1 1020 2 EXISTING MINOR (2') CONTOUR
20
10
1010
0
10
102
C-207 C-207
20
EXISTING FENCE
1020
X X X
10
10
20 103020 EXISTING CULVERT
101010
10 0
22
10
10 0 ROW BOUNDARY
1020
1020
20
102
1010
101
0
EXISTING EASEMENT BOUNDARY
100
0
1020 1020 1020 1020
NORTH W-E RD EXISTING PARCEL BOUNDARY
1014
0
1014
99
1020
1020
1020
EXISTING WETLAND
986' 986'
20 30
10
10 990 EXISTING BUILDING
980
1010
990
1020
103
10 0
WEST N-S RD
98
NW BUILDING
815'
815'
20 NE BUILDING
97
EXISTING PAVEMENT SURFACE
MID N-S RD
0
1015.0 1015.0
960
0
1030
1000
10
980 960
EAST N-S RD
20
970
30
960 D D EXISTING DISTRICT WATERSHED BOUND.
10
950
990
950
1 EXISTING SUBWATERSHED BOUNDARY
C-206 PROPOSED BASIN
PROPOSED RETAINING WALL 950.0
10
980
EXISTING STREAM REACH
PHASE 2
PHASE 2
950
30
0
960
97
WATER SUPPLY SURFACE FLOW DIRECTION
ELECTRIC EASEMENT
950
970
950
1030
950
CEC SUBSTATION
1030
960
1026.8 GOTION PROPERTY BOUNDARY
|
P/L P/L
|
|
140'
PHASE 1
PHASE 1
|
0
|
97
|
12
1000 PROPOSED MAJOR (10') CONTOUR
220TH AVE
10
1034
1024
950
2
4
6
0
8
2
6
960
96 PROPOSED MINOR (2') CONTOUR
103
102
10W28 1002
1030
101
101
101
PARKING
102
101
102
102
96
W W W W W W W W W W W W W W W
0
8
0
1008.0
PROPOSED SPOT ELEVATION
SEE
1100C-204 SEE08 C-205
0
1100220
1020
20
200
102 10
2
|
|
10
|
|
|
|
|
|
|
|
|
|
28
|
|
|
10
|
|
|
|
445'
METERING 1017.0
|
PARKING
|
|
|
STATION
|
|
|
6
|
|
525'
02
|
|
986' 986'
|
1
|
960
|
950
|
|
|
|
|
|
|
2
|
10
|
PROPOSED CULVERT/DRAINTILE
1020
|
|
1030
611'
|
2
0
|
2
PROPOSED BASIN
10
815'
4
20 94 PROPOSED RETAINING WALL
| | | | | | | | | | |
SW BUILDING SE BUILDING
1030
10
1010
30
1008.0 1008.0
PROPOSED WATER SUPPLY
10
W W
1020
1030
1030
950
96
1020
1000
1020
WASTE 0
950
960
1020
20
WATER
10
TREAT-
960
990
MENT
950
1004.0
950
960
980
06 REFERENCES:
10 PHAS
4
1030 100
6 100 1006 PROPOSED COUNTY E 1
96 970
4 100 1. PROPOSED SITE LAYOUT FROM "MICHIGAN PROJECT
0 100 1002 4 DRAINAGE CHANNEL GENERAL LAYOUT (ADDING TRUCK PARKING AREA)
103
0
10
SOUTH W-E RD
1002 2023.02.06.dwg", RECEIVED BY BARR ON 2-8-2024.
3
1000
0
1000 BUILDING BUILDING 998 PROPOSED 16" WIDE 2. EXISTING TOPOGRAPHY FROM LIDAR/SURVEY COMPLETED
960
30 998 996 GRAVEL ACCESS ROAD BY DLZ IN NOVEMBER 2023.
10
1030
994
996
10
00
994 992
10
20
992
10
990
10
0
960 (DEPARTMENT OF ENVIRONMENT, GREAT LAKES AND
97
18 MILE RD ENERGY) WETLAND IDENTIFICATION REPORT DATED OCT.
23, 2023.
990 98 970 PROPOSED 100' WIDE
0
EASEMENT BOUNDARY 5. COORDINATE SYSTEM CORRESPONDS TO NAD83 MICHIGAN
0
96
STATE PLANE, SOUTH ZONE, INTERNATIONAL FOOT.
VERTICAL DATUM OF NAVD88.
1 PLAN: OVERALL PROPOSED 1. PHASE 1 TO INCLUDE SOUTHERN 2 BUILDINGS (SW AND SE) AND SITE ROADS, 7. SITE ENTRANCE FROM 220TH AVE AND 18 MILE SHALL BE IN ACCORDANCE WITH
- PARKING, STORMWATER PONDS ETC, AS SHOWN ABOVE. MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) AND MECOSTA COUNTY
0 200 400 ROAD COMMISSION REQUIREMENTS.
N 2. RELOCATION OF COUNTY DRAIN, INCLUDING ALL COUNTY DRAIN
SCALE IN FEET IMPROVEMENTS THAT MAY BE REQUIRED AS PART OF THIS DEVELOPMENT, ARE 8. ALL STREETS SHALL BE DEVELOPED IN ACCORDANCE WITH THE THE COUNTY
INTENDED TO BE INCLUDED AS PART OF PHASE 1 CONSTRUCTION ACTIVITIES. ROAD COMMISSION DESIGN SPECIFICATIONS. THE ARRANGEMENT OF PUBLIC
OR COMMON WAYS FOR VEHICULAR AND PEDESTRIAN CIRCULATION SHALL
3. CONSUMERS
DISCUSSIONSENERGY ELECTRICAL
WITH CMS SERVICES
ENERGY FOR ARE ON
ELECTRICAL GOING. ARE ON GOING.
SERVICES RESPECT THE PATTERN OF EXISTING OR PLANNED STREETS. STREETS AND
DRIVES SHALL BE OF AN APPROPRIATE WIDTH TO MEET THE VOLUME OF
4. DTE NATURAL WITH
DISCUSSIONS GAS SERVICES ARE ON GOING.
DTE FOR NATURAL GAS SERVICES ARE ON GOING. TRAFFIC THEY ARE PLANNED TO CARRY AND SHALL HAVE A DEDICATED