Professional Documents
Culture Documents
Prepared by;
Fadly Mohammad Aldiatama
PT Tambang Mineral Maju based on North Kolaka Regent Decree 540/7 Tahun 2013, dated on
January 8th, 2013 and end date on January 8th, 2023. Production Operation Permit Area is 61 Ha
and has been Clean & Clear.
Flat to moderate region on lowland with slope range from 0° to 16° allows laterite nickel
deposit enrichment if the lithology is composed of ultramafic rocks and the saprolite layer is
thin. Moderate to steep region on hill with slope range from 16° to 20° allows the field
occurrence of ultramafic rock and generally has an eratic ore.
Neutral due to their contact with the soil and rocks, there is a tendency to form a precipitate
hydro silicate. Nickel contained in silicate chains or hydro silicate whose composition may vary
will settle in the cracks or fractures known as garnieritevein and onyx. While the residue
solution to form a compound called saprolite brown reddish yellow. Other elements such as Ca
and Mg dissolved as bicarbonate will be brought down to the extent of weathering and will be
precipitated as dolomite, magnesite, which is used to fill the cracks or fractures-fractures in the
host rock. Vein is known as the boundary between the zone of weathering pointer with fresh
rock zone called weathering root (root of weathering)
6. Area Utilization
Based on 3D Google Earth’s Satellite Map 2019, The Utilization Status of PT Tambang Mineral
Maju is as follows:
Table 2. Utilization Area of PT Tambang Mineral Maju’s IUP
Based on North Kolaka Regent Decree No. 540/7 Tahun 2013, PT Tambang Mineral Maju’s IUP
is valid from January 8th, 2013 until January 8th, 2023. Production Operation Permit Area is 61
Ha. This IUP has been Clean & Clear based on C&C Ministry of Energy and Mineral Resources
Indonesia.
8. Overlay Map
Figure 8. Overlay Map of Contour, Geology & forestry PT Tambang Mineral Maju’s IUP
Based on overlay contour/ slope analysis, geology, forestry, and utilization, PT Tambang
Mineral Maju’s IUP has 50,3 Ha (82,4%) potential area.
Conclusion
This location is approximately ± 401 kilometers from Haluoleo Airport, Kendari City in
North direction with a travel time of ± 9 hours by car (Figure 1). Administratively
location of PT Tambang Mineral Maju IUP’s is located at Tolala District, North Kolaka
Regency, Southeast Sulawesi Province.
Based on North Kolaka Regent Decree No. 540/7 Tahun 2013, PT Tambang Mineral
Maju’s IUP is valid from January 8th, 2013 until January 8th, 2023. Production Operation
Permit Area is 61 Ha. This IUP has been Clean & Clear based on C&C Ministry of Energy
and Mineral Resources Indonesia.
The distance of PT Tambang Mineral Maju to the sea is approximately 1,7 Km (straight)
Based on forestry status map, mining concession area of PT. Tambang Mineral Maju’s
IUP has 35 Ha (57%) of Limited Production Forest Area and 26 Ha (43%) of Another
Usage Area
Based on regional geological map of The Malili Quadrangle, Sulawesi with scale 1:
250,000 (T.O. Simandjuntak ,E. Rusmana, Surono and J.B. Supandjono 1991). PT.
Tambang Mineral Maju IUP’s is on Ultrabasic Complex (MTosu).
Based on slope analysis - Van Zuidam (1983), in general landform (morphology), PT
Tambang Mineral Maju’s IUP has 43,6 Ha (71,4%) area with slope range from 0° to 16°
spreading throughout the area consisting of hill and hillside area, and 6,7 Ha (11%) area
with slope range from 16° to 20° spreading throughout the area consisting of hillside
area.
Based on Area Utilization Map, PT Tambang Mineral Maju’s IUP has 53 Ha (87%) Forest
Area and 8 Ha (13%) of Clearing Area.
Based on overlay contour/ slope analysis, geology, forestry, and utilization, PT Tambang
Mineral Maju’s IUP has 50,3 Ha (82,4%) potential area.
Based on the regional geology, morphology (slope analysis), and forestry status, this IUP
is Prospect. The final conclusion is that this IUP is suggested to be progressed into
general mapping.