Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)

INSPECTION REQUEST LOG (Civil/ Structural)

10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection

Inspection for Formation Level & Pouring of


Blinding concrete (SRC C20/20) for
6575 CP837-INS-CIV-6572 7-Jun-21 8-Jun-21 9:00 A.M. Neutralizer Container Foundation for Odour Civil 8-Jun-21 A
Control @ Near Aerobic Digester tank-10, As
highlighted in the attached drawing.

Inspection for Surface Preparation &


Aplication of Bitumode Primer (2 Coats) Over
Blinding Concrete Prior to Waterproofing
6576 CP837-INS-CIV-6573 7-Jun-21 8-Jun-21 9:00 A.M. membrane over for Neutralizer Container Civil 8-Jun-21 A
Foundation for Odour Control @ Near
Aerobic Digester tank-10, As highlighted in
the attached drawing.

Inspection for Placing of Waterproofing


membrane sheet (2 Layers) & 6mm Thick
Protecton Board Over Blinding Concrete for
6577 CP837-INS-CIV-6574 7-Jun-21 8-Jun-21 9:00 A.M. Civil 8-Jun-21 A
Neutralizer Container Foundation for Odour
Control @ Near Aerobic Digester tank-10, As
highlighted in the attached drawing.

Inspection for Rebar & Formwork of


Neutralizer Container Foundation for Odour
6578 CP837-INS-CIV-6575 7-Jun-21 8-Jun-21 9:00 A.M. Control Prior to Pouring of Concrete @ Near Civil 8-Jun-21 A
Aerobic Digester tank-10, As highlighted in
the attached drawing.

Inspection for Pouring of Concrete (C40/20


OPC 70% + 30% PFA) of Neutralizer
6594 CP837-INS-CIV-6591 10-Jun-21 12-Jun-21 9:00 A.M. Container Foundation for Odour Control @ Civil 12-Jun-21 A
Near Aerobic Digester tank-10, As highlighted
in the attached drawing.

Inspection for Surface Preparation Prior to


Application of Filler & Primer (Using Master
Brace ADH 2200) for Neutralizer Odour
6623 CP837-INS-CIV-6620 14-Jun-21 15-Jun-21 9:00 A.M. Civil 15-Jun-21 A
control Container Foundation @ Near Aerobic
Digester tank 10,As highlighted in the
attached drawing-External Surface.

Page 1 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)

INSPECTION REQUEST LOG (Civil/ Structural)

10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Inspection for Application of Filler & Primer
(Using Master Brace ADH 2200) Prior to
Application of First Coat (USing Master
6624 CP837-INS-CIV-6621 14-Jun-21 15-Jun-21 9:00 A.M. Protect 190) for Neutralizer Odour control Civil 15-Jun-21 A
Container Foundation @ Near Aerobic
Digester tank 10,As highlighted in the
attached drawing-External Surface.

Inspection for Rebar & Formwork of


Neutralizer Container Foundation for Odour
6753 CP837-INS-CIV-6751 4-Jul-21 5-Jul-21 9:00 A.M. Civil 5-Jul-21 A
Control Prior to Pouring of Concrete @ Near
LRPS, As highlighted in the attached drawing.

Inspection for Pouring of Concrete (C/40/20


OPC 70% + PFA 30%) of Neutralizer
6754 CP837-INS-CIV-6752 4-Jul-21 5-Jul-21 9:00 A.M. Container Foundation for Odour Control @ Civil 6-Jul-21 A
Near LRPS, As highlighted in the attached
drawing.

Inspection for Surface Preparation Prior to


Application of Filler & Primer (Using Master
Brace ADH 2200} for Neutralizer Odour
6788 CP837-INS-CIV-6786 10-Jul-21 11-Jul-21 9:00 A.M. Civil 11-Jul-21 A
control Container Foundation @ Near
LRPS,As highlighted in the attached drawing-
External Surface,

Inspection for Application of Filler & Primer


(Using Master Brace ADH 2200) Prior to
Application of First Coat (USing Master
6793 CP837-INS-CIV-6791 10-Jul-21 11-Jul-21 9:00 A.M. Protect 190) for Neutralizer Odour control Civil 11-Jul-21 A
Container Foundation @ Near LRPS,As
highlighted in the attached drawing-External
Surface.

Inspection for Setting Out & Formation Level


of Electrical Cable Trench Prior to Sand
Bedding at Lagoon pumping station building
6818 CP837-INS-CIV-6816 13-Jul-21 14-Jul-21 9:00 A.M. Civil 18-Jul-21 A
towards Odour control Neutralizer Container
near LRPS , As highlighted in the attached
drawing

Page 2 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)

INSPECTION REQUEST LOG (Civil/ Structural)

10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Inspection for Setting Out & Formation Level
of Electrical Cable Trench Prior to Sand
Bedding at Odour control Neutralizer
6819 CP837-INS-CIV-6817 13-Jul-21 14-Jul-21 9:00 A.M. Container near Aerobic digester 10 towards Civil 18-Jul-21 A
Tse lagoon odour control masking pipe
supports, As highlighted in the attached
drawing

Inspection for Settingout,Formation level and


Blinding Concrete for Odour neutralizer
6862 CP837-INS-CIV-6859 29-Jul-21 31-Jul-21 9:00 A.M. Civil 31-Jul-21 A
Container near OCU-2 As per the attached
drawing.

Inspection for Surface Preparation &


Application of Bitumode Primer (2 Coats)
Over Blinding Concrete Prior to
6895 CP837-INS-CIV-6893 5-Aug-21 7-Aug-21 9:00 A.M. Waterproofing membrane over for Neutralizer Civil 7-Aug-21 A
Container Foundation for Odour Control at
near OCU 2, As highlighted in the attached
drawing.

Inspection for Placing of Waterproofing


membrane sheet (2 Layers) & 6mm Thick
Protection Board Over Blinding Concrete for
6896 CP837-INS-CIV-6894 5-Aug-21 7-Aug-21 9:00 A.M. Civil 7-Aug-21 A
Neutralizer Container Foundation for Odour
Control at near OCU 2, As highlighted in the
attached drawing.

Inspection for Rebar & Formwork of


Neutralizer Container Foundation for Odour
6897 CP837-INS-CIV-6895 5-Aug-21 7-Aug-21 9:00 A.M. Control Prior to Pouring of Concrete at near Civil 7-Aug-21 A
OCU 2, As highlighted in the attached
drawing.

Inspection for Pouring of Concrete (C/40/20


OPC 70% + PFA 30%) of Neutralizer
6898 CP837-INS-CIV-6896 5-Aug-21 7-Aug-21 9:00 A.M. Container Foundation for Odour Control at Civil 7-Aug-21 A
near OCU 2, As highlighted in the attached
drawing.

Page 3 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)

INSPECTION REQUEST LOG (Civil/ Structural)

10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection

Inspection For Final Application Of Protective


Coating (Using Master Protect 190) for
6923 P837-INS-CIV-6920 14-Aug-21 15-Aug-21 9:00 A.M. Neutralizer Odour control Container Civil 15-Aug-21 A
Foundation @ Near Aerobic Digester tank 10
, As highlighted In The Attached Drawing.

Inspection For Final Application Of Protective


Coating (Using Master Protect 190) for
6924 CP837-INS-CIV-6921 14-Aug-21 15-Aug-21 9:00 A.M. Neutralizer Odour control Container Civil 15-Aug-21 A
Foundation @ LRPS , As highlighted In The
Attached Drawing- Internal Surface.

Inspection for Surface Preparation Prior to


Application of Filler & Primer (Using Master
6925 CP837-INS-CIV-6929 14-Aug-21 15-Aug-21 9:00 A.M. Brace ADH 2200) for Neutralizer Odour Civil 15-Aug-21 A
control Container Foundation @ Near OCU-
2,As highlighted in the attached drawing

Inspection for Application of Filler & Primer


(Using Master Brace ADH 2200) Prior to
Application of First Coat and final coat (Using
6926 CP837-INS-CIV-6930 14-Aug-21 15-Aug-21 9:00 A.M. Civil 15-Aug-21 A
Master Protect 190) for Odour Neutralizer
Container Foundation @ Near OCU-2,As
highlighted in the attached drawing.

'Inspection For Final Application Of Protective


Coating (Using Master Protect 190) for Odour
6930 CP837-INS-CIV-6934 14-Aug-21 15-Aug-21 9:00 A.M. Neutralizer control Container Foundation @ Civil 15-Aug-21 A
OCU-2 , As highlighted In The Attached
Drawing.

Inspection for Gravel Bedding of Chemical


hose line trench of Odour control Neutralizer
Container near Aerobic digester 10 towards
6933 CP837-INS-CIV-6937 14-Aug-21 15-Aug-21 9:00 A.M. Civil 15-Aug-21 A
Tse lagoon Odour control masking pipe
supports, As highlighted in the attached
drawing.

Page 4 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)

INSPECTION REQUEST LOG (Civil/ Structural)

10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection

'Inspection for Dune Sand Surround of


Electrical & Instrumentation Cable Trench
6948 CP837-INS-CIV-6946 16-Aug-21 17-Aug-21 9:00 A.M. Prior to Backfilling at Odour Neutralizer Civil 17-Aug-21 A
Container Towards LRPS , as highlighted in
the attached drawing.

Inspection For Snagging of Odour Neutralization


8333 CP837-INS-CIV-8330 24-Dec-22 25-Dec-22 9:30 A.M.
System including containers & lagoon
Civil 25-Dec-22 AWC

Inspection for setting out of line & formation levels


and verification of formation and pouring of blinding
concrete for Flush kerbstone, garden kerbstone and
8362 CP837-INS-CIV-8358 4-Jan-23 5-Jan-23 9:30 A.M.
raised kerbstone at Foundation of Odour Neutralizer
Civil 8-Jan-23 A
Technical Container as highlighted in the attached
drawing.

Inspection for Installation of Precast Concrete half


battered,flush and garden kerbstone(check for levels
and allignment) and Kerbstones Backing Concrete &
8395 CP837-INS-CIV-8389 21-Jan-23 22-Jan-23 9:30 A.M.
Filling of Joints at SSF area and Odour neutralizer
Civil 24-Jan-23 A
Container foundation as attached in the highlighted
drawing.

Inspection for setting out of line & formation levels


and verification of formation and pouring of blinding
concrete for Flush kerbstone, Raised kerbstone &
8396 CP837-INS-CIV-8390 21-Jan-23 22-Jan-23 9:30 A.M.
garden kerbstone at Foundation of Odour Neutralizer
Civil 24-Jan-23 A
Technical Container as highlighted in the attached
drawing.

Inspection for laying of Subbase & compaction and


FDT testing at New digester tank area & Odour
8425 CP837-INS-CIV-8421 2-Feb-23 4-Feb-23 9:30 A.M.
neutralizer technical container prior to interlock work
Civil 6-Feb-23 A
as attached in the highlighted drawing.

Page 5 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)

INSPECTION REQUEST LOG (Civil/ Structural)

10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection

Inspection for Installation of Precast Concrete half


battered,flush and garden kerbstone(check for levels
and allignment) and Kerbstones Backing Concrete &
8506 CP837-INS-CIV-8501 29-Apr-23 29-Apr-23 9:30 A.M.
Filling of Joints at New Digester tank , Odour
Civil 26-Apr-23 A
Neutralizer technical Container A67 and patch work
areas as highlighted in the attached drawing.

Inspection for setting out of line & formation levels


and verification of formation and pouring of blinding
concrete for garden and raised kerbstone at OCU 3,
8507 CP837-INS-CIV-8502 29-Apr-23 29-Apr-23 9:30 A.M.
patch work areas at SSF, Odour neutralizer technical
Civil 26-Apr-23 A
container (A70) & back side of office container area as
highlighted in the attached drawing.

Inspection for Installation of Precast Concrete half


battered,flush and garden kerbstone(check for levels
and allignment) and Kerbstones Backing Concrete &
8521 CP837-INS-CIV-8521 14-May-23 15-May-23 9:30 A.M. Filling of Joints at OCU 3, patch work areas at SSF, Civil 16-May-23 AWC Missing survey report
Odour neutralizer technical container (A70) & back
side of office container area as highlighted in the
attached drawing.

Inspection for Close out of PIL Snag List for Odour


8524 CP837-INS-CIV-8524 14-May-23 15-May-23 9:30 A.M.
Neutralization System (3 containers)
Civil 16-May-23 AWC

Inspection for laying of 50mm fine aggregate sand &


Interlocks installation at Odour Neutralization
8525 CP837-INS-CIV-8525 15-May-23 16-May-23 9:30 A.M.
Containers A67, A68 & A70 as attached in the
Civil 16-May-23 AWC survey report
highlighted drawing

Page 6 of 6