You are on page 1of 1

WORK INSTRUCTION

To Order : PT Sucofindo Up. Lahat


Date : 19 Jan 2024
Area :

DOCUMENT
No WORK DESCRIPTION PARAMETER BASIS/UNIT STANDARD DESCRIPTION Prepared By :
ISSUED
1 Stockpile Sampling 22 Jan 2024 : TM Ar ASTM One lot per Location 1 Original and 3
- ISP Mas 1 Lot Crushed Coal IM Ad ASTM Copies
- ISP LDP 1 Lot Raw Coal Prox Ad ASTM
- ISP 107 TS Ad ASTM
- ISP 36 1 Lot Raw Coal
GCV Ad ASTM
- Port SDJ 1 Lot Crushed Coal Up Stream
SIZE -2.38 ASTM Moh Alamsyah
- Port SDJ 1 Lot Crushed Coal Downstream
- Port WBS 1 Lot Crushed Coal SIZE 2.38 ASTM
Approved By :
- Port FMS 1 Lot Raw Coal SIZE 32 ASTM
Crushed Coal
- Port RMK 1 Lot Crushed Coal SIZE -50 ASTM
SIZE 50 ASTM
SIZE 70 ASTM

Yudhi H. Kusuma
Others
Report To :
sunarno@adaro.com
yudhi.kusuma@adaro.com
moh.alamsyah@adaro.com
thatit.aji@adaro.com

You might also like