10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Page 1 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)
10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Inspection for Application of Filler & Primer
(Using Master Brace ADH 2200) Prior to
Application of First Coat (USing Master
6624 CP837-INS-CIV-6621 14-Jun-21 15-Jun-21 9:00 A.M. Protect 190) for Neutralizer Odour control Civil 15-Jun-21 A
Container Foundation @ Near Aerobic
Digester tank 10,As highlighted in the
attached drawing-External Surface.
Page 2 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)
10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Inspection for Setting Out & Formation Level
of Electrical Cable Trench Prior to Sand
Bedding at Odour control Neutralizer
6819 CP837-INS-CIV-6817 13-Jul-21 14-Jul-21 9:00 A.M. Container near Aerobic digester 10 towards Civil 18-Jul-21 A
Tse lagoon odour control masking pipe
supports, As highlighted in the attached
drawing
Page 3 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)
10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Page 4 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)
10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Page 5 of 6
Name of Project: Design & Built Contract (D&B) for Rehabilitation of Doha South Sewage Treatment Works (DSSTW)
10-Oct-23
Submission Days Spent for
No Reference No. Date & Time of inspection Activity Trade Actual date of inspection Status Comments
Date Inspection
Page 6 of 6