You are on page 1of 3
USN t Fourth Semester B.Arch. Degree Examination, June/July 2019 Specification, Quantity area ing of Buildings Time: 3 hrs. XY Max. Marks: 100 Note: Answer any FIVE full questions, ey ONE full aesongo cack module, dule=t . 1 ‘Answer the following: Ay a. Write briefly on cubic rate oe meter method. of estimate (03 Marks) b. Write briefly on typical Bay method of estimate. @ ©. Which approximate met)iqd/Festimate is used to cen cost of proposed schoo! and factory building? (Marks) 4. Rs-20,00,000 is spe construct 125 sqmt“ep office building in ground floor with evaluator and/or equations writen ep, 42+8~ 50, will be treated as malpractice 3 s-5,50,000 spent tofvards foundation cost. It is decided to built an addition of 6Osqmt on 2 the first floor dain the same period with its height between floor to top of roof being 3mt 2 ')Caleulate,cbSt per sqmt ofthe constFuetion in the ground floor. (04 Marks) i i) Calouate cost per cumt ofthe constetion in the ftst floor. (os Marks) 5 S oR > 22 2 AnswePthe following: S > 2 Write brief specification for item*Earthwork in on for foundation trenches in Hard i oi C fear z Write 5 sources of infoy for writing spegiiéation y) (07 Marks) e &. Menton avanases aid dsadvaningesGfgpen spin, (07 Maris) £ G ai © BI Refer Fig.Q.3@nd write measure! LBD format se)and evaluate the quantity ofthe & following item of works: pect OD ~~ (oestrt iii) roofslab Ss 7 (03 Marks) jv) Ceiling plaster in ~ (03 Marks) ® ) Internal wall plastetyin CM1:6. re (05 Marks) Ree 76 Set ot five. ein eorela TA. sem 15ENG/ARC4.6 on > ‘Answer the following: “ A) a, List any four material testing equipments to be kept i ‘if ke (04 Marks) . List any two test each to be conducted on the following materials: ) Cement i) Bricks i) Concrete iv) Coarse Aggregates. eo (08 Marks) ¢. List out any 8 safety measures to be followed during a multstory building construction. (08 Marks) rz moans a a ‘Answer the following: ‘ ‘a. Workout from the first principles, réte'analysis for RCC roof slab'l (12 Marks) b. Name the two different types of overheads with 3 examples for each. (04 Marks) ©. Explain: i) Profit ii) Tools and plants. 4) (04 Marks) c% oR ° ‘Answer the following: ) a. Write difference ‘schedule of rates and start rates (04 Marks) 'b. Mention four fact6ps,Because of which rate vary (04 Marks) c. Explain basic (03 Marks) d. A tender has a,qubte for wooden amend of 2 Cuff Sal Wood. It is decided to replace Sal Woodith Teak Wood, Basic sal Wood Rs.28000 per cumt and the price of pe is Rs.1,25,000. If the contractor is allowed consideration only on difference in pricd.oF Wood and nothing else, what is additional amon! the contractor is entitled for? ~ (09 Marks) he NY i: Arroof slab of size

You might also like