INSTALLATION INSTRUCTIONS Main Tools Include Large push cutter, Infrared ray level instrument, Panel lifter, Screw driver, Wax wires, Level bar, Adz- Nail, Pencil, Flexible rule, Pedestal adhesive, Tool bag, Broom, etc. eye Hammer, Position Datum Point 1. Proper datum point can avoid the waste of room, the best choice is to set the intersection point of two walls which are rectangular as datum point. If there is a ramp at door, or space for door to swing, the best datum point should be near door. 3. If designing or partition drawing has marked datum pointit can be considered as final ‘00m snstall Dizection Vertical line Notice ‘© Datum line: A straight line paralleled to datum line,the longest distance between datum level and datum line is 600mm © Datum levek It is a wall which owner requires to be installed hole floor panel. ‘© Vertical: Its a straight line which is vertical to datum line. The largest distance between the vertical line and adjacent wall is 600mm. Raised Access Floor Installation 1. Atfirst, leaning the ground. 2. Observe the layout of room, instal infrared paralleled scanner, mark paralleled line on half waist of wall, then find the lowest and highest point, calculate average value from ground to floor surface (this average value equals to owner's required installation height), calculate and adjust the pedestal height. 3. Choose a comer as start point, find a parallel on wall, tie two paralleled wax wire 600mm from wall, two wires must be vertically distributed. ay 4, While pulling the paralleled line, screw the four pedestals. After confirming the height and placing the first floor, stringers and pedestals must be fix with screws, use level bar to adjust floor, at last, lock nuts on the pedestals 5. When the first floors adjusted paralleled, vertically place two lines of floors in the direction of wax lines. Note: black glued edges between floors must be aligned and straight. 6. After vertically placing two rows of floors, find a direction (cannot be vertically placed), paralleled place row by till the last row, Note: each edge should remain one row for final cutting and placing, while paving, floors cannot be bended which may affect flatness. 7. After placing last row, iron angles in each corner may be firstly fixed, then cut all-round floor. Normally floor of last row should be cut, the cut side can be put on flat head pedestal directly. Noted: iron angle should be paralleled to installed floor. Backing if iron angle should possess a support (flitch or angle ban, & After fixing iron angle, precisely measure the size of floor, then cut and place it. If need placing plug, use cutting machine to open holes as per actual dimension. 9. After placing floor, check on time, adjust the parts which are not flat, Finally fill in. gap when cutting with glass cement. 10. Ifthe temperature difference between day and night at construction site is big, (high altitude, temperate area or arctic are), all the edges should remain 3mm gap. Check & Acceptance After placing all floors, check whole project carefully and improve all the imperfect parts. + When walking on the floor, no noise, no movement and good stability + Clean surface, clear pattern, mean color and joint, straight edged, no crack, no corner dropping, no lack of edge etc. © All materials of joint edge and dimensions should follow design requirement and construction regulation,

You might also like