0% found this document useful (0 votes)
272 views7 pages

Denr Permit

Uploaded by

barriodelimanila
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
272 views7 pages

Denr Permit

Uploaded by

barriodelimanila
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
VERDANT PASTURES MINING INTERNATIONAL I ‘COMPANY REG. NO.: 5200712728 COMPANY TIN: 006-81: ‘CONTACT NO.: GLOBE: 0977-462.0021 / VIBER: 0970-190-4700 ‘Contact Person: EVP RENATO C. MESTICA EMAIL ADDRESS: renatomestica@@gmail com ‘Ades: Sito TekTek Leona, Brow Maloma. Son Fel Zamboles Phitppines _ DENR PERMIT FOR VERDANT PASTURES MINING INT'L. INC. ECC NO: RO3-05282019-4832 It shall cover the operation of a dredging and desilting project (Group 2 1.3) with an annual extraction rate of twenty-four (24) million metric tons with a total area of 20 hectares with the following geographical coordinates; Commer Latitude Longitude 1 15° 02'02.66" 120° 03" 04.08" 2 15°02'10.59" 120° 0317.19" 3 15°02'1481" 12003" 34,99" 4 15°02'11.23" 120°03' 00.03" 5 15°02'1324" —120°03' 00.11" 6 15*02'17.03" 120° 03° 35.01" 7 15° 0213.22" a 15° 02" 06.24" SSS 70600 BE THE GLORY \ Conspicuous womental Compliance Certificate (ECC) shall be posted ConspicUOUS area in the project site, “ce " The proponent shail submit to EMB Region 3 Monthly Dredging Progress Report indicating volume of management nese of erection, Status of dredging area, environmental 10. That should there ‘Nuisance and sanitati Proponent shall be be any complaint related to environmental pollution, ton problem brought about by the dredging operation, the held responsible to address such problem; uN ~ Proponent shall set-up a Multipartite Monitoring Team (MMT) headed by ENRO cial Government. Environment and Natural Resources Ofice (PG- RO) of tba, Zambales, Local Government Units (Municipal and Barangay levels) and other stakeholders/Non-Governmental Organization (NGO) within Sty (60) days upon issuance. Likewise, an Environmental Monitoring Fund Crank care al costs of the MMT shall be established; attendant to the operations IMT shal 12.The proponent shall establish an Environmental Guarantee Fund (EGF) to Cover the costs of rehabilitation of affected areas and compensation of Gamages caused during the development, operation and abandonment Phases of the project; 13. The proponent shall allow inspection or monitoring that will be conducted by this Office anytime in coordination with concerned groups; 14.4 Community Development Program to include livelihood projects and Possible resettlement of communities vulnerable to soil erosion shall be developed in collaboration with the stakeholders identified by the LGUs; Ul. RESTRICTIONS 15. Any expansion or modification of the approved project shall be subject to new EIA requirement; 16. The proponent shall ensure that the noise from the operation shall not distur the community especially at night; - 17.Dredging activities shall be confined only within the legal boundaries of the project area as approved in the allocated area by the DENR/DPWH inside the designated River Dredging Zone. A 10-meter buffer zone around the Perimeter of the dredging area shall be observed; 18.Secure Dredging Clearance from the Department of Public Works and Highways Region III prior to project operation: 19.No dredged materials shall be disposed of or transported without any permit or prior approval from the Mines and Geosciences Bureau (MGB); 20.The proponent (Verdant Pastures Mining Intemational Inc.) shall strictly comply with the criteria and limitations as prescribed in the Dredging Master Plan approved by the DPWH and shall conform with the Navigational Traffic Schedule for dredging and hauling activities to be approved by the DENR/DPWH/DOTR; Cc. nos.052020194832 mame and rating Project VERDANT PASTURES WING INTERNATIONAL INC CORTE” Official Receipt of the of the Philippl Repul Ne 2308496 s { Amount l | p 2,700.00 ‘Amount in Wordine Thousand Seven Hundred ) Cheek 1 Money Order Received the amount stated abpve, HA B. VELASCO Collecting Officer NOTE; Write the number and date of th receipt on the back of check or money order received Republic of the Philippines Re ARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ENVIRONMENTAL MANAGEMENT BUREAU Regional Orice No.l, Turquoise Steet, Zone 2, Ramat Vilage, San hg City of San Fernando, Pampanga Tol. Nos. (045) 455-3316, 455-3080, 455-4340 402-5071, 402-5073, 402-5074 fh ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued Under Presidential Decree 1586) RO3-05282019-4832 THIS IS TO CERTIFY THAT VERDANT PARTURES MINING INTERNATIONAL INC. is granted this Environmental Compliance Certificate (ECC) for the maedging and Desilting Project to be located at Maculeol River, Bray. San Rafael, Municipality of San Felipe, Province of Zambales, by the Department of Environment and Natural Resources (DENR), through the Environ mental Management Bureau, Region til, THIS IS SUBJECT to the conditions and restrictions setout in this ECC and in attached it labeled as Annex A. Recommendations have been provided in Annex B as guidance to concemed government agencies and local government units for consideration in their decision making, It shall cover the operation of a dredging and desitting project (Group 2.1.3) with an annual extraction rate of twenty four (24) million metric tons with a total area of 20 hectares with the following geographical coordinates. 15°02'13.24" 120°04'00.11" 15°02"17.03" 120°03'35.01" 15°02°13.22" 120°03'16.13" 15°02'06.24" 120°03'02.39" esscnun ag 3 cortication faved in complance t the rev er ees 1586, in scocndance! to Department Administrative Order No. 2003-30. The however, is not precluded from reevaluating, adding, removing, and correcting oy defbloncios ‘or errors that may be found after issuance of this certificate. Issued at City of San Fernando, Pampanga, this Recommending Approval: = Approved by: DENNIS O. CELESTIAL Chief, Clearance and Permitting Division LORMELYN E. CLAUDIO, CESO IV Regional Director ART MENT OF une he Pioines ENVIRONMENT AND NATURA! VIRONMENTAL MANAGI MENT BUREAU Regional Office No. I, Turquoise Street, Zone 2, Ramar Vilage, San Agustin City of San Femando, Pampanga Tel. Nos. (045) 455-3916, 455-3080, 455-4340 402-5071, 402-5073, 402-5074 ECC Ref. Code No. R03-0528201: Mr. Manolo B. Nuezca at President VERDANT PASTURES MINING INTERNATIONAL INC. ‘53 Maginhawa Street, U.P. Vill Quezon City lage, Diliman Dear Mr. Nuezca, This refers to your application for an Environmental Compliance Certificate (ECC) for the Proposed Dredging and Desilting Project to be located at Maculcol River, Bray. San Rafael, Municipality of San Felipe, Province of Zambales. After satisfying the requirements of the said application, this Office has decided to grant an Environmental Compliance Certificate (ECC) to the above-mentioned project. In issuing this CERTIFICATE, il is expected that you will diligently secure pertinent PERMITS/CLEARANCES from all concerned government agencies. With the issuance of this ECC, you are expected to implement the measures presented in the Environmental Impact Statement (EIS), intended to protect and mitigate the project's adverse impacts on community health, welfare and the environment Environmental considerations shall be incorporated in all phases and aspects of the project. You may proceed with project implementation, after securing all the necessary permits from the pertinent government agencies. This Office will be monitoring the project periodically to ensure your compliance with the stipulations cited in the attached Ecc. Please be guided accordingly. Very truly yours, LORMELYN E. CLAUDIO, CESOIV Regional Director cc: LGU-San Felipe, Zambales Mines and Geosciences Bureau (MGB) R3 Sarre Son ae Dept ats “tie Earth is the Corts and ‘all that isin at (Psalm 24:1) waLet's be good stewards!” ' CONDITIONS A 1, N 2 - a "sampling tests for parameters such as oil and EN VIRONMENTAL MANAGEMENT and MONITORING PLAN (EMMoP) All mitigating m, ; (Els) shallbe ime teg, "°° Submitted Environmental impact Statement cor h i and sae, cates ofthe projet for greater awareness, undortenaine i ince of the project. The pr ] it EMB Regional Office onan ieineee eng Program shall be submitted to - Implement a Comprehensive Social Development Program (SDP) and submit 4 Separate report together with the Compliance Monitoring Report (CMR); Planting of native tree species or Mangrove species shall be undertaken either within the Project site and/or in other areas as Part of the proponent’s Social and environmental program. The Proponent shall submit to this Office within thirty (30) days from the date of approval of this ECC the ao fegeta langrove Plantation Plan which includes quantities and Species, reallocation and plantin egy an pe areas Planting strategy and management . GENERAL CONDITIONS and/or mandates of EMB, ie., Republic Act (RA) 8749 or “The Clean Air Act of 1999", RA 9003 or “Ecological Solid Waste Management Act, RA 6969 or “Toxic Substances and Hazardous and Nuclear Waste Control Act of 1990" and RA 9275 or “Clean Water Act of 2004”, among which are: ie Eee shall comply with the requirements of other environmental ws * Secure Permit to Operate Air Pollution Source Control Installations (APSCl) + Register as Hazardous Waste Generator * Submit Quarterly Self Monitoring Report * Implement waste minimization, segregation, re-use and other ecological waste management practices. The proponent shall conduct quarterly marine and surface inland water grease, pH, Total Suspended Solid (TSS) and other applicable parameters (water) and results of which shall be included in the Self Monitoring Report (SMR); hall install and implement appropriate and adequate piling, a ca ne and other mitigating " silt traps, oil spill prevention and mitigating plan : we iver dredging asures along the shoreline and river banks and within the river d ons and marine area to prevent coastal and riverbank/s erosion and river/marine oil pollution; 21.No extracti dredged nenctat be undertaken at river embankments. Extraction of the alone the stats o deposits should be unformy dane stating from and increasing is le part of the dredging approved area to deepen the channel, thereby pr Capacity and redirecting the flow of the water in the center Preventing channel shifting and riverbank erosion; and 22.1 ‘ echicn of transfer of ownership of this project, these same conditions and ahd ae shall apply and the transferee shall be required to notify this Office in fifteen (15) days as regards to the transfer of ownership. Non-compliance with any of the provisions of this certificate shall bea suficion Se for the ‘cancellation or suspension ofthis certificate and/or imposition of fine in an amount not 12 exceed Fifty Thousand Pesos (50,000.00) for every violation thereof. O.R No. 2307311 / 2308496 Processing fee + P300.00/ P9,700.00 Date + March 1, 2019 /May 20, 2019

You might also like