You are on page 1of 4
Joint Site Inspection (JSI) To be filled by Applying Contractor (Indicate NA if not applicable) Site Inspection Date Dg oa dedy ‘Site Inspection Time {qeo SE Pa Lowel ull tik pty, ‘ject Olieer - Name! Division (AS ote) (GAG Work Permit Number To be filled by CAG ME Contractor (Indicate NA if not applicable) Jatected Fre Alarm Panel (ra SA GAP- QIAN S fected Fre Alarm Zone ac ev ec) a nee rected System (an Oana Son) iCoeemeS Tenia eS | tected Fire Alarm isolation Time tim) From 400 Am mo bow pm Bilateral Agreements (CAG MAE Contractor ‘Applying Contractor ‘Company Name Byae Asiapac:tontracts Pte Ltd Contractor Name Pe Flaye tate Tan chee Boon Emergency Contact Number auanty 99.49 3413 Signature & Date PLR)» vs Vega [o/a¢ V Please note 1. All fields are compulsory to be file, 2 Applying Contractor shal provide Work Site Drawings! Plans to CAG M&E Contractor to identy the affected isolation location and zoning 2.A joint physical site check must be carried out with CAG M&E Contractor fo ensure that the requested fre alarm zone to be isolated is corect before recording the zone label n he JSI [Under Renovation Requirement p.9 69) 4 Both CAG MBE Contractor and Applying Contractor shall endorse and bilaterally agreed on the isolation declared details 5. No concurrent Isolation of Fie Detection and Protection System within individual work area unless approval granted by EADIFM and AES. 6. CAG MBE Contractor has the night to inform Applying Contractor to change their isolation request date/time and to REJECT those (1) Incompleted JSI, (2) Without Work Site Drawing’ Plan and or (3) Based on other te safety reasons 7 Allcompleted JSI & Work Site Drawings’ Plans is to be uploaded to online application system in itps/0e.changiarport com irae orator Nlow Eses Pome reel to dolate fe Done th GirewodCn V6 - October 2028 Joint Site Inspection (JS!) To be filled by Applying Contractor (indicate NA if not applicable) i peston Dae [ dg-03r des SUSIE repeater TR 7 geo ‘CAG Work Permit Number “To be filled by CAG M&E Contractor (Indicate NA if not applicable) Sena ER Ara RARE GHP 205 —_| secog Fre Alam Zone uc ov ere) ere al [itfected System (art om Amoke detector AtecesFre Alam oaton Dae wm [FO O1- 05 rdo.duy fe Q)-02 -Jodu [Aftected Fire Alarm Isolation Time s From Coo Am ib © bow pry Bilateral Agreements (CAG MAE Contractor Applying Contractor —< a ‘Acinpac-Contracts Pte Ltd Contractor Name P-Flayetesta | Tan chee Boon Emergency Contact Number 91193 baby 99493444 Sena sone PRUE a6 Ia hy 22 /a/oy Please note: 1 All fields are compulsory to be filed, 2 Applying Contractor shall provide Work Site Drawings/ Plans to CAG MSE Contractor to identity the affected isolation locaton and zoning 3.A joint physical site check must be carved out with CAG MBE Contractor to ensure thatthe requested fre alarm zone fo be Isolated is correct before recording the zone label n the JS! [Under Fenovation Requirement p 9 69] 4 Both CAG MBE Contractor and Applying Contractor shall endorse and bilaterally agreed on the isolation declared details 5. No concurrent Isolation of Fire Detection and Protection System within inlvidual work area unless approval granted by EADIFM and AES. 16. CAG MAE Contractor has the right to inform Applying Contractor to change ther isolation request date/time and to EJECT those (1) Incompleted Ji, (2) Without Work Site Drawing’ Plan and or (3) Based on other fre safety reasons 7. All completed JS! 8 Work Site Drawings/ Plans is 1 be uploaded to online application system in /nps:/c.changlarpor. com [ore iomanon low Exes 2one Apu, Eee Zee 22.Li- 02, wtteed to totale ue Done th Gireworlar V6 - October 2028 2 LE ROTM ASIAPAC Joint Site Inspection (JSI) To be filled by Applying Contractor (indicate NA i not applicable) Aj. ca aay Site inspeation Date Sie fspecton Time 1900! ‘Site Inepection Lobation (Wok Areas Ha Vovel-) Guth Riyhe park Projet Officer Nariel Divi AG One (CAG Work Permit Number To be filled by CAG M&E Contractor (Indicate NA if not applicable) Attected Fire Alarm Pane! Sap 259 Jatected Fie Alarm Zone \Ac\ cv Eze Rete) te Lela Lup Smsice cleten for = fected Fre Alam isolaton Daten [POT 0. Lod Qi-03 -aodu [Afecied Fre Alarm kolaton Tine [Fem SSoeker te _obos Am Bilateral Agreements (CAG MBE Contractor ‘Applying Contractor Company Name Eagle Asiapac Conkcacts Pte ltd Contactor Name Pace cones Tan Che Boon Emergency Contact Number Gus3bey 994739443 Signature & Date Please note ASME oe Newoene 1. All fields are compulsory tobe filed, 2 Applying Contractor shall provide Work Site Drawings/ Plans fo CAG MSE Contractor to isentty the affected isolation location and zoning 3-4 joint physical ete check must be carried out with CAG MBE Contractor to ensure that the requested fre alarm zone to be Isolated i correct belore recording the zone label inthe JSI [Under Renovation Requirement p 9 69) 4 Both CAG MBE Contractor and Applying Contractor shall endorse and bilaterally agreed on the isolation declared details 5, No concurrent isolation of Fie Detection and Protection System within inavidual work area uniess approval granted by EADIFM ang AES, 6 CAG MBE Contractor has the right to inform Applying Contractor to change ther isolation request date/time and to REJECT those (1) incompleted JSI, (2) Without Work Site Drawing/ Plan and or (3) Based on other fre safety reasons 7 All completed JS! 8 Work Site Drawings! Plans is 10 be uploaded fo online application system in inis:/cc.changiairport com irre iarmaton Now Byes Done fo -li-02 Need te Ysclste the Jone In Grewertor, V6 - October 2023

You might also like