VERDANT PASTURES
MINING INTERNATIONAL I
‘COMPANY REG. NO.: 5200712728 COMPANY TIN: 006-81:
‘CONTACT NO.: GLOBE: 0977-462.0021 / VIBER: 0970-190-4700
‘Contact Person: EVP RENATO C. MESTICA EMAIL ADDRESS: renatomestica@@gmail com
‘Ades: Sito TekTek Leona, Brow Maloma. Son Fel Zamboles Phitppines _
DENR
PERMIT
FOR
VERDANT PASTURES MINING INT'L. INC.
ECC NO: RO3-05282019-4832
It shall cover the operation of a dredging and desilting project (Group 2
1.3) with an annual extraction rate of twenty-four (24) million metric
tons with a total area of 20 hectares with the following geographical
coordinates;
Commer Latitude Longitude
1 15° 02'02.66" 120° 03" 04.08"
2 15°02'10.59" 120° 0317.19"
3 15°02'1481" 12003" 34,99"
4 15°02'11.23" 120°03' 00.03"
5 15°02'1324" —120°03' 00.11"
6 15*02'17.03" 120° 03° 35.01"
7 15° 0213.22"
a 15° 02" 06.24"
SSS 70600 BE THE GLORY
\Conspicuous womental Compliance Certificate (ECC) shall be posted
ConspicUOUS area in the project site, “ce "
The proponent shail submit to EMB Region 3 Monthly Dredging Progress
Report indicating volume
of
management nese of erection, Status of dredging area, environmental
10. That should there
‘Nuisance and sanitati
Proponent shall be
be any complaint related to environmental pollution,
ton problem brought about by the dredging operation, the
held responsible to address such problem;
uN ~ Proponent shall set-up a Multipartite Monitoring Team (MMT) headed by
ENRO cial Government. Environment and Natural Resources Ofice (PG-
RO) of tba, Zambales, Local Government Units (Municipal and Barangay
levels) and other stakeholders/Non-Governmental Organization (NGO) within
Sty (60) days upon issuance. Likewise, an Environmental Monitoring Fund
Crank care al costs of the MMT shall be
established; attendant to the operations IMT shal
12.The proponent shall establish an Environmental Guarantee Fund (EGF) to
Cover the costs of rehabilitation of affected areas and compensation of
Gamages caused during the development, operation and abandonment
Phases of the project;
13. The proponent shall allow inspection or monitoring that will be conducted by
this Office anytime in coordination with concerned groups;
14.4 Community Development Program to include livelihood projects and
Possible resettlement of communities vulnerable to soil erosion shall be
developed in collaboration with the stakeholders identified by the LGUs;
Ul. RESTRICTIONS
15. Any expansion or modification of the approved project shall be subject to new
EIA requirement;
16. The proponent shall ensure that the noise from the operation shall not distur
the community especially at night;
- 17.Dredging activities shall be confined only within the legal boundaries of the
project area as approved in the allocated area by the DENR/DPWH inside the
designated River Dredging Zone. A 10-meter buffer zone around the
Perimeter of the dredging area shall be observed;
18.Secure Dredging Clearance from the Department of Public Works and
Highways Region III prior to project operation:
19.No dredged materials shall be disposed of or transported without any permit
or prior approval from the Mines and Geosciences Bureau (MGB);
20.The proponent (Verdant Pastures Mining Intemational Inc.) shall strictly
comply with the criteria and limitations as prescribed in the Dredging Master
Plan approved by the DPWH and shall conform with the Navigational Traffic
Schedule for dredging and hauling activities to be approved by the
DENR/DPWH/DOTR;
Cc. nos.052020194832 mame
and rating Project
VERDANT PASTURES WING INTERNATIONAL INCCORTE”
Official Receipt
of the
of the Philippl
Repul
Ne 2308496 s
{
Amount
l
|
p 2,700.00
‘Amount in Wordine Thousand Seven Hundred
) Cheek
1 Money Order
Received the amount stated abpve,
HA B. VELASCO
Collecting Officer
NOTE; Write the number and date of th receipt on
the back of check or money order receivedRepublic of the Philippines
Re ARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU
Regional Orice No.l, Turquoise Steet, Zone 2, Ramat Vilage, San hg
City of San Fernando, Pampanga
Tol. Nos. (045) 455-3316, 455-3080, 455-4340
402-5071, 402-5073, 402-5074
fh
ENVIRONMENTAL COMPLIANCE CERTIFICATE
(Issued Under Presidential Decree 1586)
RO3-05282019-4832
THIS IS TO CERTIFY THAT VERDANT PARTURES MINING INTERNATIONAL
INC. is granted this Environmental Compliance Certificate (ECC) for the
maedging and Desilting Project to be located at Maculeol River, Bray. San Rafael,
Municipality of San Felipe, Province of Zambales, by the Department of Environment
and Natural Resources (DENR), through the Environ mental Management Bureau,
Region til,
THIS IS SUBJECT to the conditions and restrictions setout in this ECC and in
attached it labeled as Annex A. Recommendations have been provided in
Annex B as guidance to concemed government agencies and local government units
for consideration in their decision making,
It shall cover the operation of a dredging and desitting project (Group 2.1.3) with an
annual extraction rate of twenty four (24) million metric tons with a total area of 20
hectares with the following geographical coordinates.
15°02'13.24" 120°04'00.11"
15°02"17.03" 120°03'35.01"
15°02°13.22" 120°03'16.13"
15°02'06.24" 120°03'02.39"
esscnun ag
3 cortication faved in complance t the rev er
ees 1586, in scocndance! to Department Administrative Order No. 2003-30. The
however, is not precluded from reevaluating, adding, removing, and correcting
oy defbloncios ‘or errors that may be found after issuance of this certificate.
Issued at City of San Fernando, Pampanga, this
Recommending Approval:
= Approved by:
DENNIS O. CELESTIAL
Chief, Clearance and Permitting Division
LORMELYN E. CLAUDIO, CESO IV
Regional DirectorART MENT OF une he Pioines
ENVIRONMENT AND NATURA!
VIRONMENTAL MANAGI MENT BUREAU
Regional Office No. I, Turquoise Street, Zone 2, Ramar Vilage, San Agustin
City of San Femando, Pampanga
Tel. Nos. (045) 455-3916, 455-3080, 455-4340
402-5071, 402-5073, 402-5074
ECC Ref. Code No. R03-0528201:
Mr. Manolo B. Nuezca at
President
VERDANT PASTURES MINING INTERNATIONAL INC.
‘53 Maginhawa Street, U.P. Vill
Quezon City lage, Diliman
Dear Mr. Nuezca,
This refers to your application for an Environmental Compliance Certificate (ECC) for the
Proposed Dredging and Desilting Project to be located at Maculcol River, Bray.
San Rafael, Municipality of San Felipe, Province of Zambales.
After satisfying the requirements of the said application, this Office has decided to grant
an Environmental Compliance Certificate (ECC) to the above-mentioned project.
In issuing this CERTIFICATE, il is expected that you will diligently secure pertinent
PERMITS/CLEARANCES from all concerned government agencies.
With the issuance of this ECC, you are expected to implement the measures presented
in the Environmental Impact Statement (EIS), intended to protect and mitigate the
project's adverse impacts on community health, welfare and the environment
Environmental considerations shall be incorporated in all phases and aspects of the
project. You may proceed with project implementation, after securing all the necessary
permits from the pertinent government agencies. This Office will be monitoring the
project periodically to ensure your compliance with the stipulations cited in the attached
Ecc.
Please be guided accordingly.
Very truly yours,
LORMELYN E. CLAUDIO, CESOIV
Regional Director
cc: LGU-San Felipe, Zambales
Mines and Geosciences Bureau (MGB) R3
Sarre Son ae
Dept ats
“tie Earth is the Corts and ‘all that isin at (Psalm 24:1)
waLet's be good stewards!”' CONDITIONS
A
1,
N
2
-
a
"sampling tests for parameters such as oil and
EN
VIRONMENTAL MANAGEMENT and MONITORING PLAN (EMMoP)
All mitigating m, ;
(Els) shallbe ime teg, "°° Submitted Environmental impact Statement
cor
h i
and sae, cates ofthe projet for greater awareness, undortenaine
i ince of the project. The pr ] it
EMB Regional Office onan ieineee eng Program shall be submitted to
- Implement a Comprehensive Social Development Program (SDP) and submit
4 Separate report together with the Compliance Monitoring Report (CMR);
Planting of native tree species or Mangrove species shall be undertaken
either within the Project site and/or in other areas as Part of the proponent’s
Social and environmental program. The Proponent shall submit to this Office
within thirty (30) days from the date of approval of this ECC the
ao fegeta langrove Plantation Plan which includes quantities and
Species, reallocation and plantin egy an
pe areas Planting strategy and management
. GENERAL CONDITIONS
and/or mandates of EMB, ie., Republic Act (RA) 8749 or “The Clean Air
Act of 1999", RA 9003 or “Ecological Solid Waste Management Act, RA 6969
or “Toxic Substances and Hazardous and Nuclear Waste Control Act of 1990"
and RA 9275 or “Clean Water Act of 2004”, among which are:
ie Eee shall comply with the requirements of other environmental
ws
* Secure Permit to Operate Air Pollution Source Control Installations
(APSCl)
+ Register as Hazardous Waste Generator
* Submit Quarterly Self Monitoring Report
* Implement waste minimization, segregation, re-use and other
ecological waste management practices.
The proponent shall conduct quarterly marine and surface inland water
grease, pH, Total Suspended
Solid (TSS) and other applicable parameters (water) and results of which
shall be included in the Self Monitoring Report (SMR);
hall install and implement appropriate and adequate piling,
a ca ne and other mitigating
" silt traps, oil spill prevention and mitigating plan
: we iver dredging
asures along the shoreline and river banks and within the river d
ons and marine area to prevent coastal and riverbank/s erosion and
river/marine oil pollution;21.No extracti
dredged nenctat be undertaken at river embankments. Extraction of the
alone the stats o deposits should be unformy dane stating from and
increasing is le part of the dredging approved area to deepen the channel,
thereby pr Capacity and redirecting the flow of the water in the center
Preventing channel shifting and riverbank erosion; and
22.1 ‘
echicn of transfer of ownership of this project, these same conditions and
ahd ae shall apply and the transferee shall be required to notify this Office
in fifteen (15) days as regards to the transfer of ownership.
Non-compliance with any of the provisions of this certificate shall bea suficion Se for the
‘cancellation or suspension ofthis certificate and/or imposition of fine in an amount not 12
exceed Fifty Thousand Pesos (50,000.00) for every violation thereof.
O.R No. 2307311 / 2308496
Processing fee + P300.00/ P9,700.00
Date + March 1, 2019 /May 20, 2019