TEST REPORT
N° 121050-641928
DELIVERED TO : FRANCE PARATONNERRES
Parc Ester Technopole
9, rue Columbia
87068 LIMOGES, FRANCE
SUBJECT : CORROSION TESTS ON LIGHTNING CONDUCTOR.
Date of delivery of samples =: - 2013-05-21
Test dates 2013 - 06 - 10 to 2013 - 06 - 25
Composition of this document : 8 pages
Fontenay-aux-Roses, 2013 - 06-29
The technical manager,
TABO!
INDUSTRIES ELECTRIOWE
'S.A.S au capital de [5.745.984 €
(era 33 avenue du Geri
a
‘Jean-Luc SALMON
“This document shall not be reproduced, except in fl, without the written approval of he LCIE.
‘This document contains results related ony to te tam tested, I does not imply the conformity ofthe whole production to the items teste
Unless otnenvise spectad, the decision of conformity takes into account the uncertainly of measures,
ren 33, a0 du Gn Leelere Tel #331 4095.60.60 Sowieé par Actions Simple
asi €
des Industries Electriques 9266 Fonenay-aun-Roses codes const lef RS Nanteve B 408 363 174
Laboratoire Central aes Fax 633 140.95 6 56 a capa de 15 >
Une société de Hureat Veritas Fiance vw ee