You are on page 1of 77
THE KENYA POWER & LIGHTING COMPANY LIMITED. SPECIFICATION for SINGLE-PHASE SPLIT PREPAYMENT DIN RAIL MOUNTING ‘STATIC WATT-HOUR METERS FOR ACTIVE ENERGY (Using PLC as medium of communication between MCU and UIU) NAME DESIGNATION ‘SIGNATURE | DATE ~ Patricia Naanga | A. Engineer, Compiled by MeL [| n~04- 2015 Pale Wanyonyt | PA. talons Management aq [OES Ghecked Eng, Margaret | Chief Engineer, OSM& Kanini Metering solutions | Leer | Recom by ‘Aaarey Machasio | Ag. Manager, Eneray Management Macon [ry belie ‘Approved by ‘Joshua Mutua | General Manager, Gitomer Senin | Zepelie | 22/4 |) REVISION RECORD REVISION [DESCRIPTION OF REVISION | DATE o. eT issue ‘Seplombor 2077 | 1 ‘Exclusion of clause § 3 end 5.4 ‘May 2014. 2 Inclusion of clause 4.2.1.7, 4.2.1.23823, 458 | Aucust 2074 3 ‘Amendments on clauses- 4.21.4, 421.6 | Apri 2015 4219, 4221.2, 422110, 422214432, l 433,452 (d).459 510,54 (0), 5785.8 Split Din rail s/phase PLC prepayment meter specs - Apr 2015, Pagel 4. Requirements 4.1 Operating constions requirements. = - 42 Design and consructin requterents — 7 43 lected quem nnn — 44 Aecaracyrequkemants - 45 Inertons and Making — ‘5 Information ana Warranty (Case of Tender Award) 40 6 Appendices. ———— rR ‘Appendix R: Surmary of Tectia Daa. cen ‘open B: Sections Mitr Spt Prepayment Stic Meters for ctve Energy - Genteed Technical Pavers (STH) ree “ Is oT “Spi bm ral apnase Pc prepayment ner spes Apri OTS Fa? Foreword ‘This specification lays down requirements for single-phase DIN rail mounting split prepayment meters for active energy, where the communication between MCU and UIU is by means of PLC. Tre specification is intended for procurement of equipment and does not include provision of contract. Introduction ‘This specification was prepared to establish and promote uniform requirements {or single-phase spt prepayment meters for active energy to be used at Kenya ower and Lighting Company Ltd, The specication lays down the minimum requirements for equipment acceptable for evaluation 1. Scope This specification applies ‘o newly manufactured, single-phase Din ral ‘mounting static watt-hour repayment meters for direct connection, for measurement of alternating current electrical energy consumption at a nominal frequency of 50 Hz ‘The method of credit transier shall be through encrypted numeric tokens. complying with the 20-dig STS encryption algorithms, The meters shall include a load switch for the purpose of interruption or restoration of the lecticty supply to the load in accordance with the current value of the available credit maintained ithe prepayment mete. ‘The Measurement and Control Unit (MCU) shall be separated from the User Interface Unit (UIU) and method of communication between them shall be over power line carer for a distance not less than one hundred (100) metres. 2. References ‘The following documents were referred to during the preparation ofthis ‘specification; in case of conflict, the requirements ofthis specication take precedence. [1] IEC 62055-31:2005 Etecticty metering ~ Payment systems — Part 31: Particular requirements ~ Stalic payment meters for active energy (cases 1 and 2). [2] EC 62052-11:2003, Electicty Metering equipment (ac) ~ General Requirenents, Tests and Test Concitons- PART 11 Metering equipment "roel [3] IEC 62053.21:2003, Electricity metering equipment (ac.) ~ Particular Requirements - Part 21: Stalle meters for actve ‘nergy (cass 1.0). 4] SANS1824-1:2004 Electricity prepayment Systems, Part 1 Prepayment meter. ‘Terms and definitions “The detintons given in 1) 2] and (4) shall apply MCU: Measurement and Control Unit UIU: User Interface Unit Requirements Prepayment meters shall comply with the requirements of [1] and [3] for ‘outdoor meters. The prepayment meters shall be mounted as for normal 44 Operating conditions requirements, 4.14 The meters shall be suitable for operation in tropical climate where temperatures may vary from ~1 to+ 45 degrees Celsius. 4.1.2 Average Annual Relative humidity up to 90% and atitude of upto 2,200m. 4.13 The meters shall be used for measurement of active energy for domestic loads under tropical cimate conditions. 4.2 Design and construction requirements 4.24 General 42.11 The requlrements given in(1} shall apply. 42.1.2 The Measurement and Control Unit (MCU) shall be of DIN rail ‘mounting with locking clip, to it toa 35 mm Din ral 42.1.3 The MCU and UIU shall communicate via PLC for a distance of nat less than one hundred (100) meters. 42.1.4 The meters shall have terminals as follows: i) Top: Uve-in, Neutratin; Bottom: Live-out or i) Top: Live-in, Noutralin: Bottom: Live-ou Neutralout, The meter terminals shall have a protecion cover against ingress of water. [plein ras phase PLC repayment ete Ses 4245 42.18 4247 42474 42472 42473 4218 42.19 424.40 424.41 424.42 424.43 424.46 421.15 ‘The MCU dimensions shall not exceed: Height = 170 mm; Width = 60 ‘mm; and Depth = 130 mm; and meter base shall be on the width side: ‘where the Din ral mount shall be located. ‘The MCU body shall be ultrasonically sealed for life and there should be no screws on the MCU body except for he termination of cables, “The meter shall have terminal cover open detection. Once the terminal cover is opened, the load shal be disconnected. ‘The MCU shall be supplied with loading switch in open mode and instaler can open terminal cover when MCU Is not activated by ‘commissioning code (token). ‘After installation of MCU, the installer wil input a commission code ((oken) to close the loading switch and activate terminal cover open detection function, ‘After commissioning token in put into the MCU and loading switch closes, opening of the terminal cover will ead to tamper. When MCU hhes power and terminal cover is opened, MCU will disconnect Immediately. When MCU has no power and terminal cover is opened, MCU wil datect and record the’ event ard disconnect immediately Power resumes. ‘The MCU shall be sealed and its prinlec circuit boards conformal coated in a manner s0 a8 not to allow mafunction due to ingress of ‘moisture, vermin, dust, chemicals and temperature extremes, ‘The meters terminal holes and screws shall be made of brass or nickel plated brass for high conductivity and corosion resistance. ‘Terminal holes shall be of sufficient size to zeoommodate the cables of al least &-mm diameter and allow a minimum 16mm length of stipped Cable fr frm grip. ‘The meters terminal screw inserts shall be sealable with utlty wire seals, “The meters protection class shal be class Il (Double insulated) ‘The meters shall have a non-volatile memory capable of data storage ‘and with long-term data retention period of rat less than 10 years or for the certiied Ife of the meter or whichever is greater without an , ‘The load switch shall automaticaly restore supply within a minute when the voltage falls within 0.4 ~ 1.15 Up, ‘The meters shall be connectable for 2wite systems, drawing of which shall be printed on the meter body. ‘The meter shal have reference standard currents of: = 5A, Imax 280A Power consumption +The requirement of 3] applies. Influence of short-time over-currents +The requirement of [3] applies. “plein rallsjphase PLE prepayment meta eer AprIZOIE Toe 43.8 Influence of seltheating 1+ The requirement of [3] applies. 439 Overvoltage ‘+ The requirement of 3] applies. 43.10 Insulation test + The requirement of (3) applies. 43.10 Insulation test ‘+ The requirement of [3] applies. 43.11 EMC test ‘©The requirement of [3] applies. Requirements 4.3.6 to 4.3.11 shall form part of the type test approval to be ‘sued by an intemational or the national (of the country of manufacture) ‘meter certifying body. 44 Accuracy requirements, ‘ests and test conditions given in [2] shall apply 44.1. ‘The meters accuracy shall be of class 1 for active energy. 442. Limits of errors due to variation ofthe current. +The requirement of [3] apel 443. Limits of error due to influence quantities +The requirement of [3] applies 444 Test of starting and no-load conditon +The requirement of [3] applies. 4458 Meter constant + The requirement of [3] applies. 44.8 Accuracy test conditions + The requirement of [3] applies. Requirements of clause 4.4 shall form part of the type test approval to be issued by an international or the national (of country of manufacture) meter certifying body. Spe Diralls/phase PL prepayment meter specs ~AIZOIS 4.5 Instructions and Marking 45.1 General ‘The requirements given In {1} shall apply. The information shall be in legible English, indelity marked on the meter and of atleast 4mm figure: height. 452 Specific marking requirements ‘The folowing information shall be metked on each meter. @) The standard transfer specification (STS) compliant serial number, Inthe preferred format known as a national meter number, b) The STS compliance logo, ©) The inscription “Property of KP. &. L Co Lid”, 6) Bar Coded information without blank spaces. 4.5. The following drawings and informetion shall be required withthe tender: ‘8) Meter drawing giving all the relevant dimensions; ) Wiring diagrams; ©) Description leaflet of the meter being offered; 4) Users and operational manuals Spe binralls/phoe PLC prepayment meter spees-ADTI20IS Fase? 454 Asample of the meter offered shall be submited together with test tokens for, different Power Limit Settings and resets for the same, Credit and (Clear Credit Tokens to aid in the testing of the meters. The manufacturer right be required to provide more tokens at no extra cost 455. Copies of type approval certificate (s) with test and calbration results of the meter being offered obtained from an international or the national meter certification body shall be provided. If type approval certificate(s) is (are) from accredited meter certification laboratories (and not national or international body), then it (they) shall be accompanied with copies of certfeates of acoreditation, under ISONEC 17025 from the national or an International certification body. 456 The bidder shall complete clearly, all the clauses in both columns of the Schedule in Appendix B. This shall form the basis of evaluation of ‘the submitted tender. Failure to complete this Appendix shall render the tender non-responsive. The tenderers shall indicate the detalls of their offer where it is cfferent from these requirements. Where the requirement is the same, they shall indicate what is offered. Insertions such as. “noted”, “agreed” atc. shall be considered as non-responsive where a specific response is called for. 4.517 The manufacturer shall provide proof of conformance to ISO 9001(2008) standards by attaching val copy certificates, 458 The manufacturer shal provide a list and contact details of at least four previous utities to which the meter being offered has been supplied 4.89 The manufacturer should have supplied a minimum of 200,000 pieces of the meter type offered to similar utities in the past two years. 45.10 Copies of DLMS/COSEM cerificates shall be submited with this tender 45.1 The manufacturer shall produce meters that fully meet the requirements of the IEC standard, IEC 62055-51:2007 - Electricity metering - Payment systoms Part 61: Standard transfer specifications and henc + Facilitates interoperability amongst hardware, software and meters supplied by other manufacturers + Does not lock KPLC to only the bidder or any one supplier or manufacturer in its future procurement of prepayment meters, ‘software or hardware, Spe Di ralls/phase PUL prepaynet meter sees ~ ADI 2OIS ame? 5. _ Information and Warranty (In Case of Tender Award) 5.1 Drawings and technical details shall be submtted to KPLC for approval before manufacture of the meters commences. KPLC undertakes to submit their comments or approval for the drawings within thtee weeks of receiving the draft copies 5.2 The moter shall have a warranty against any defects, which may develop due to faulty material, calibration, transportation or workmanship for a Period of eighteen months from the date of delivery. All defective meters ‘hall be replaced at the supplier's cost 5.3 _KPLC shall mest the full costs of two engineers, for meter inspection and acceptance testing at the manufacture’ fact. 54 Samples (@) The tenderer shall submit one MCU and two (2) UIU samples together withthe tender documents. The submited mete: samples shall be subjected to accuracy tes's at KPLC's Meter Central Laboratory to verily the requirements of IEC 62053-21:2003 clause 8:1 and (0 verify responsiveness to other -requlrements of this specication, Samples shall not be returned to the tenderers. (©) Bidders are advised that the Laws of Kenya require that the Kenya Bureau of Slandards must approve any rew meter being introduced in the county. To this end Bidders shall furnish the Bureau with 4 (four) samples of each meter type to be supplied. Bids submitted without the meter type approval from the Bureau will NOT be considered non-responsive. However ine winning Bidder must submit this approval before the signing of the supply contract Bidders may communicate directly win the Kenya Bureau of ‘Standards on this matter through the following adress: ‘Tho Managing Director Kenya Bureau of Standards, P.0. Box 84974, 00200 Nairobi Kenya. Tel: (+254 020) 605480, 602360, Fax: (+254 020) 604034 info@kebs.org Em: Web:http:iwww.kebs.org 55 The meters shall be packaged in such a manner as to minimize damage ‘and entry of moisture during transportation and nandng 5.6 The meters shall be packed in suitable groups and / or batches with consecutive serial numbers. Packaging shall be done only after KPLC approval Page 10 87 58 59 5a ‘The meters shal be packaged in multiples of en unless where the number ‘of meters in a groupfbatch does not make a multiple often The number of meters packaged in a group and/or batch for hhanasingtingtcarying by an operator aurualy sitll be sucts Ural Une ‘weight does not exceed 15 kg. “The supplier shall indicate the delivery time versus quentties of each type cof meter and his production capacity. Where test and / or calibration cetifiates/ reports are issued by a laboratory other than the International / National Standards and Testing ‘Authority, a copy of accreditation certificate, under ISO/IEC 17026 from the International! National meter carlifeation body shall be attached together with the tender documents. The manufacturer shall provide current e-mail dresses, fax and {lepnone numbers af the national / international testing 1 callration laboratories and meter certifiation bodies, The test certificates shall beat the product serial number of meter on offer. ager Appendices ‘Appendix A: Summary of Technical Data, ‘essurement and Control Unlt- General information ee ‘Sigle phat, 2-wve, dei cornaced prepayman melee “Compatible nator ‘Single phate wee, ered patel (elcteal ratings esse Ti Cis TES @2059-77) ‘Vatiage measurement (U,) | 220V,SoRz avd ling veoge ge | O5Us@ 16, Vatage cies birder Is Ward OVA ‘Careri icuibuen EAS VA Bivens caret ‘Caren measuremant RSA mB WA, ~ Prolctve ee ‘Cae obi auto [TCU enetosure [Moning] al mouring, wth skin ip core wii 35 ri OW sindardra_| Raina TPS, slabs fer altaion Wa pal tp coor Woe Rousing Malet ‘UV aaa potyearboraie/ABS bend wi Tare retardant Resistance tohest ond fre | As per I 60605-2-1 (gow:ia) Resistance tospreadot re | UL9¢VO rate @ 1m Terminal Tipe Waving cage erat Mateal Mia stetnickeirass Mavimum Cable Size 10 mnt | Operating environment ‘Rr of eppeaton Tra ‘Operaing lerperature range | 1° ASC Storage lomperaturerange | -10°Cw35°C Resive huniy ‘axnum S0%, annua mean TE Operation ‘General ‘Crea ioe wih decrement once ‘redt ety mechanism | Keyped, eneryped nonerc tokens Great eneypion method ‘etrlogieal performance ‘easurerent drecion ‘Consumption nestor Satu indieabon Tigi Cyst Bplay (LCD) | 8 igi + Tene en formation. numer Woman ‘ecarae metering ange | 08 1 LP ‘SireDinralieyphos PLC propaymentmtarpeasAprizoIs Sg Sig are oor | Short art earaat 3, Disconnection Device a ‘neation ‘syster] Protective class casieston eee 444 me fort mite [over vakagewahsana | a0 VAC Tora our ‘Sage iy Votoge mpuse witstans | ig exes of kV, 1.2045 (IEC 620521) Curent witont | oy ‘Beatonagnel copa Eectosiccechage | 15kV air ascage Immunity to HF ees | 50M 2 Ge @ 10Vinwthloa 0 Met 2 Ge @ 30Vim wo ead Inriy to FT aw Radio itrtererce | Comples wih requirements for CISPR 22 Specteaton Comptance | IEC 61000~+2: IEC 6000-49; IEC 6100044; EC 61000446 CISPR 22 oe —_— Tipe re Pek Voge OXY (1.25045 wee Ratedimouise Vatane | (According to IEC 205-1 protec I) Ven (1 Mint) Inalaion properties (Gecodng 6 EC 6205211 poten css ‘Canmancaton Dance |e Tomes ‘or Interface Ul ‘Tipe mS ‘orang Range (Cam) | Soave ‘Operating Environment parsing Temperate 10°C ATE ‘Straps Tamperature Range | -10"C1035°C Rebtve Fury x UU Enclosure (Tie War monried Rate [Seating "ple Dinrls/phse PLC prepayment meter ape ApaOIS ig Matra ‘WV sible payerbonala/ABS bend wih Wane riarant tabare Fairy sale, ro wea svioabla pats Type Taguegenpert ‘Gomponis ilogrphiaNumeie LCD dap, Keypad, LED rate a eansuiion ‘neato, ss eecback ii Cate isla LCD] | At eae! 7 eg + 1 ns Tn Tlamaton: num woman pay ‘Size vais meterinforaton suchas cet ves, token entry, ee Reina “key, nlenaonal andar ayo ncudng“rormaton and ackspace! hays ‘Danzer Feedback on key poss, Token Accept and Rect melds, Bw-ceat Ta ering Binge CED) | arma sa ‘Rate of consumption inate (ple rate ropeianal io cranial conan “Spe in ral sphase PLC prepyment mtr specs AprT OTS Tapert ‘Appendix B: Specifications Matrix or Split Propayment Static Meters for active Energy - Guaranteed Technical Particulars (GTP) (cua claiming what oh Tee Sim au Paine ere, eae aa eagle oe es it acer crema es eemcieerceatnreed ne Leese Reema aa UTP yh no og a cal aa IS 236 fenuonfainnaoos tn ag poses erg ssaonte von ee SE oe OTE pastnnnananrne 23 fee “Sle inral/phase PLE propane meter ipec= Ap ZOIS Foals REIT ay PRACT ih oe eR finden eeeted snvaamections hea a 2280 cea anes 32 tr fee aor peta ee Eo aa [rey en el tea Ra fiesta Ray is Daa ree iy vgn nen poss ee 2222 Pine wot naatelesina 42 a, [Saaremaa SRT rato eps Ssaedn PUREST 2228 ee ime sass across cao cecal ‘Spit on ralsfpase PLC preparer eer specs Apr 2015 Tonle fait — fcres ree 8, OH TT oY hoz Pah aR RR OTT RT pra 57 -shaadaeliealatia SC enht 0 -hchyrtg Payer soe [promos ne watt pessoas STC re a eer wren compan 52 ope Llp bapes le ees Sania seers oe cag nas ame EARS Shee ae ee alts po eu beh home Le Pepmszesermenan cette ncn te arco Jos ste ance resume ‘Seon ralefphre Puc prepayment eter spe Apr 2015 Tage Manufacturer's Declaration: | on behalf of oclare that the above specifications matrix conforins to a typical tender meter, {ype . being offered ‘or tis tender. Signature & Stamp “Spee ral space PC prepayment nea seer ADT ZOIS Teoee THE KENYA POWER & LIGHTING COMPANY LIMITED SPECIFICATION for ‘THREE-PHASE SPLIT PREPAYMENT BS MOUNTING STATIC WATT-HOUR METERS FOR ACTIVE ENERGY (Using cable as a medium of communication between MCU and uw) NAME DESIGNATION ‘SIGNATURE | DATE Compiled by | Patcia Ngaanga "A Engineer, MCL $h-04-3015 Peter Wanyonyi TA. Installations Management ee ais Checked Eng. Margaret Chief Engineer, OSM & = | Kanini Metering solutions [qr one Recommended | Agrey Vachasio Ag. Manager EneGy Manager by ement Nein | ely if ‘proved by | Joshua Waa | General Manager t Customer Semmes | yeh, a I FAS REVISION RECORD "REVISION | DESCRIPTION OF REVISION | DATE 0. Tssue ‘Datnhar 2070 7 Tssue, inclusion oflauses | August 2074. 4247, 421.21, 421.23, 421.27. 459, z “6 issue ~ ammendiments- | Apal 2075 421.7, 421.10, 424.12, 421.29, 4224.11, 42224, 432459858 S85 Mereg State payment Mle ed common soa THE KENYA POWER & LIGHTING COMPANY LIMITED SPECIFICATION for ‘THREE-PHASE SPLIT PREPAYMENT BS MOUNTING STATIC WATT-HOUR METERS FOR ACTIVE ENERGY (Using PLC link as a medium of communication between MCU and NAME uw) DESIGNATION ‘SIGNATURE | DATE ‘Compiled by | Paiticia Ngaanga ie | |uou-sai5 [Peter Wanyonyi T7AE. installations ier [Se wowons Checked Eng. Margaret | Chief Engineer, DSM & - Kanini ‘Metering solutions: VL OF Q0ue sear Re EF by Management Nain | te foul ‘Approved by | Joshua Mutua General Manager, Customer Service ' tes REVISION RECORD [REVISION | DESCRIPTION OF REVISION | DATE 0 [4 Issue (Octobar 2070 1 ‘issue, inclusion ofclauses | August 2014. 421.7, 421.21, 421.23, 4.21.27. 4.59. Zz issue- Ammendiments— “April 2015 4 clauses - 4.2.1.8, 4.2.1.9, 421.11, 421.28, 43.2, 433, Stes tewtng space papaymert ars -nrsese PLC communion Ap 205 Paget 18 ‘Table of Contents FOREWORD ronnie 44 Oparating condiions requtemen’.. 4 42 Desig and construction requrement 5 424 General... ~ 5 422 Functionality... - 7 43 Elects requirements... - 5 44 Accuracy requcement... = 3 45 Instuectons and Marking. “- 10 {INFORMATION AND WARRANTY (IV CASE OF TENDER AWARO) nnn ARN mci ‘Appandtc A: Summary of Technical Data 4 Append Bia a6 Speciscatons Mari: for Troe phase Spt Prepayment State Meters for active Energy (Using PLC Torcemmunicaton batween MCU and UN) = Guaranteed Technical Partculers (GTP).16 BB Mong Shee prepay in -vilnsPLE communion ABB ZOI5 Papel 18 Foreword ‘This specification lays down requirements for three-phase split prepayment wall ‘mounting meters fer active energy, where the communication between MCU and UIU is by means of PLC cable. The specification is intended for procurement of ‘equipment and does not include provision of contract, Introduction ‘This specification was prepared to establish and promote uniform requirements {or three-phase spit prepayment meters for active energy to be used at Kenya Power and Lighting Company Ltd. The specication lays down the minimum requitements for ecuipment acceptable for evaluation. ‘Tho manufacturer shall stipulate any extra and enhanced features above the requirements ofthis specification This specification is in two parts, one is a narrative clause-by-clause and the other is a summarized table of the same clauses located in the specifications and marked as Appendic B. Tenderers shall complete the schedule in Appendix B and this shall form the ‘basis forthe technical evaluation of their tender. (See clause 4.5.8). Appendix A is a snapshot of the technical deta and tenderers shall indicate conformance of ‘sate any deviation from these requrements, 4. Scope ‘This specification apples tc newly manufactured, three-phase split DIN rail mounting static watt-hour prepayment meters for direct connection, for measurement of altematiny current electrical energy consumption at a nominal frequency of 60 Hz. The method of credit transfer shall be through fencrypted numeric tokens complying with the 20-digit STS encryption algorithms. ‘The meters shall include @ load switch for the purpose of interruption or restoration of the electrciy, supply to the load in accordance with the Current value of the available cract maintained in the prepayment moter, “The Measurement and Contol Unit (MCU) shall be separated from the User Interface Unit (UIL) and method of communication between them shall be by PLC communication link aver a radius of not less than 100 metres. po t01s Papeaette 2. References ‘The following documents were referred to during the preparation of this ‘specification; in case of confict, the requirements ofthis specification take precedence. [1] {EC 62055-31:2005 Electricity metering - Payment systems - Part 31: Particular requirements ~ Static payment meters for active energy (classes 1 and 2). [2] 1€C 62052-11:2008, Electricity Metering equipment (a.c.) - General Requirements, Tests and Test Conditions- PART 11: Metering ‘equipment [3] IEC _62053-21:2003, Electricity metering equipment (ac) — Particular Requirements - Part 21: State meters for active energy (class 1.0) [4] GANS1524-1:2004 Electricity prepayment Systems, Part 1 Prepayment meters The definitions given in [1], 2], and f4] shall apply. MCU: Measurement & Control Unit IU: _User Interface Unit 4. Requirements Prepayment meters shall comply with the requirements of [1] and [3] for ‘outdoor meters. The prepayment meters shall be mounted as for normal sence, 4.4. Operating conditions requirements 4.1.1 The meters shall be suitable for operation in tropical climate where temperatures may vary from ~1 to + 45 degrees Celsius, 4.4.2 Average Annual Relative humidity reaching 90% and alttude of up to 2,200. 4.4.3 The meters shall be used for measurement of active energy for Light ‘commercial and industrial loads under tropical climate conditions. SeRES Mating pte pepmymest Meee —winkssPLC commune Ash OHE Pape dt 8 42 Design and construction requirements 424. General 42.1.4 The requirements given in {1} shall apply. The product serial number {or particular meter being tendered shall be Indicated. 421.2 The meters shall be of British Standard (BS) 5685 footprint for standardised mounting. 42.1.3 The MCU and UIU shall communicate over a PLC link for a distance of not less than 100 meters. 42.1.4 The meters shall have terminals with bottom entry for cables and the arrangement shall be: Ltn: LYou L2in: L2ou L3iq! L3 yu? NN 421.5 The meter terminal cover shall be of short length type, flush to the meter base. 424.6 The MCU body shall be ultrasonically sealed for life and there should be no serews on the MCU body except forthe terminatin of cables, 42.4.7 The MCU shall be sealed and its printed circuit boards conformal 4218 4219 42.41.10 424.41 42492 42443 424.14 424.15 9108s Span peeymenhers— ess UConn coated in a manner s0 as not to allow malfunction due to ingress of ‘The meters terminal holes and screws shall be made of brass or ‘ickel plated brass for high conductivity and corrosion resistance, Terminal holes shall be of sufficient size to accommodate the cables of atleast 10-mm diameter and allow a minimum 18mm length of stripped cable fo frm grip, ‘The meter’s terminal cover screw inserts shall be sealable with utity wire seals, ‘The MCU dimensions shall not exceed: Height = 240 mm; Width = 172 ‘mm; and Depth = 73 mm. Terminal cover shall not be more than 113mm flash fype ‘The meters protection class shall be class I! (Double insulate), The meters shall have a non-volatile memory capable of data storage and with long-term data retention period for a period of rot less than 10 years or for the certified life of the meter or whichever is greater ‘without an electrical supply being supplied to the meter. ‘The MCU shall have a backlight LED display for eisplayng parameters such as time/date, remaining credit, tolal unit consumed, instrumentation parameters. ‘The meters shall have register codes to indicate information functions like instantaneous power, Curent cecit register, Power fall counter, Last credit token number, Value of last credit foken, ele These values shall be available onthe UIU display. 2015 Payee 42.1.18 The principal unt for the measured values shall be the Klowat hour «ewe, 42.7 The meter shall have 8 means of reading the ccedt register to within resolition of at leas 0.1 kivh fr testing purposes 421.48 The meter shal have terminal cover open detection. Once the terminal covers opened, the load shal be disconnected 42.1481 ThelMCU shall be supplied with loading switch in open rade and instal can open terminal cover when MCU fe net activated by commissioning code (token) 42.1.182 After instalation of MCU, the instler vil Input a commission code (oken) fo close the loading switch and activate terminal cover open Setectton function 421.48. After commissioning token input into the MCU and foading swith Closes, opening ol the terminal cover wilee fo tamper. When MCU hiss power and terminal cover fs opened, MCU. wil disconnect immediately," When MCU has no power ‘and teminal cover fe opened, MCU wil detect and recotd the event and tisconnect immediately power resumes. 42.41.19 The meters shall be equipped with tamper sensors that shal automaticaly disconnect the power to the load in the ‘event of tempering 424.20 The meters shal detect signicant reverse energy (SRE) when the tne and load wires are swapped, 42.121 The meters shall continue to operate correctly and decrement creditor tripduring SRE detection 424.22 The meters shalbe scalable’ upgradable to smart prepayment meters via use of software. This shall be done by programming via the optical port 42.120 The meters shall have LED indicators for esting and indlation of Wy consumption 421.24 The meters shall work under postpaid mode or prepaid mode. The bwich of mode shallbe done via taken or optical communicaben 42125 The meters shall have an optical communication por, compliant to 1E602066-21 for accessing information stored inside the meter trough ‘hand held uit 424126 The meter shall be compliant with DLMSICOSEM communication proiocol 42.127 The meters shall be supplied together wit three copies of sofware for interogating the meter data: and shal not be possible fo reprogram the meters using this software. esPLEcmnaniatns A205 Paget 4.2.1.28 The meters shall support two way communication 4.2.1.29 The MCU shall conform to the degree of protection IP 54 as given in lec 529 422 Functionality 42.2.1 Measurement and Control Unit (MCU) 42214 4221.2 42213 42214 42218 42216 42247 42218 42219 4224.10 422441 The MCU shall have @ load switch to automatically interrupt the load circuit on the expiry of credit balance, ‘The load switch shall automatically restore the load circuit ‘The meter load switch shall comply with the requirements given in tt The meters shall be able to indi continuous power. ‘The meters shall disconnect the load if power failure is detected and connect the load after normalization. “The meters shall have a programmable power limit setting that shall disconnect the load once exceeded and recennect once the load falls below the set lit, ‘The MCU shall have a diagnostic LED to indicate the presence of ‘communication between the MCU and the UIU. ‘The MCU shall continue metering and decrement credit, regardless ofthe state of the communications interface or the UIU. ‘The MICU shall come fitted with an SCSSCAAAS (MC171) compliant data port for programming and interrogating the meter. Two (2) sets of data interrogating and programming probes and software (1 each for optical and SCSSCAAAS ports) shall be provided with the meter sample for evaluation. For the winning bidders, each delivery of 100,000 meters shall have 100 sets of probes and software for use with the optical and the SCSSCAAAS ports ‘The MCU shall be supplied together with a plastic card of dimension 85mm X 54 (length X height) mm and material similar to that of Credit card indicating the meter number. ‘The MCU shall come preloaded with 0 (zero) Kin, te absence oF presence of User Interface Unit (UIU) ‘The UIU shall comply with 20-digt (STS) encryption algorithms. All correctly entered tokens shall be registered to eliminate fraud ‘The UIU's keypad shall be user friendly with @ LCD display for hhumeric credit display and a language independent pictograms to ‘Sp ouey aphae papayas hte eer PLC commana ABE PayPal Identified operational features. The height of the display characters for the numeric values shall not be less than 4.5 mm, 42223 The UIU display shall have at least seven 7-numerical characters, 42224 42225 42226 comprising of five integers and two decimals. “The UIU shail conform to the degree of protection IP 51 as given in lec 520. ‘The UIU shall be capable of communicating to the MCU via PLC link over a distance of not les than 100 metres, ‘The UIU shall be an interchangeable unit and it shall be possible to view the mated MCU on the UIU. 42227 The UIU shall enable loading the meter with a number of pre- purchased units of credit, without loss of any existing credit balance. 42228 The UIU shall, upon acceptance of a valid token credit the exact 42229 amount contained on the token to the appropriate register in the ‘meter and shall increment the register by this amount ‘The UIU shall transfer the crit in kWh. 42.22.10 The UIU shall display the cumulative kilowalt-hour register. 4.22.2.11. The UIU shall have a means to remove digits from a partially entered umber sequence-Backspace key, 4222.12 The UIU shall have the ability to recall the last five successful credit tokens entered, 422213. The UIU shall be able to indicate the meter software, 4222.14 The UIU shall indicate the status of the incoming supply. 4222.18 The UIV shall indicate the credit status 4222.16 The UIU shall indicate token acceptance or rejection 42.22.17 The UIU shal give low eredit warning 42.22.18 The UIU shall have a backlight to enable keying of tokens in the dark. 42.22.19 The UIU mounting shal be wall mountable cradle (handheld), 43 43a 432 433 2.08 Moy Spa Electrical requirements ‘The meters shall be operated from mains with reference values of 3x230V/400V, 50 Hz, with a load switching voltage operating range from 0.5U, t0 1.15Us, ‘The load switch shail interrupt the supply when the voltage is below 0.4 Unand above 1.15U ‘The load switch should not interrupt supply if only two (2) or one (1) phase(s) voltage is/are at 0 V. visio PLE wnnanatn Ag 2008 Pape 19 43.4 The load switch shall automatically restore supply within a minute when the voltage falls within 0.4 ~ 1.15 Us, 43.5 The meters shall be connectable for 3 phase 4 wire systems, drawing of \wiich shall be printed on the meter body. 43.6 The meter shall have reference standard currents of - Ios 10, Imax2 100A, 4.3.7 Power consumption The requirement of [3] applies. 43.8 Influence of short-time over-currents ‘The requirement of [3] applies 43.8 Influence of se¥-heating ‘The requirement of [3] applies, 43.10 Overvoliage ‘The requirement of [3] apples, 43.11 Insulation test The requirement of [3] applies 4342 EMC tests ‘The requirement of [3] applies. Requirements 4.3.7 to 4.3.12 shall form part of the type test approval to be issued by an international or the national (of the country of manufacture)) ‘meter certifying body. 44 Accuracy requirements aaa 442 443 444 448 4A8 Tests and test conditions given in {1} shall apply. ‘Tho meter’s accuracy shall be of class 1 for active enargy. Limits of errors due to variation of the current The requirement of [3] apples. Limits of enor due to influence quantities ‘The requirement of [3} applies. ‘Test of starting and no-ioad condition ‘The requirement of [3] applies. Meter constant ‘The requirement of [3] applies. ‘Accuracy test conditions ‘S05 Mouig3ptae papa Mars wes PLCcmmuncan ApS Pape Bal “The requirement of [3] applies. Requirements of clause 4.4 shall form part of the type test approval to be issued by an international or the national (of country of manufacture) meter certifying body. 45 Instructions and Marking 45.1 General ‘The requirements given in [1] shall apply. The information shall be in legible English, indelibly marked on the meter and of at least 4mm figure height, 4.52 Specific marking requirements ‘The following information shall be marked on each meter. 8) The standard transfer specification (STS) compliant serial number, in the preferred format known as a national mete" number, b) The STS compliance logo, The inscription “Property of KP. & L. Co Lid", 4) ‘Bar Coded information without blank spaces 4.5.3 The following drawings and information shall be required with the tender: 2). Meter drawing giving all the relevant dimensions; b) Wiring diagrams; ©) Description leaflet of the meter being offered; 4) Users and operational manuals 454 A-sample ofthe meter offered shall be submitted together with test tokens ‘or; different Power Limit Settings and resets for the same, Credit and Clear Credit Tokens to aid in the testing ofthe meters. The manufacturer ‘might be required to provide more tokens at no extra cost 4.55 Copies of type approval certificate (s) with test and calibration results of the meter being offered obtained from an international or the national ‘meter certification body shall be provided. If type agproval certificate(s) is. (ate) from accredited meter certification laboratories (and not national or international body), then it (they) shall be accomoanied with copies of Certificates of accreditation, under ISO/IEC 17025 from the national or an Intemational certification body. 4.88 The Tenderer shall complete clearly, all the clauses in both columns of the schedule in Appendix B. This shall form the basis of evaluation of the submitted tender. Faliure to complete this appsndix shall render the tender non-responsive. The tenderers shall indicate the details of their Coffer where itis different from these requirements. Where the requirement is the same, they shall indicate what is offered, Insertions such as SORES Mouny Soha papayas —wreessFLCconmuncmar Age 2005 Page 0218 “noted”, “agreed” etc. shall be considered as non-responsive where ‘specific response is called fo 4.8.7 The manufacturer shail provide proof of conformance to ISO 9001(2008) ‘standards by attaching copy certificates. 4.8.8 The manufacturer shall provide a list of at least four previous ules to Which the meter being offered has been supplied 4.5.9 The manufacturer should have supplied at least 5,000 pieces ofthe meter type offered to similar utilities. 4.5.10 Copies of DLMSICOSEM certificates tobe supplied by tenderer 4.5.11 The manufacturer shall produce meters that meets fully the requirements of the IEC standard, IEC 62055-51:2007 - Electricity metering - Payment ‘systems Part 51: Standard transfer specifications and hence Facilitates interoperability amongst hardware, coftware and meters supplied by other manufacturers + Does not lock KPLC tothe bidder or any one supplier or manufacturer ints future procurement of prepayment meters, software or hardware SBR ES MounigSohsepapayner Mews PLC cmmanaten —ApA18 Pap iol 5A 52 53 54 55 56 Information and Warranty (In case of Tender award) Drawings and technical detais shall be submited to KPLC for approval betore manufacture of ts meters commons, KPLC undertakes to submit their comments or approval forthe drawings within tee weeks of receiving the draft copies. “The meler shall have a warranty against any defects, which may develop ‘ive to fauly material, calbraton, tansportalion or werkmanship Tor s period of eighteen months from the date of delivery. All defective meters Shallbe replaced ate suppliers cost KPLC shall meot the ful cate of two engineers for meter inspection and ‘acceptance testing at the manufacture’ fact Samples (@) The lenderer shall submit one MCU and two (2) UIU samples together wih the tender documents, The submited meter samples shall be ‘bjected To accuracy tests at KPLC's Meter Cental Laboratory (0 ‘ely th requirements of EC 62055-24:2003 Clause 61 and to very responsiveness to oer clauses ofthis specifeaion, Sample meters ‘shal not be returned to the tenderers (0) Bidders are advised that the Laws of Kenya require that the Kenya Bureau of Standards must approve any new meter being inoduced in the county. To this end Biers shall furish the Bureau wih 4 (our) samples of each meter type to be supplied, Bids submited without the meter type approval from the Bureau will NOT be considered non- responsive. However the winning Bidder must submit ths approval Before the signin of the supply contract. Bidders may communicate 100 meres ‘User interface Unit “Type Tsai, ron poland, “Operaing Range (Gam) |= 10 ees ‘Operating Environment ‘Operating Tenperaiud—-10°CwH"C ‘Siorage Temperature Range | -10°Cw935°C Relatve Humidity 7 Enclosure Type ‘Sieine, wall mated [Rag Pa Water LW sible pajearbonat/ABS Gland wih Ware retardant Sealing tony sea, no user sarvcuabe paris ‘S085 Moning phase prepsyme Nl —Wieess PLC conmuncson ANAS Page tS 18 Tee Tanguage-iependant “Conpanen PicogrephiaNumris (CO dpi, Keyped, CED Tale of consump Irena, su oedback ‘iid CrysaT Diapay (UC) | Bigs + 11 eons: con inlarmaton,nunare Wiomon aay varus Sue ‘eer niormation auch se coat loves, ken any ele Keypad TZxey, lemaional slandard yout Techdng “Woraton” an “ackspace’ Keys [Bazer au Teecback on Wy pres, Token Recep and Reject melodies, Tow] ‘ed alms as 2 factory progianmabe pon Ui ees Bde LED) |e of ensnpian er ube ie BRST Os eansunpton Appendix B: Specifications Matrix for Throe phase Split Prepayment Static Meters for active Energy (Using PLC for communication between MCU and UIU) - Guaranteed Technical Particulars (GTP) 2 — [rosin So ae OT SOT [Regeene CT Te ge w cE pers al be bas Sas ES SS RST S214 — fies sa hy wesc on oy SS CES [feat tet ao et gh Ra FT i ho oa RR TE We iS emperor wan ELM [INgCU deo st ns oad ROE SOT = "arr enh Fe a a ‘anethatine Eta Rebsesey ais Pu resus ant a e298 Page st Zt Penosnead now ape tas ste connonenonsot Prat ubconesrser 212) [te none he be aoa pela wi Se ngs Seragony om eo mata [i531 — onsen Cons oan ED, Bec oan sours poten oc a eo aT ETT starsat nang eine aa ASU wi GAR 221 [ovinged nancies en igeSa BRE te UU tens he Spe FIGS TTT TEES [OD capri wa ROT PICT Fens fovesatslogusr wat a fezeri fou reeamng ose er ube 2 aay eat ae TOT [buns omesnee esr ELI [he Osa oe BORTE oa To TTD EET the UU RS STEN RSE ce RE SLES Moun Sphaseprapaye hws — wes PLC emmunen rosi0i5 Pagera19 a SS a f= TaN raw TH REBT OB SOT st vege #0 *4 Ifrewectentne ctagetirnimndastisu. ong stan st pd on hey ftom amen z AL OE Pcs ce 100 po wo Feces Stan vey eer "Pare i IY a Tier oe onarp kr specs of eghieen mart fm he de sry Mace in Sr npr Ia = oS fsa Sanayi ns TORS TNT . insect ech Sone Todt ton ‘ee eacnne’ Nl” ae ‘Manufacturer's Declaration: | behalf of ‘specifications matrix conforms to a typical being offered for this tender. Signature & Stamp ‘LBS Mowing Sphase prepay ars woes PLC communion declare that the above tender meter, type ems Page t9ot8 ‘THE KENYA POWER AND LIGHTING CO, LTD. SPECIFICATION For WHOLE CURRENT (DIRECT CONNECTED) STATIC METERS FOR ACTIVE ENERGY. for use on ‘SMALL COMMERCIAL AND LIGHT INDUSTRIAL INSTALLATIONS aE DESIGNATION SIGNATURE [DATE COmBTGSY | Paticia Ngaanga 7" Asalant Engnesr Meter Cental taberatny 02-04-2916 Feler Wanyonyi — | assistant Engineer, 1 Energy Management eee Creekady | Fay Wasiase A vanoge, ea Management La ins HAZatinn | 021 ry hic ‘proved — | Jshua Vue | Ganaral anager, Q GustomerSevie | Zysode a a ahefs REVISION RECORD FEVISION [DESCRIPTION OF REVISION DATE e 7 Issue April 2005, El Tissue May 2008 Sq [ese way 2008 esse nian 2070 [er Tissue ‘October 2010. @ |? issue-Caosos 4254225, AZM, KET BT | Fob 2015 sia sise5%e ce cm eer at ny ater Paonseret WHOLE CURRENT (DIRECT CONNECTED) STATIC METERS FOR ACTIVE ENERGY FOR USE ON SMALL COMMERCIAL AND LIGHT INDUSTRIAL INSTALLATIONS. CONTENTS Foreword Introduction 1 Scope 2. Normative references 3. Terms and definitions 4 Requirements, 4.4 Operating conditions, 4.2Design and construction 4.3Electrical 4AAccuracy 4.Sinstruction and markings 5. Information and Warranty (In case of Tender Award) Appencix A Appencix 8 ‘Appencix ¢ Appanelx D ‘Wl cad occ la gr ir te gy age 20417 Foreword ‘This specification lays down requirements for newly manufactured whole curren: (Direct connected) static meters for active energy. The specification Is intended for procurement of ‘equipment and does not include provision of contract Introduction ‘This specication was prepared to establish and promote uniform requirements for meters. It lays down the minimum requirements for equipment acceptable for evaluation. It is the responsibility of the Manufacturer to familiarize himself with the standards referred herein. ‘The specication is in two pars, one is a narrative clause-by-clause and the other is @ ‘summarized table of the same clauses located in the specications and marked as Appendix . Tenderers shall complete the schedule in Appendix C and this shall form the basis for the technical evaluation of their tender. (See clause 4.55). ‘Appendix A is a snapshot of the technical data and tenderers shall indicate conformance or state any deviation from these requirements, Appendix B provides basic and extended list of EDIS codes 4. Scope This specification is for newly manufactured whole current (Direct connected) static ‘meters for measurement of altemating current active energy in 50 Hz networks. 2. References ‘The following documents were referred to during the preparation of this specification in case of conflict, the requirements of this specification take precedence. [IEC 62052-11:2003, Electricity Metering equipment (a.c.) ~ General Requirements, ‘Tests and Test Conditions- PART 11: Metering equipment [2] IEC 62058-21:2003, Electricity metering equipment (a.c.)~ Particular Requirements - Part 21: Static meters for active energy (cless 1.0). el amet (ecm tt ory ret ate ay Pasa [5] IEC 62053.23:2003, Electricity Metering equipment (a.c.) ~ Particular Requirements. Part 23: Static meters for reactive energy (classes 2 and 3) 3. Terms and definitions. ‘The defintions given in IEC 62052-11:2003 apply. 4. Requirements In addition ‘0 the requirements In IEC 62052-11:2003 and IEC 62053-21:2003, the ‘meters shal full the following requirements. 4.4 Operating Conditions requirements 4.44 The meters shall be suilable for operation in tropical climate where temperatures may vary from 1 to 48 degrees Celsius 4.1.2. Average Annual Relative humidity reaching 90 % and attude of up to 2,200m. 4.1.3. The meters shal be used for measurement of active energy for small commercial and light industria loads under tropical clmate conditions. 42 Design and Construction requirements 4.2.4. The requirements given in 5.1 to 5.11 of 21] shall apply. 4.2.2. The meters thall be constructed as 3 phase 4wire meters. 4.23 The meters shall have terminals with bottom entry for cables and the arrangement shall bbe LaLa: Late: Labs: NN. 4.2.4 The meters front cover may be of translucent material but s glass or polycarbonate) for reading the display and for observation. 4.2.5. The meters chall conform to the degree of protection IP 64 as given in IEC 605291989 Degrees of protection provided by enclosures (IP Code) Amendment 1:1999 4.2.6 The meters shall be of British Standard (BS) 5685-foot print for standardized mounting {or asymmetical (BS) wiring 4.2.7 The meters shall be for front projection mounting. 4.2.8 The meters shall have seating provisions for the meter body, meter cover and terminal ‘cover and Raset button if the button is outside meter cover. If back-up battery is such iI have @ window (clear ok evan econ ale ee ates ect a Poet ‘connected that its replacement does not require opening meter cover, then provision be: provided for sealing the battery cover. 42.9 The meters shall be equipped with lockable / sealable push buttons where suck buttons. are used to change some meter parameters. 4.2.10 The meer terminal cover shal be ofthe long type with cable entry knock-off 4.2.11 The meter potential links shall be inside the meter body and CAN ONLY be accessed by opening meter body cover. 4.2.12 Terminal holes shall be of sufficient size to sccommodate the cables of at least 10mm. diameter. 4.2.43 The meters terminal holes and screws shall be made of brass or nickel-plated brass for high strength and good conductivity. 42.14 The meters shall have LED indicators for testing and indication of KWh and kvarh- ‘measurement. 4.2.18 The meters shall be equipped with auxiliary terminals for inputs and outputs signals. 4.2.16 The meters shall have a realtime clock controlled by a quartz crystal osciliato. It shall be possible to reset the clock without oss of biling data, 4.2.47 The meters shall have @ back up power supply o run the calendar clock for @ minimum, ‘of 1 year without mains voltage. If the back up is by means of Lithium baltery it shall, have a shelf Ife of ten years. 4.2.18 The meters shall have a non-volatile memory capable of data storage and wih long- term data retention for the certified life of the meter or 1 years, whichever is greater ‘without an electrical supply being supplied to the meter. 4.2.19 The meters principal uni for the measured values shall be the klowat-hour (kWh), 4.2.20 The met shall be capable of measuring maximum demand in kVA and kW. 4.2.21 The meters shall measure Energy and Demand correctly even when the phase rotation'sequence is incorrect. 4.2.22 The meier shall have atleast 3 registers for energy. -4.2.23The meiers shall have at least 2 registers for demand, 4.2.24 The melers shail be able to measure energy in forward register when in securiyraversed) mode ns ane ec crmace ae onary nl rai rey Paoe sets? 4.2.25 Meters shall have a facility to incicate reverse connection and also record reversed units 4.2.26 The meters shall have a capabilly of closing end of billing period on any selected date ofthe month selectable by software. 4.2.27 The meter's billing registers shall NOT be re-settable to zero readings. 4.2.28 The meters shall have atleast twelve billing historical data stored in memory and retrievable by software The current bling and historical data shal be avallable on meter cisplay for reading and bling purposes. 4.2.29 The stored data in the memory shall be retrievable even when the display ofthe meter ‘goes blank. 4.2.30 The meters shall have a backlight Liquid Crystal Display (LCD). 4.2.31 The meter LCD shall have at least seven (7}numerical characters comprising of ‘Selectable integers and NO decimals points for measurement. 4.2.32 The maters LCD shall have at least 4 digit ID codes that are EDIS compliant (see ‘eppendi B). 4.2.33 The LCD display shall operate in at least two modes, namely, basic and extended data list cieplay. 4.2.34Meters shall have provision for reading the meter at site even when mains power ‘supply tals. 42.35The meters shall also be capable of displaying the instrumentation dete namely Instantaneous phase voltages and currents, phase angles (voltage and currents) et 42.36 The meters shall be capable of continuous display of the presence or absence of Individuat phase voltages. 4.2.37 The mesers shall be capable of event recording which shall include but not be limited to: 41) Power ups and power downs with date and time stamp; 2) Individual Phase failure, with date and time stamps; 3) Over and under voltages based on a pre-set threshold with date & time stamp: 4) Battery voltage status; 5) Memory status; 6) Meter Errors, 7) Date and time of last programmingiparameterization; ‘nc cum et come se ory mets ste eany Poxsartt

You might also like