Mechanical Power supplies required.

Watts Included - 12/02/24

Initial Allowances: 12/02/24

External – All supplies on eternal of rear wall (behind toilet and baby change)

1No single phase 25A isolator external at circa 1.2m AFFL – for Heating & DHW ASHP = 5000W

1No single phase 16A isolator external at circa 1.2m AFFL – For DX system Waiting room = 3500W

1No single phase 16A isolator external at circa 1.2m AFFL – For DX system Office = 3500W

Total external peak = 12kW

Internal

1No single phase 16A isolator within cupboard behind men’s urinal –water immersion = 3000W

1No 13A isolator within cupboard behind men’s urinal – For DHW circulation Pump = 500W

2No 13A spur within cupboard behind men’s urinal – cont. and aux power (allowance) = 500W TOTAL

2No 13A spur on ceiling of waiting room – for Cooling cassette Unit. = 600W TOTAL

1No 13A spur ceiling void of office – for cooling cassette unit. = 300W

1No 13A spur ceiling void of Mens WC (above WHB) – for HRU vent unit. = 100W

Total external peak = 5kW

Total mechanical power peak = 17kW


Current Allowances: 16/02/24

External – All supplies on eternal of rear wall (behind toilet and baby change)

1No single phase 25A isolator external at circa 1.2m AFFL – for Heating (wet Rads) = 5000W

1No single phase 16A isolator external at circa 1.2m AFFL – For DX system Waiting room = 3500W

1No single phase 16A isolator external at circa 1.2m AFFL – For DX system Office = 3500W

Total external peak = 12kW

Internal

2No single phase 19A Spur below Male WHB’s –water Heaters ZIP ES4 = 8800W (4.4kW each)

2No single phase 19A Spur below Female WHB’s –water Heaters ZIP ES4 = 8800W (4.4kW each)

1No single phase 19A Spur below Accessible Male WHB – water Heaters ZIP ES4 = 4400W

1No single phase 19A Spur below Accessible Female WHB – water Heaters ZIP ES4 = 4400W

1No single phase 19A Spur below Baby Change WHB – water Heaters ZIP ES4. = 4400W

1No single phase 13A Spur below kitchen sink – water Heaters ZIP aqua point 15L = 2000W

2No 13A spur on ceiling of waiting room – for Cooling cassette Unit. = 600W TOTAL

1No 13A spur ceiling void of office – for cooling cassette unit. = 300W

1No 13A spur ceiling void of Mens WC (above WHB) – for HRU vent unit. = 100W

Total internal peak = 35.8kW

Total mechanical power peak = 47.8kW

Note: the peak loads have no diversity applied above. The 4.4kW water heater units will be
intermittent usage, only drawing power when WHB are in use.