You are on page 1of 3
NEW. Sched of ates 2016 = = - = Ib 8 i ino] Admins], | Skea Sea Taon fm “amr | | Mica Pa § Root Floor Roof __| Floor j 7 fon Sa [ Se to| 270309 Se frumsea 2a aust ae [> fe set [assent sro teres] | © ftomewre poe | tonal aoseo00 [Necnimora | gee pease ot Bost] 18185 009 a So at 20583.00 fiat se | anol —sseoa|—arrsee | @ f-onetim | Sem | aasazanl “aeraca | «fe sat =e “Reto aso ° ape sett} — ee ee Provoke [gee faze} sec & |Phomehing 10-ajzunHesoTo [22 e8.cof a Pughoboto q 21121.00} Treat | i oe wee Administ Be istrative st No| an unit | withcGt [ Ground st No| Pre e unit | with CGH as ound | ist oor || ty a1 20378.00) _21520.00| 1909900 y Sea 21574.00) pal lami Sqft [1894.00] 2000.00] a [wom Saft _| 2005.00) | oe Sem [21194.00| _ 72381.00 00} ‘Sam | 19848.00| Sait [1970.00] 2080.00] S| Sqm | 20787.00) _ 21950.00| a oe Saft "1932.00| __ 2080.00] 7 ; Sqm | 20563.00| __21735.00 jakhamna Sak_[ 1913.00] 2020.00] Sqm] 20175,00) __21305.00] Ls pec sqft | __1875.00| 1980.00] Sam 18217.00| _18690.00 ue p pare Saft 71693001 1737.00] _ 1560.00]. sqm 72581.00| _19064.00| _17122.00) 2 — sf 727,00] 1772.00] __ 1591.00 | erase: ; SL 18581.00| _ 19064.00] — 17322.00" © [Meaiipnema | 22-7 —Sypy7 90] 1772.00 | ¢ |chozuba a Sqm 73881,00[ _ 19064.00) ri | som 24105.00| 2658.01 # Penne Sah [7 1727.00) __ 1772.00 | 3 ye sah | 2240.00] 2206.01 ieee Sem | 18399,00] 1887.09] aT Vetizamni Sam_[ 2243400) 2108.0 Saft [ 1710.00] 1754.00 Sqit | 2085.00] 1980.0 Sam 20379.00] —_21520.00] _ 19082.00 Sem | 25609.00] 312580 Baas Sah | 1894.00] — 2000.00] 1775.00 il Saf |_2380.00| 2905.0 ; Sem [1194.00] _22381.00| — 19863.00 Sam | 25865.00| _ 31571. hn aie cea [ 1970,00| 2080.00] 1846.00 eo Safe [ 2408.00] 2934.6 2 line sam_[ 201.00] 713053 72008.00} 1} < lpungro sqm} 2612.00] 31883.¢ rE Sa [1875.00] 1980.00] 1757:00 Sait [2428.00] 2963.1 ves2018 sh 1 |Site levelling and approach road 10% | 2 ter supply and sanitary [7.50% | 250% | 750% | i5%whthattached | IRON toilet and 12.50% for nmon tollets to 3. internal Electrification 12.50% 4 external Electrification SH 5 [Rain water harvesting C 1% -} 6 [Consultation fee (as & when 3% required) 2% ‘On the total cost of all other items 3% Deptt. Charges 13% [Above items |_]__ Block with CGI_| Ground as Floor Sam =| 20403.00} 21703.00] _ 19153.00 -a |MoKOKcHUt ees Saft 1896.00] — 2037.00] 1780.00] » [Mangkolemba Sqm 19789.00] ""21052.00] "18578.00] (ERY. ) Engineer-in-Chief (NPWD) Nagaland:Kohlma 5 PWD: Schedule of Rates 2016 LAS sect Gado

You might also like