You are on page 1of 3

Title: Method of Statement for Topographical Survey

1. Introduction

- Purpose of the document

- Background information on the project and its objectives

2. Scope of Work

- Description of the extent and boundaries of the survey area

- Identification of key deliverables and outcomes

3. Survey Equipment and Tools

- List of equipment and tools required for the survey

- Explanation of their purpose and functionality

4. Survey Methodology

- Overview of the step-by-step procedure to be followed during the survey

- Description of the techniques and approaches to be used

5. Control Points Establishment

- Explanation of the process for establishing control points

- Identification of the required number and positioning of control points

6. Field Survey

- Description of the field survey activities

- Explanation of the data collection methods, including measurements and observations

7. Data Processing and Analysis

- Overview of the data processing and analysis procedures

- Explanation of the software tools to be used for data manipulation and interpretation

8. Topographical Mapping

- Description of the process for creating topographical maps


- Explanation of the required accuracy, scale, and level of detail

9. Quality Assurance and Quality Control

- Explanation of the measures to ensure the accuracy and reliability of the survey data

- Description of the quality control checks and validation procedures

10. Deliverables

- List of the final deliverables to be provided to the client

- Description of the format, layout, and specifications of each deliverable

11. Timeline and Milestones

- Presentation of the project timeline, including key milestones and deadlines

12. Health, Safety, and Environmental Considerations

- Discussion of the health and safety measures to be implemented during the survey

- Explanation of the environmental considerations and mitigation plans

13. Project Team and Responsibilities

- Identification of the project team members and their roles

- Explanation of their responsibilities and coordination mechanisms

14. Communication and Reporting

- Description of the communication channels and reporting structure

- Explanation of the frequency and format of progress updates and reports

15. Conclusion

- Summary of the key points covered in the method of statement

- Acknowledgment of any additional considerations or requirements

Note: This is a general outline for a Method of Statement for a topographical survey. Depending on
the specific project requirements, some sections may need to be added or modified.

You might also like