase 6A


160 240 225 225 239 160

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH INSTALASI TITIK LAMPU
PERUSAHAAN PERUM BULOG BULOG BANGUNAN BLOK B8 Sheet No. M101
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Chistanti D P, S.T Agus Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 350 350 280

Kamar Anak Kamar Anak


250

250
B

Open Space Open Space

C
430

430
Innercourt Innercourt

D
Kamar Utama Kamar Utama

Kamar Anak Kamar Anak


300

300
E

Toilet Kamar ART Kamar ART Toilet


215

215
F
Toilet ART Toilet A.R.T Simbol Keterangan

130
130

Denah Instalasi Titik Lampu Area Servis Area Servis


Saklar Ganda
G
1 Saklar Tunggal
1 : 100
Lampu LED 12 W

Lampu gantung
Scale : Lampu outdoor sorot LED
160 240 230 231 239 160

Lampu LED Strip


0 100 200 300 400 500 cm 200 424 436 200
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH TITIK LAMPU
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. M102
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Chistanti D P, S.T Agus Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7

280 120 230 230 120 280

Kamar Anak Kamar Anak


250

250
B
170

170
Open Space Open Space

C
Innercourt Innercourt

255
260

Dapur
Dapur

5
Kamar Anak Kamar Anak

Kamar Utama Kamar Utama


300

300
E

Toilet Kamar ART Kamar ART Toilet


215

215
Simbol Keterangan

F Lampu LED 12 W

Lampu gantung
130

130
Toilet A.R.T Service Area Area Servis Toilet A.R.T
G Lampu outdoor sorot LED
Denah Titik Lampu
Lampu LED Strip
1
1 : 100

280 120 230 230 120 280

Scale : 200 430 430 200

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
No. Date Description Sign As indicated
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PIPA AIR BERSIH
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. P100
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7
280 350 350 280 IN
Air bersih dari tandon
masuk ke water heater +220 cm
280 120 230 230 120 280

+90 cm

OUT OUT
Kran Air bersih keluar dari Air bersih dari tandon
Kran
water heater masuk ke masuk ke pipa shower
pipa shower

Carport Carport

Kamar Anak Kamar Anak


Detail Pipa Air Panas
250

250
3 1 : 50

B
PIPA AIR BERSIH
Ketinggian 220 cm
Open Space Open Space PIPA PVC 1/2 inch
dari tandon PIPA AIR PANAS
Ketinggian 220 cm
C PIPA HDPE 1/2 inch
dari water heater
430

430
Innercourt Innercourt

Dapur Dapur

Kamar Utama Kamar Utama

300
Kamar Anak Kamar Anak

Sumur Bor
Sumur Bor 4 inch
515

4 inch

E
Perspektif Pipa Air Panas
2

215
Toilet Kamar Anak Kamar Anak Toilet

F
Kran Kran Simbol Keterangan
130

130
Toilet Toilet
1100 Liter 1100 Liter Pipa air bersih dari sumur bor
Area Servis Area Servis
ke tandon, Pipa PVC 1/2 inch
G
Pipa air bersih dari tandon
Pipa PVC 1/2 inch
Denah Pipa Air Bersih Blok B8
1 1 : 100 Pompa Air

160 240 230 230 240 160 Pipa air panas dari water heater
Pipa HDPE 1/2 inch
200 430 430 200
Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF PIPA SUMBER AIR
PERUSAHAAN KOMPLEKS BULOG BULOG BERSIH BANGUNAN BLOK B8 Sheet No. P101
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

Tandon
1100 Liter

Pompa

Sumur Bor
4 inch

Simbol Keterangan
Pompa
Sumur Bor Pipa air bersih dari sumur bor
D-4 inch ke tandon, Pipa PVC 1/2 inch

Perspektif Pipa Sumber Air Bersih Blok B8


1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF PIPA AIR BERSIH
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. P102
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

Tandon 1000 Liter

Simbol Keterangan

Pipa air bersih dari tandon


Pipa PVC 1/2 inch

Pipa air panas dari water heater


Pipa HDPE 1/2 inch

Perspektif Pipa Air Bersih Blok B8


1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
No. Date Description Sign As indicated
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH SALURAN LIMBAH CAIR
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. P103
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7
280 350 350 280

280 120 230 230 120 280

Sumur Resapan Floor Sumur Resapan


Floor Drain
100 cm Drain 100 cm
Kedalaman 2 m Kedalaman 2 m
25
55

55
Carport Carport

55
A

Kamar Anak Kamar Anak


250

250
B
Perspektif U Ditch D-20 cm
3
170

170
Open Space Open Space

Innercourt Innercourt
3 20 3
260

260
Floor
Dapur Floor Drain Dapur

3
Drain

10
D

3
Kamar Utama Kamar Utama
300

300
Kamar Anak Kamar Anak

Detail U Ditch D-20 cm


2 1 : 10

Floor Floor
Drain Drain
215

215
Toilet Kamar Anak Kamar Anak Toilet

Simbol Keterangan

F
U Ditch Diameter 20 cm
130

130
Toilet A.R.T Area Servis Area Servis Toilet A.R.T
Pipa pembuangan limbah cair
G Pipa PVC 4 inch
Floor Floor
Drain Drain
Denah Saluran Limbah Cair Blok B8
1 1 : 100

160 240 230 230 240 160

200 430 430 200


Scale :

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF SALURAN LIMBAH
PERUSAHAAN KOMPLEKS BULOG BULOG CAIR BANGUNAN BLOK B8 Sheet No. P104
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

Sumur Resapan 100 cm


Kedalaman 2 m

Sumur Resapan 100 cm


Kedalaman 2 m

Simbol Keterangan

U Ditch Diameter 20 cm

Pipa pembuangan limbah cair


Pipa PVC 4 inch

Perspektif Saluran Limbah Cair Blok B8


1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PIPA LIMBAH PADAT
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. P105
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

1 2 3 4 5 6 7
280 350 350 280

280 120 230 230 120 280

Carport Carport

Kamar Anak Kamar Anak

250

250
B
170

170
Open Space Open Space

Innercourt Innercourt
260

260
Dapur Dapur

Kamar Utama Kamar Utama


300

300
Kamar Anak Kamar Anak

E
215

215
Toilet Kamar Anak Kamar Anak Toilet

F
130

130
Toilet A.R.T Area Servis Area Servis Toilet A.R.T

G
Simbol Keterangan

Septictank Septictank Pipa pembuangan limbah padat


Denah Pipa Limbah Padat Blok B8 1000 Liter 1000 Liter Pipa PVC 4 in
1 1 : 100

280 120 230 230 120 280

Scale : 200 430 430 200

0 100 200 300 400 500 cm


DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF PIPA LIMBAH PADAT
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. P105
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

Septictank 1000 Liter

Septictank 1000 Liter

Simbol Keterangan

Pipa pembuangan limbah padat


Pipa PVC 4 in

Perspektif Pipa Limbah Padat Blok B8


1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE As indicated
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL ELEVASI PIPA
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 Sheet No. P107
CONSULTING ENGINEERS POS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

Pot. 2
M109

Dapur

Kamar Utama
+220 cm

Kamar Anak

Pot. 1
M108

+90 cm

Pot. 3
Kamar Anak Toilet
M109
Pot. 4
M109

+20 cm

0 cm

-20 cm
Toilet
1100 Liter

Area Servis -40 cm

-60 cm

Simbol Keterangan

Denah Detail Elevasi Pipa Pot. 1


1 1 : 50
2 1 : 25
Pipa air panas HDPE 1/2 inch

Pipa pembuangan limbah cair


Pipa PVC 4 inch

Pipa pembuangan limbah padat


Pipa PVC 4 in

Pipa air bersih dari sumur bor


ke tandon, Pipa PVC D-1/2 inch

Pipa air bersih dari tandon


Pipa PVC D-1/2 inch
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
No. Date Description Sign As indicated
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL ELEVASI PIPA
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 Sheet No. P108
CONSULTING ENGINEERS PENGUMBEN Novia Fatmawati, S.Ars. Lidya Christanti D P, S.T. Agung Santoso, S.T.
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader

+220 cm

+120 cm

+90 cm
+80 cm
+80 cm

0 cm
0 cm 0 cm

-20 cm
-20 cm -20 cm

-40 cm
-40 cm -40 cm

Pot. 2 Pot. 3 Pot. 4


3 1 : 25
1 1 : 25
2 1 : 25

Simbol Keterangan

Pipa air panas HDPE 1/2 inch

Pipa pembuangan limbah cair


Pipa PVC 4 inch

Pipa air bersih dari tandon


Pipa PVC D-1/2 inch
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 125
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) MATERIAL REFERENSI Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 MR 100
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Material Referensi dinding & Penutup Atap


1 : 125
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 150
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) MATERIAL REFERENSI Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 MR 101
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Material Referenci Penutup Lantai


1 : 150
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 150
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) MATERIAL REFERENSI Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 MR 102
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Material Referensi Sanitasi


1 : 150
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 150
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) MATERIAL REFERENSI Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 MR 103
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Material Referensi Sanitasi 2


1 : 150
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 150
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) MATERIAL REFERENSI Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 MR 104
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Material Referensi Elektrikal


1 : 150
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 150
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) MATERIAL REFERENSI Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 MR 105
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader

Material Referensi Pintu dan Kitchen


1 : 150
www.gwadestek.com

You might also like