You are on page 1of 6
PoOSsco Inspection and Test Plan for TOTAL? PAGES Eac Cathodic Protection Works (including Cover) PROJECT NAME : Khabat Thermal Power Plant Units 182 Purpose DOCUMENT NO. : KP.00+++-CQ712.G0011 Bi For Information TITLE : Inspection and Test Plan for Cathodic Protection | [1 For Review Works CO For Approval OWNER : Ministry of Electricity (MOE) of For Construction Kurdistan Regional Government DAs-Built A [05.11.2014 For issue MD FB AZ To Rev. PREPARED | CHECKED | REVIEWED | APPROVED Z DATE DESCRIPTION No. GAMA POWER SYSTEMS ENG &CONTRACTING.INC. Owner PRX _ % Ministry of Electricity (MOE) P of Kurdistan Regional Government (Contractor POSco POSCO ENGINEERING E&C & CONSTRUCTION CO., LTD. Main Subcontractor © GAMA GAMA POWER SYSTEMS ENGINEERING & CONTRACTING, INC. POSCO POsCOENGMEERING |:°ZVS, Minis of Elecrcty (MOE) ® ‘GAMA POWER SYSTEMS Fad & CONSTRUCTION CO.,. } of Kurdistan regional ENGINEERING. un, Sg Government CCONTRSCTING,INC: Cathodic Protection System INSEPTION CHECK SHEET MATERIALS INSPECTION RECORD Checked Verified m Description ‘Subcontrac | GAM | POSC tor A o Check Conformity and Test Certificates of Transformer Rectifier Check Conformity and Test Certificates of Anodes Check Conformity and Test Certificates of reference Electrodes Check Conformity and Test Certificates of Junction Boxes and Test Stations ol allyl el ee Check Conformity of DC Cables COMMENTS: ‘Above items must be checked against the Project Specifications and Approved Drawings POSCO POsCO ENaIEERING tins of eewey 08 | @) EAC & CONSTRUCTION CO., 2} ofkurdistan regional 70, HJ overnment GAMA POWER SYSTEMS ENGINEERING & CCONTRSCTING,INC: Cathodic Protection System ISEPTION CHECK SHEET FOR INSTALLATION OF ANODES TANK ID Description Checked Verified 300K Subcontrac tor GAM POSsC Check and verify the anode are free from Severe scratches and damages Check the spacing between anodes and Conductor bars Check proper spot welds on anodes/conductor bars Check proper depth between anode and tank base is maintained ‘Check proper connection of DC cables to Conductor Bar Check the tank base is free from scrap and debris First phase of backfilling commencement ensuring no damages to cables Check the resistance of anode system prior to final backfilling Tnitial performance check of anode and reference electrodes with temporary Power supply when 50% of the tank plate is installed Final performance check of anode and reference electrodes with temporary Power supply when 100% of the tank plate is installed ‘COMMENTS: Installation must be done against approve for construction drawings POCO POscO ENGINEERING J Ministry of Electricity (MOE) ‘GAMA POWER SYSTEMS A) © GAMA AC & CONSTRUCTION CO, ‘of Kurdistan regional ENGINEERING & uD, Government CCONTRSCTING NC: Cathodic Protection System INSEPTION CHECK SHEET FOR INSTALLATION & TESTING OF REFERENCE ELECTRODES TANKID | Checked Verified Description x00 | Subcontrac | GAM | POSC tor A ° Check and verify the Reference Electrodes are free from damages ‘Check the location of Reference Electrodes against approve for construction drawings ‘Check proper saturation of reference electrodes with water and verify its functionality prior to backfilling Check installation of proper number of reference electrodes Check proper routing of reference electrodes cables Final phase of backfilling commencement ensuring no damages to reference electrodes and cables Yo ofelal el x] eH] ae 3 ‘Check proper functionality of reference electrode after completion of backfilling activities REFERENCE ELECTRODE TESTING Reference Electrode Testing of Electrode (mV) Location Reference Electrode #1 Reference Electrode #2 Reference Electrode #3 POSCO POCO ENGINEERING a into ety (408) Siroason pons ”|@ GAMA Government EAE & CONSTRUCTION CO., uo, fae GAMA POWER SYSTEMS ENGINEERING & CCONTRSCTING tc: Cathodic Protection System INSEPTION CHECK SHEET FOR ISTALLATION OF JUNCTION BOXES Checked | Verified Item Description Junetion # Box | Subcontrac | GAM | POSC 1D tor Ao ‘1 | Check and verify the Junction boxes are free from Corrosion and other damages 2___| Check the location and proper orientation of Junction Boxes 3___| Check the installation height and alignment of junction box 4 _| Check and verify the Junction Box name plates are fixed properly for Correct identification 5 _ | Check the proper termination of cables with correct identification tags 6 | Check all cables inside the junction box are neatly tied with cables ties SCO POSCOENGINEERING |:°Z7\S\ Ministry of Electricity (MOE) GAMA POWER SYSTEMS POSED consTmUCTION co, } Std |@ GAMA Srenccuve uD. GH overnment CONTRSCTING,INC: Cathodic Protection System INSEPTION CHECK SHEET FOR INSTALLATION OF TRANSFORMER RECTIFIER TANK Checked Verified Description 1D 5 3 # xox | Subcontrac | GAM | POSC tor A ° Check and verify the Transformer Rectifier are free from Corrosion and other damages Check and verify all the instrumentation in Transformer Rectifier are free from damages ‘Check the location and orientation of Transformer Rectifier Check and conducting is properly done with end bushes fitted for protection against cable damages ‘Check the connection of cables against + and- sign Check the connection of tank cables against correct circuit of the transformer rectifier ‘Check and verify the proper grounding is dane as per Project specifications Check and proper termination of cables with correct identification tags oo S| ofa alul nH ‘Check all the cables inside the transformer rectifier are neatly tied with cables ties ‘COMMENT: ‘Transformer Rectifier must be installed against the approve for construction drawing ‘Subcontractor ‘GAMA POSCO OWNER Name: Name Signature: Date

You might also like