01 Metrado Estructura Ss. Hh. Huayllayocc
01 Metrado Estructura Ss. Hh. Huayllayocc
01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL 76.90 M2
SS.HH. 1.00 9.10 8.45 76.90
CORTE 2-2 EJE A TRAMO 1-2 1.00 2.55 0.40 0.60 0.61
EJE A TRAMO 2-3 1.00 2.55 0.40 0.60 0.61
Entre A-B TRAMO 1-2 1.00 1.15 0.40 0.60 0.28
Entre A-B TRAMO 2-3 1.00 1.15 0.40 0.60 0.28
EJE C TRAMO 1-2 1.00 2.55 0.40 0.60 0.61
EJE C TRAMO 2-3 1.00 2.55 0.40 0.60 0.61
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
01.02.02 EXCAVACION PARA ZAPATAS DE 1.00m A 1.90m DE PROFUNDIDAD EN TERRENO NORMAL 13.07 M3
ZAPATA ( Z - 1 ) Ejes 1 y 3 - A y C 4.00 1.00 1.00 1.30 5.20
ZAPATA ( Z - 2) Ejes 1 ,2 y 3 - A,B y C 5.00 1.10 1.10 1.30 7.87
CORTE 2-2 EJE A TRAMO 1-2 2.00 3.30 0.13 0.10 0.08
EJE A TRAMO 2-3 2.00 3.30 0.13 0.10 0.08
Entre A-B TRAMO 1-2 1.00 1.55 0.13 0.10 0.02
1.00 1.15 0.13 0.10 0.01
Entre A-B TRAMO 2-3 1.00 1.55 0.13 0.10 0.02
1.00 1.15 0.13 0.10 0.01
EJE C TRAMO 1-2 1.00 0.63 0.25 0.10 0.02
TRAMO 1-2 1.00 2.50 0.40 0.10 0.10
EJE C TRAMO 2-3 1.00 1.40 0.25 0.10 0.03
TRAMO 2-3 1.00 1.90 0.40 0.10 0.08
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
01.02.05 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML 23.69 M3
1.00 18.95 1.25 23.69
01.02.05 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML 23.69 M3
1.00 23.69 23.69
CORTE 2-2 EJE A TRAMO 1-2 1.00 3.30 0.40 0.50 0.66
EJE A TRAMO 2-3 1.00 3.30 0.40 0.50 0.66
Entre A-B TRAMO 1-2 1.00 1.55 0.40 0.50 0.31
Entre A-B TRAMO 2-3 1.00 1.55 0.40 0.50 0.31
EJE C TRAMO 1-2 1.00 3.30 0.40 0.50 0.66
EJE C TRAMO 2-3 1.00 3.30 0.40 0.50 0.66
Entre B-C TRAMO 1-2 1.00 2.30 0.40 0.50 0.46
Entre B-C TRAMO 2-3 1.00 2.30 0.40 0.50 0.46
Entre 1-2 TRAMO A-B 1.00 0.60 0.40 0.50 0.12
Entre 2-3 TRAMO A-B 1.00 0.60 0.40 0.50 0.12
Entre 1-2 TRAMO B-C 2.00 1.55 0.40 0.50 0.62
Entre 2-3 TRAMO B-C 1.00 1.55 0.40 0.50 0.31
CORTE 2-2 EJE A TRAMO 1-2 1.00 3.30 0.15 0.40 0.20
EJE A TRAMO 2-3 1.00 3.30 0.15 0.40 0.20
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
VER CUADRO DE
01.04.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 89.76 KG
METRADOS
01.04.02 COLUMNAS
01.04.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 2.13 M3
COLUMNA ( C - 1 ) EJE A EJE 1-2-3 3.00 0.25 0.25 3.45 0.65
VER CUADRO DE
01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/COLUMNA 435.13 KG
METRADOS
01.04.03 COLUMNETAS
01.04.03.01 CONCRETO EN COLUMNETAS f'c=175 kg/cm2 0.74 M3
COLUMNA (CA - 1) EJE A TRAMO 1-2-3 2.00 0.15 0.25 2.95 0.22
EJE A TRAMO 1-2-3 2.00 0.15 0.25 2.35 0.18
COLUMNA (CA - 1) EJE C TRAMO 1-2-3 2.00 0.15 0.15 2.95 0.13
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
VER CUADRO DE
01.04.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/COLUMNE 81.22 KG
METRADOS
01.04.04 VIGAS
01.04.04.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 4.51 M3
VP 101 (0.25 x 0.30) EJE 1 TRAMO A-B-C 2.00 3.11 0.25 0.30 0.47
2.00 Area 0.09 0.25 0.05
EJE 2 TRAMO A-B-C 2.00 3.11 0.25 0.30 0.47
2.00 Area 0.09 0.25 0.05
EJE 3 TRAMO A-B-C 2.00 3.11 0.25 0.30 0.47
2.00 Area 0.09 0.25 0.05
VS 101 (.25 X .35) EJE A TRAMO 1-2-3 1.00 8.15 Area 0.10 0.79
VCH - 101 (.20 X .20) EJE A TRAMO 1-2-3 1.00 8.15 Area 0.05 0.37
EJE C TRAMO 1-2-3 1.00 8.15 Area 0.10 0.79
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
VCH - 101 (.20 X .20) EJE C TRAMO 1-2-3 1.00 8.15 Area 0.05 0.37
VS 102 (.25 X .30) EJE B TRAMO 1-2-3 1.00 7.35 Area 0.08 0.60
2.00 0.40 Area 0.05 0.04
VS 101 (.25 X .35) EJE A TRAMO 1-2-3 1.00 8.15 0.35 2.85
1.00 8.15 0.43 3.46
- 3.00 0.25 0.30 -0.22
2.00 3.30 0.25 1.65
2.00 0.40 0.25 0.20
VCH - 101 (.20 X .20) EJE A TRAMO 1-2-3 1.00 7.95 0.10 0.80
2.00 0.30 0.26 0.16
2.00 0.40 0.26 0.21
1.00 8.15 0.20 1.63
EJE C TRAMO 1-2-3 1.00 8.15 0.35 2.85
1.00 8.15 0.43 3.46
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
VER CUADRO DE
01.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/VIGAS 430.24 KG
METRADOS
VER CUADRO DE
01.04.05.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/VIGUETA 49.12 KG
METRADOS
VER CUADRO DE
01.04.06.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/VIGA CAN 120.22 KG
METRADOS
SS. HH.
LOSA 1.00 2.20 0.75 0.10 0.17
VARONES
SS. HH.
PARAPETO 1.00 2.20 0.10 0.30 0.07
VARONES
1.00 0.40 0.10 0.30 0.01
SS. HH.
LOSA 1.00 2.20 0.50 1.10
VARONES
SS. HH.
PARAPETO 1.00 2.70 0.40 1.08
VARONES
1.00 2.50 0.30 0.75
PLANILLA DE METRADOS (ESTRUCTURAS SS.HH.)
VER CUADRO DE
01.04.07.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/ LAVADER 24.47 KG
METRADOS
PLANILLA DE METRADOS (ACERO EN ZAPATAS)
: MEJORAMIENTO DE INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 36313 LA VICTORIA DE HUAYLLAYOCC-
Proyecto:
ACORIA
Respon. : SUB GERENCIA DE ESTUDIOS - EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : SETIEMBRE - 2010 Distrito : ACORIA
Formula : SERVICIOS HIGIENICOS Localidad : HUAYLLAYOC
LONG. CANT. DE Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL ELEMENTOS VECES
LONG. CANT. DE
ITEM PARTIDA DESCRIPCION TIPO Ø Nº DE VECES Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL ELEMENTOS
LONG. CANT. DE
ITEM PARTIDA DESCRIPCION TIPO Ø Nº DE VECES Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL ELEMENTOS
01.04.03.03 ACERO FY=4200KG/CM2 GRADO 60
LONG. CANT. DE Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL ELEMENTOS VECES
01.04.04.03 ACERO FY= 4200KG/CM2 / GRADO 60
LONG. CANT. DE Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL ELEMENTOS VECES
ACERO
HORIZONTAL
SS. HH. DAMAS Ø 3/8" 1.60 4.00 1.00 6.40
Ø 3/8" 2.01 2.00 1.00 4.02
SS. HH. VARONES Ø 3/8" 2.15 4.00 1.00 8.60
Ø 3/8" 2.56 2.00 1.00 5.12