You are on page 1of 56
NOTES :- THIS NOTE VALID FOR THE DRAWING RELATED TO THIS PROJECT: 1, PLEASE D0 NOT SCALE FROM THE DRAWINGS. 1ONS ON THIS DRAWINGS SHALL BE CHECKED ON SITE DIMENSIONS SHALL BE TAKEN IN PREFERRENCE TO SCALE Dl FORE WORK COMMENCES, IONS, 3. PROJECT ENGINEER , SITE ENGINEER , CONTRACTORS & THE SUB CONTRACTORS ARE TO VERIFY THE FOLLOWINGS AT SITE:- 4) REINFORCEMENT POSITION. ) DEVELOPMENT LENGTH, ©) CLEAR COVER. d) CONCRETE MIX RATIO. e) ALL DIMENSIONS AND LEVEL. 4, PROJECT ENGINEER , SITE ENGINEER , CONTRACTORS & THE SUB CONTRACTORS ISTO NOTIFY THE CONSULTANT ABOUT ANY DISCREPANCIES / DIFFERENCES CONTAINED IN THE DRAWING (IN RELATION TO OTHER DRAWINGS) BEFORE BEGINNING THE WORK COMMENCES. COPY RIGHT:- DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF SERVICE ARE AND SHALL REMAN THE PROPERTY OF ENGINEER / CONSULTANT / FM WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NO. THEY ARE NOT TO BE USED ON OTHER PRCLECT OR EXTENSIONS TO THE PROJECT OR OTHER SIMILAR PROJECT EXCEPT BY WRITTEN AGREEMENT AND WITH APPROPRIATE PROFESSIONAL FEES TO THE CONSULTANT. ‘SRCTIAAL SFEIFEATON STRUCTURAL DESIGN CRITERIA & MINIMUM REQUIREMENTS 41, GENERAL INFORMATION: 2) AL STRUCTURAL ESIN PARAMETERS USED ACCORONG T BAEC 2) THESTRUCTURAL SYSTEM WTERUEDITE MOMENT RESSNG RANE SYS "HE LATERAL FORCES ARE AIALYSED BY EQUVALEN STATIC FORCE METHOD. 0 BAC29 FOR SPECCATONISTRICTURAL REQUREMENTS NOT MENTIONED INTHEORAANGS OR NTH NOTE SHEET ‘d) ANY DETAILS NOT SHOWN IN THE DRAWING SHOULD BE DONE ACCORDING TO BUILDING COE & COMMENTARY 25, ACL YEC59188.25 ®) OTHER LOADS AS PER BNBC 1993 1 peSGnNeTHCO: USD. Cawso, CUSDAMSD NOTE: ALTE STRUCTURAL ORANINGS SHALL BE READIN COMMANGTON a RELEVANT ARCHTECTURAL DRAGS. aN 2. LOAD CALCULATION DATA: 3) ARALZONE: CADHAKA CI CAITTASONG 8) BASIC WIND SPEED =280enFOR CHITTAGONG) BASIe WIND SPEED =210enFOR AKA) ¢)Seisue Z0NE 2 4) EXPOSURECONDITION: «A MATERIALS: |) ENGNEERING MATERILS: #) CEMENT: ‘ORDINARY PORTLAND CEMENT (PREFERABLE) PORTLAND COMPOSITE CEMENT COULD BE USED, WHERE CLNKER a REST ARE FLYASH OR (B)WHERE CLINKER 8-30; REST PART ARE SLA, FINENESS =2000 nm ign. Ina, SETTNGS THE 2. FINAL SETTNGS TME = 41. * CONPRESSWE STRENGTH: 2800S = 3500291 i), FINE AGGREGATE (SAND) LOCAL SAND (ANGULAR SHAPE) Em FLING SAND (ANGULAR SHAPE SYLHET SAND ANGULAR SHAPE} Ft A TOBE USED WALL, {28 TORE USED ALLRC.C WORK ‘TWPE: b) fe 200 Pi UNDER Te MATERIALS USED IN CONCRETE WITH DESIRED COMPRESSIVE STRENGTH: ee: a) te 350 si UN THE FOLLOWNG: (ONLY FOR COLUMN, MAT ETC (1 15:3) CCOMRSE AGGREGATE ~ 8° DOMN STONE CHPS SYLHET SAND ANGULAR SHAPE} FA = 22-2870 CUSED ALLRCC WORK, LLOWNG A FOR ROOF SLAB, FLOOR BEANSTAR, OHWTETC,128) ‘COARSE AGGREGATE > 24" DOWN STONE CHIPS SYLHET SAND ANGULAR SHAPE) Ff = 23-24 TOBE USED ALL RCC WORK, ©) MINIMUM CYLINDER STRENGTH: FoR PORTLAND COMPOSE CEMENT BASED N CYLINDER TEST OF DIAMETE 1) 23DAYS STRENGTH 4700 PSIFOR TYPEA fat Lab Tet) 1) 22DAYS STRENGTH AHEIGAT= 12 Iv) REINFORCEMENT: 2) STEEL 10 BE USED WITH YIELD STRENGTH {= 60600 ps b) THEFOLLOWING TESTS FOR REINFORCING BARS FROM RANDOM SAMPLES SHALL ‘CONDUCTED AT BUET AS PER DS 1 UBM 9 AND TEST RESULT SHALL KING AND RECORD: 1 PERCENTAGE ELONGATION TEST fy BENORESEND TEST )BRICK: ING PLASTER & BRICK LAYING MORTAR, 5-07 TOBE USED IN GROUND FLOOR FLING, FOUNDATION FLING ET. 4) SIZE = 95° 45°X275' UNIFORM BLACKISH Re \WATER ABSORPTION CAPACITY NOT GREATER THAN 128, b) CLADDING BRIS SIZE" 25" Ka" \WATER ABSORPTION CAPACITY NOT GREATER THAN ‘STRCTIAL SFFEATON e02 v).WATER: POTABLE WATER TO: 2 N CONCRETE MI WG RATIO = 4% 83) NONENGNEERING WATERILS: 2) WATER sToPPEn, WIDE PVC WATER STOPPER TO BE USED AT ALL CONSTRUCTION JOWTS BELOW GROUND I UAT, SHEAR WAL, WATER TANK WAL POLYTHENE SHEET: 1 0W FOUNDATION, PARKING FLOOR, UG WATER TANK, SEPTIC TANK. ©) GEOTEXTLE: ONLY PROVIDE AT RETAINING WALL TO PREVENT SOIL ERROSION, 4, SUB STRUCTURE: ‘A) FOUNDATION: BUILDING HAS BEEN DESISNED FOR (-STORED) HASHING BULOING, “OUNDATION TYPE -.NO DEWATIONIS ALLOWED) TSNGLE FOOTING. <2 SINGLE COWBINED FOOTING, C2 RCC. CASTINSITUPLE. ©) ANY LOOSE POCKET FOUND IN FOUNDATION BED IS TOBE FLLED UP TH CCONPACTED SAND OF FM 25 MRL «DEPTH OF FOUNDATION AS PER DRAWING, 8) CHAIRS: USE CHAIRS OF NECESSARY DIMENSION MADE OF 190/120 BAR TO SUPPORT TOP BARS g 3G, ©) PILE CAP DETAIL 5, SUPER STRUCTURE: ‘A) COLUMN DETAL: 2) MINIMUM MAIN BAR SPACING OF COLUM, CLEAR OISTANCE BETWEEN LONGTTUDAL BARS SHALLNOT BE LESS THAN 16 TIMES 24RDIAVETER, 15 TMES THE SUE OF COURSE AGSREGATE NOR 18° by TIE ARRANGEMENTS IN COLUMN : St $4 S9H0N8 9 < AMAT FOUNDATION 6) TIE HOOK DETAIL FORCEMENT fe ALTERNATELY ATT Kd CORNERS OF THE COLUM AS SHOWN SR ero [| wg 4) VERTICAL SECTION OF COLUMN NOTE:-PARKING FLOOR COLUMN TIE SPACING 4" C/C ALLTHROUGH, ‘ Loon LeveL rooateves oon vet 5} room ever f f Le 4 Ue rast ne Fou sureoRr velpmertlengh tomn 9 ef} ove 1:6 MANTANSY Tg tI AaooR eve fooR eves ‘omm 2 @F' le ars taesrucensrse vocareo win 4 TEI] femex ia orcoumicexerinsencrstoor ‘on ef fst ne? Fou surPoRt Us AooR Leet at a : oo a ©) GOLUMN OFFSET TYPE 4 © COLUMN OFFSET TYPE-2 @ MAINBAR SLOPE ) STIRRUP END DETAIL: B) BEAM DETAIL: «)_ MAXIMUM BARS IN BEAMS IN SINGLE LAYER: LAVERIN BEAN WM NUMBER OF BARS AS A SING STEM SHALL AS FER BUILDING CODE & COMMENTARY 2005, ACL 18-0531 |AS FOR EXAMPLE: FOR 10° BEAM WHDTH-2NOS BAR SINGLE LAYER (UPTO ZS BAR) FOR 1 2EAM WIDTH -& NOS BAR W SINGLE LAYER (UPTO 25m BAR} |" (nbetnbar) (ater sirup) b) SPACER BARS: TO SUPPORT SECOND LAYER BARS IN BEANSISLABS, USE 250 SPADER STREAM BARS @ 30" Clo WHERE REQUIRED. @) ROOF BEAM & COLOUM JUNCTION DETAIL WITH STIRRUP SPACING PLACEMENT. Ly -Li2- T rn ue —| | tse i d 7 L + — J Teton spit 0% \ | mt Ny i: 2 ©) SLAB DETAIL: v\zAsT2 os sTUP FOR BEAU SZESOXIE 2) REINFORCEMENT DETAILS FOR SLAB OPENINGS: AvieASTaNos stu FORBEAY SME 2 MIDDLE STIRRUP SMALLES OF THE FOLLOWING 1, S = Avfy/50bw. 2S= 2 3S = 24" | LAP LOCATION : FR EAM BOTW BAR LA NOT To BE PROWDED AT BDL Tao 20N= OE SPAN FR BEAN TOP AR LAP HAY B REED ATMDOLETHRD 20 F THE SAN 6 Nor WORE TANS OF THE BARS HAL BE eT MORE THA “et: Rentini act 4) LAP SPLCES ARE TO BE CONFNED BY HOOPS WITH MAXIMUM @ Therumber of xa bars > ni? SPACING ORPTCHOF OR HERE AG THE {patton ba) EFFECTEDEPT OFTHE BEAL © Therumbe tea bas > 122 panto bh 2] FRSTSTRRUPSLOULDEEPLICED FROM COLON FACE &REVANNGSTRRL? SHOULD BE ee cio [SHOWN AS ABOVE. ~ top and bat bars) 1) SLAB END REINFORCING DETAILS: ® © 18 15 ©) SPECIAL REINFORCEMENT AT EXTERIOR CORNERS (OF BEAM SUPPORTED TWO -WAY SLAL Bottom bars Us, t Lo seaw i ap bars ‘AS POSITIVE REINFORCE |IENT | oenw Longer clear span 6. HOOK , ANCHORAGE & DEVLOPMENT LENGTH: 2) HOOKS OF REBAR: FOR ALL RE-BAR: PROVIDES" STANDARD HOOKS (BENT) FF NOT SHOMN IW THE DRAIN ) DEVELOPMENT LENGTH: ) END HOOK OF STIRRUPS: y Tae x De Mocabecdecn sandy ppcagecepeaeey ai | ENO HOOKS OF STRUPS ARE LOCATED ALTER seam, OTmO8E =a «emma SECTION -AA dd) STANDARD BAR HOOKS 1) munneneoncent i) sma remrorcener 7. DUGT DETAILS: _STIRRUPS AND TES. 12a Sn BAROR SHALLER AL BEAM ANO SLAB RE-BARS SHOULD E EXTENDED INTO THE SUPPORT UPTO DEVELOPMENTLENGTH PLAN OF DUCT 6 S.CONGRETE CLEAR COVER FOR REINFORCING BARS: Venter [locaton or conan] DEC] Fe «) SPEGIAL BEAM COLUMN DETAIL se 1 Fetes oto y id } 3 | sen ae 75 1 \ Faratee! | 2 Hoxi3 as comm Le = 4 | souan tel | 4 — Puss indoors tace an Np, ae & boom He beam = 4 londoorstece: |. / x me soca coum om rs ans a 7 Uoenaace anor ae ‘s 9. JOINT DETALL, os : a) BEAM - SLAB DETAIL otek BEAM SLAB DETAIL, ttc toa at se a : Ut - pte oxen tee ; en font > Fontana 13, EARTH QUAKE CONSIDERATION ) PLAN OF COLUMN & BEAM JOINT REINFORCEMENT PATTERN: Gee a) LAP_OR DEVELOPMENT LENGTH (SPECIALLY FOR EARTH QUAKE CONSIDERATION UNLESS OTHERWISE ——I TONED IN THE DRAWINGS, LAP LENGTH OF BARS SHALL BE: COLT BRDATT ESTO TAT COMPRESSION [hee 44 — coun VERTICAL ReMFORCENENT Trop aaRs 2a] BOTTOWBARS (8a) ALL BARS (8) z w © © a © BEAM STRRUP zw © |__ aw atau rewroncenent a + = oe 10. MORTER RATI ae 2) PLASTER MORTER RATIO: 1:4 "GOR WELDED LAPPING LENGTH: (D=BaR OW) b) BRICK WORK MORTER RATIO: 1:4 b) FOR SEISMIC CONSIDERATION MAXIMUM 60% LAP SPLICE MUST BE LOCATED WITHIN CENTER HALF ‘1. CURING OF R¢.C WORK (OF LENGTH IN EACH FLOOR. INCURING TIME MNRAL 21 DAYS (UI 1) METHOD OF CURING: OTHER WISE SPECIFICATION, ) FOR SEISMIC CONSIDERATION ALL TIE BARN COLUMN MUST BE BEND AS SHOWN IN FIG, 2) HORIZONTAL SURFACE BY PONDING OF WATER 1b) OTHER SURFACES - BY WRAPPING MOIST JUTE FABRIC AND SSPRINALING WATER BY HOSE PPE FREQUENTLY, 12, SCHEDULE FOR REMOVING FORM WORK: A)VERTICLESIDES FOR BEAM = 48h i) CON =72h o byBOTTOM SIDES: ALLOW MINIMUM ONE DAY PER FEET OF BEAM SPAN LENGTH BUT NOTLESS THAN 10 DAYS. 4d) STIRRUP & MAIN BAR MUST BE KEEP IN RIGHT ANGLE, 6) SLAB: MBIUM 28 DAYS. TRISTAN SOREN [SE 14). SCHEDULE OF LINTEL Width of lintel Clear span Size & Rebar retina 15). SOME SPECIAL NOTE : 5 € [L mnseece 1 1. RENFORCEMENT FOR FALSE SLAB ARE mms‘. Zid C 2.ALLFALSE SLAB THLKNESS ARE 8° UNLESS NICATED. 5 6-1" to ae | sma @érce 3. ALLFALSE SLAB AND LINTAL BOTTOM (WITHOUT LFTCORE LIAL) 17.1" ABOVE FROM FLOOR LEVEL OR AS PAR INSTRUCTION OF ond ARCHITECTURAL DRAWING. 10" € |} tomoaese | att oursoewensunwenr or ase stanmusr REECE | we FROM ARCHITECTURAL DRAWING or) . M4" to 9! ‘ | somagerct 10° 6-1" to 9 4 10° Fann 5 * ton gsc gonna 16, SECTION REINFORCEMENT DETAIL OF PARAPET WALL: _-— SEEDETALZ (TEN 26 couuNn f 4 ( PARAPET WALL a, PART CROSS SECTION OF PARAPET WALL ‘7Expontonjont amma gece 2s pipe ‘1 Extra Gen SECTION: 04 PART LONQTUGINAL SECTON OF PARAPET WALL Serene DETAIL: Z © sone ees - +4 \ ace! = Tet 3 PLAN OFZ VERTICAL SECTION OF PLANZ pope $B GENERATOR BUILDING 1 = os NOUTPLA sat ‘SHORE PL © = sie recor erp unaorrtees 905 ONICTINE 301440 E ij | 5 ; a 7 |. a 5 ef A ONICTINE 301440 TIE BEAM (20°X20") ROAD LEVEL(0-0") 10mm @ 3 cle iA Ag 3| SECTION: AA ezine 10-20mm@ ue tommo @ 6" cle ey we OREDGE qty SECTION: 5-5 a -— 8-20mmo =| EE 10mm @ 6" o/c "|B re ; Fa ston 1. YELD STRENGTH OF STEEL t= (60,000 & 2. CRUSHING STRENGTH OF CONCRETE = (2000) [— 2*Clear Cover MIXING RATIO: a =} aoa 143 (CEMENT: SAND SHINGLE +hu z 10% SYLHET SAND (FRO2.5) g oint@ eee SECTION A-A ont tee ra |r—4 An iol 48 LONG SEC OF TIE BEAM 1 OF SHOR UE o> > cunowanreasoananoun PENCE WAS aLRED MONEE siemens memccnen [iggsecrovar semen [emmamn | gag ;——_TIE BEAM (20"X20") [ TIE BEAM (20"X20") 4 A I\ ine t \ i i i & 10.9 a [> SHORE PILE |7>—— SHORE PILE 4 Lad SECTION: X1-X1 (FIRST PHASE- EARTH EXCAVATION ) NOT TO SCALE ‘SEO TR RET PASE AT TIE BEAM (20"X20") [—— TIE BEAM (20°X20") rh [-—— suore PILE [-—— SHORE PILE 4 U U U U SECTION: X1-X1 (SECOND PHASE- EARTH EXCAVATION SE 1 SENDA S18 s7 ‘COL AVOUT PLAN ep a ‘COLUMN LAYOUT PLAN COLUMN SCHEDULE = | onan OAR “WORDT E NOTE sam0 ans ESE a i ibe P98 iG 2) ena fers Si, TAD cis Pat Fo, Endy al Pa re Fass il eal Sag niood aa pital zm e na gee 1We=3sinpaoceurn ste tense eee 2) 153 wh Sm an 508 ear inn =) ecg 6 2 ai et acon tien 008 tend m8 ® 7 7 CER COER 8 S rns eat | AAT FOWDANDNAS HOM SECTON cn Sana se San ia. oi Le an ‘ediond te ‘ediend Sars a ‘onc trnage-e—e ostin-+ ASE. 520M ROB SATE Aatns, DROP AL 1 sng 9 1 sen = june caom wares ws tans 2328000 ution 2xaim9 Hint eaTCA ML ry ry ye sue. ond @ 0 " B B- ‘OPER NEAL TES OSE OROSONOF CONCRETE ERE vncmoeso Om BULUMG Mr esDaWacon Jota WAOOTAATED TRGENFET Teaas anes aarmaan| an SONEDAE Sr ne ERATOR BUILDING 1 a I! 1 I PILE LAYOUT PLAN ONICTINE 301440 S19 Nal «ile 716mm Joma @ 4 ge +) Renoraement Deformed br -=72,000 psi (72 Grate) ay senna 2) aspng of rence required should eof 40 (O= tater fat C3 3) R.C.C. Work: Mix ratio (1:1.5:3), 3000 psi (21MPa)with 150mm slump 20" 2 3* Clear Cover 4) Concrete cove = 75mm Lave | 160 no 88 nu 5) 2 Tack welding for every pitch of welding ‘SECTION: AA le 6) Use 100% Sylhet sand (Minimum FM=2.5) as fine aggregate Ad 3/4 own wel taded shingles to be sa as coarse aggregate 7) Yoomm CC Ciel Block Or 2.5 Stel Chai with wate proot tae 716mm —_ —_ should be used @ 3000mm (3 Nos per point). L 10mma @ 7" —_—> ——— 4) Tolono hevinmepge sol be equ he nth oil ¢ @ J ten d 4) During vibration of rimme pipe the height of fll should be not mare than 150mm. Clear Cover um 208 | sora 8 @ ele ‘| somn8@ ee SECTION: B-8 “ue AD ai At 4 7.6mm 5 9-20md 9-20mma a20mma we BAL on wolf os 10mmB @ 4" c/e a ny alter Every alternate } ,| mesctwees a) bested 3" Clear Cover SS ar clear cover " 8 20 SECTION: AA SECTION: B-B a tonne q kone eo ae 10mm 6 @ 4 oie * onm 8 @ zs DAU Areasounnaim POE vow LED meee i taTENT AE Se OFFICE BUILDING aa san soueoute BOTTOM BAR a ttona geen cernagoros paososen ET» GULON AT ADOANANoUN [PEXESE WASHISLAATED ACHEVPELT, See Te ee KADDA BAZAR, GAZIPUR SADAR, GAZIPUR, Serene sn (BOTTOM LAYER) slaly ot E ~ le 5 35 Hey aay alle Hifi (TOP LAYER) {T FOUNDATION LAYOUT PI 20mmo @ 6.5" ofc 16mmd @ 4" ofc 3" Clear Cover 5.0" 4.0" on 5 1ommd @ Bro/e 15" ol 40" foal . Tommi @ 10 ae 12mmd @|FEe—| 3] 12mm @ 7" o/s 10mind @ 3] {2 5" clear fawer—) venma @ 5c | soamg QE) 8 12mm @ 7" efe 1-16mmd ext/gap: 5 16mmB @5" c/e Fefe]| io] 15" af 3 — 16mmB @ 6" c/o b/w 10" m =| 7 Jemm@ @ 10'elc- temo @ Helo S| a t— er 12mmB @ Tele Tommd @ Ge 1} 2.5 Clear Cqvor 16mm @ s*e/c. a 1ammO @ B'h/e Fd 12mm@ @ Tele 1omn@ exisap a 20mm @ 5.5" cle bw a tend @srele tomma}@ e'cle 15" S| - 3| - | Section Of Retaining Wall 16mmO @ 6" cle bw cna wasn LeneD TRGENFET SS GENERATOR BUILDING GRRE ONICTING 301440 : | z 25 A} Lawegeack owe Lnnaweeck | Lentueet—“ snoi » a tt | | og a 28 ae i § GENERATOR BUILDING ONICTING 301440 eet 168" test 0 i 2) g 9 GENERATOR BUILDING S29 Fairs" : El 5 = 5 5 z s et L aed — tara aeack | binterss a> an maar xadoanancun, PEERS WASHING RATED REED Sc cone amAneR foe Sa 1 amaseak a 6 Jenene vase urate ARETE wasms [ove S31 brmnaaerecd teas @ toe sabe + 10 ' ts ' : : | Tn | | i lames | L . | _ Lomas coek—iomter hime rat | hmdscesk—omts es "En & secrowse ws es Feats | sin o coed imag ret ome Eve ee} Seon oF ae Fe cose tm eulLoIe at xaboa NaNbUN 18 was UNITED res = DEAT eae Aas 97 ' I SECTION 1, 18-6" 19.0" I oe TOT gains ‘fi site ON 1918 Jenene vase urate EET AVA nich AS 333 GENERATOR BUILDING REINF. DETAILS OF BIO REACTOR TANK FLOOR SLAB (BOTTOM LAYER) (LEVEL +18: S34 i 3 eet 168" test 0 i 2) g 9 GENERATOR BUILDING (22168 nto + E 3 g Foigze0) 16" 16 ei Boe ee 1 i i 1 i i oo v St v SI vorD S vo oo) oo 6 8 E & fal 5 oF ra o 4 Faia{i3204 FBTA{IN20y FBT >204 FBLA 10 REACTOR TANK FLOOR ROOF NAKET BEAM LAYOUT PLAN (LEVEL +32" FBTAPN2O4 Pao 7 BLILDIG AT KADOA NANOUN, |CENESIE WASHING LATED a ee cummonson =~ Aer _] mission ac a WET $38 Se towed | Limon orb Liner te SS rN 1s. otc “He tt Ll Jenene vase urate OEE Toc AN sar se 1 stetgra—Lietacal > Naar kaso nancun, PPESHE WASHINGLRATED Showasewoucencoy S38 2 mt@ ee it bunt a ree na ¢ sk 1 5 t nots 20 TT sno SECTION 10.8 ‘ma SEP bite ont 4> ow or wears 00" fsa Cott dann s-39) t a2¢ t sett = | f 2aesatn aonb | —ssirdeen = comes. ED sets 2| tons ati 20 | sr 3 » sear se esnes20) 1 { SECTION 26:26 tu torment 4 s-40 GENERATOR BUILDING iona0 Fane tor 8 ff TIITERBSROY g f] & (] z EB E ses a Et wae Ta & & ui ui ANOXIC TANK FLOOI |AM LAYOUT PLAN (LEVEL +: ASN LATED S42 | fi in 4A joe, t wageet | Lonaesk 4 Piscaaead | Loetorsd unsere Titworad | dunorack Luraaved | cod Jenene vase urate REED Snot Rosner TE inom Sag ye fy 20-28 + i J image FLimaaciek spate teers o> saa toma ws bose Lineage —t rams edt i te 4 a wo 0 ” samt secon S45 = ¢ g z Ss 3 2 Z| Ss 3| 2 z & E a 3 : S i 3 i z| i s H = a 5 j s a a i S47 eet (0) toon etn 2 16onBeesn ret et S = = INF. DETAILS OF ANOXIG TANK FLOOR SLAB (TOP LAYER) (LEVEL UNA ANGLE seat { es wee Ty rt Oo A Wes arbre | | i as FE? |] sescmuce | ui oovste 20 Manhole fj None TANK. ANOXIC TANK, TEMPORARY TUBE SETTLER WALL LAYOUT (LEVEL +4: F aonu arsasonnamm eH WAOHNO LRAT OEE Sar eres seaman | RUETAGTGR Raha [oes eae tes ® 16" § 16 6 183 7 eo Poe 166" ' ' tO | ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' 4 a L _- i | i f I iT gl Hl el ey =| # yoo : a i ny “ Bi ei i i Ht Hh vor ‘4 | Te. b BTN 1m 7 g ovo & vor sae vor Bl B von BY sm BF _oneaune Bt 5 BOL a & aN ANOXIC TANK FLOOR ROOF NAKET BEAM LAYOUT PLAN (LEVEL +49" re 2 auona arkacoanancun, [PERE ASWELraTED Showansewousencoy —— ee UNTO ay S48 t [at auf anes ate ni9r Lrenseiel | Lwaueyt sett —bintovad | Lontovsel a on store scwran sna a ok | Lonsacad mace + I a (O (Ge = Tt we t aa | Pinsent | chia cack | an S49 2 nots 20 TE sno SECTION 41-44 Lowes omtaies fe cor F ls 7 | res @ et | Pog SEcTON oF BeAMBAA S820 ot | a 2 or a secrion aa. & artis grec E samt & SECTION 45-45 1 sid ee Feaizen) Ae aaa I ELITES REISE a DETAILS OF ANOXIC TANK FLOOR ROOF SLAB LAYOUN (0) ona @ lsat 1ammd @ 8" cfc 12mmd @ 1émmd @ 8 o/c 12mm @ 6" ofc 10 oe 16mmB @ 4" fe 10mmd @ 8 o/c Bio Reactor Tank Slab 12mmB @ 8 12mm @ 4" ofe SECTION OF X1-X1 m1 hor 10mm 12mmB @ 4" ofo 1ommd @ 8" efe Anoxic Tank SECTION OF X2-X2 seco FEARS VAL, -——1-10mmd ext.top/gap -——1-10mmd ext.top/gap 10" V, Ommd @ 6" c/c alt.ckd 12mmG @ 4" c/c. 12mm @ 8" c/c 10mmd @ 10" c/c 10mm@ @ 10" c/c p— 12mmé @ 4" c/¢ — 12mm @ 6" o/c A= L_RB1 12mmg @ 4" c/c SECTION OF X1-X1 DOMESTIC WATER TANK 12mm @ 6" c/e 10mmd @ 5" c/c 10mmB @ 8" c/c DOESTIO WATER T Sy RBS 22H ne ca bana som @ | Tone @ SECTION OF BEAM-RBI-(1220") 18-6" i" ‘to i end ws 12320") btiona se + $§tonra oe oe ION OF BEAM-RB2-(12%20") L 7 RIED] EINE. DETAILS OF DOMESTIC BAR SCHEDULE WATER TANK BOTTOM SLAB — . (8) 12mm @ 4" cfo(TOP & BOTTOM) S| (8) 1amm@ @ 6" cfeTOP & BOTTOM) cmv cxese wasrwo Lane RGHENTELT ons wewst maaan | ERF-DEIALSOF DOVEST [mane ne ATER TAME BOTION SLAB

You might also like