IECC2018/NYSECCC2020

SECTION 403.3.3 DUCT TIGHTNESS


COMPLIANCE REPORT

347 MARIETTA AVE


HAWTHORN,NY, 10532

BUILDING ANALYST PROFESSIONAL


INFILTRATION AND DUCT LEAKAGE
MULTIFAMILY BUILDING ANALYST PROFESSIONAL
ENVELOPE PROFESSIONAL
QUALITY CONTROL INSPECTOR

BPI CONTRACTOR ID# 1016445


Project 347 Marietta ave Test Date
Name

Address 347 Marietta Ave Hawthorn,


NY 10532
12/12/2023

Technician ADDANS SOARES #5068604

TEST PERFORMED AND CRITERIA

Duct Testing conducted in accordance with NYSECCC2020; Section 403.3.3


The test was performed by a certified BPI technician representative of MINI KING.
MINI KING is a third-party HVAC and Consulting company.
Total leakage test performed on installed ducted HVAC system using
depressurization method
The maximum allowable duct leakage @-25Pa of pressure differential is less or
equal to 4cfm per 100 sqft of served area, including air handler enclosure.
All registers were taped with quick vent tape.

CONDITIONS

TWO EQUIPMENT SERVING DIFFERENT AREAS, FIRST AND SECOND FLOOR


TOTAL AREA SERVED BY HVAC SYSTEM TESTED: 1270 sqft
LEAKAGE LIMIT: 51 CFM @-25Pa
MEASURED COMBINED LEAKAGE: 36 CFM @-25Pa
TEST RESULT

% OF TOTAL
MEASURED TOTAL LEAKAGE DUCT RESULT Notes
LEAKAGE

SYSTEM DOES COMPLY


36 CFM @-25Pa 2.8% PASS WITH NYSECCC2020
SECTION 403.3.3

NOTES

SYSTEM 1 SERVING FIRST FLOOR 698 SQ FT 20 CFM @ -25pa


SYSTEM 2 SERVING SECOND FLOOR 572 SQ FT 16 CFM @ -25pa

PHOTOS

12/13/2023
Technician : Addans Soares