Professional Documents
Culture Documents
6 To 16
6 To 16
6 To 16
NooftheWI:A2un_Kum
Name of the
GrampanchayatBaremahebfe Unit cost Rs 8 oaj
Manda Skakulan Recording date 02o5/202
District Soi eaaule DEDUCTIONS
CEMENT STEEL NK Total NET PAYABLE To
MAJERIALS AF Others Dedu rek
TOTAL
567 8 9 10
hs te _ceonfy he l lou
haie bpn ansauck boUz Be t b BLSto a
podardpinh aca tsude peiaien1
eandoetapau emet
Venified & Certified that the above beneficiaries have completed the construction work as per the stage shown at
col. 6 and the house measurements are not less than the standard
measurements. specifications are not inferior
to the standard specifications recorded at page nos.
X of M.B. No
SI. Plot-
No. No
Name of the
Beneficiary
Father/ Husband's
Name
Physi WorkO (Procuredbybeneficiany lorthe next stage)
Bank Physi
eBank
Alc cal Done Name of
(7+10)
CASH
Rs.
MATERIALSA
BAGS VALUE | QTY VALUE VALUE &othersPe0BenefpM
clary FM NK
tions
AF&BC
NK|AF & BC
No Stagee Stage
As pertheQuantity
Material
Value
12 1 13 14 15 20 21 22 23
16 17 18 19|
12 3 4
7 10
Verified &Certified that the above beneficiaries have completed the construction work as per the stage shown at
col. 6 and the house measurements are not less than the standard measurements. specifications are not inferior
to the standard specifications recorded at page nos of M.B. No. 72
Asst. Engineer (Housing)
ead dry e r k
Asst. Engineer (Housing) Section.
Section
84 85
BENEFICIARY WISE RECORDING OF PHYSICAL STAGE OF HOUSE AND PAYMENT DETAILS
of tthe
Name of
DEEK:y D iaacaaaye P
Name of the Coieny Pauivalaye 3 Scheme&Year: BL4C PH:221- uame of the AE 6)ares Lsara leo
Name of the Grampanchayat
Bakemaheke Ueit cost Rs
S0,oL No of
the W
Arun
Recording date
Mandai Sn kade 0S| 202
District ikarulen
DEDUCTIONS TozaNET PAYABLE TO
Value of Matenals at site TOTAL CEMENT STEEL
VALUE wA|onene
Si Plot- BankPhysH Work Prred y berenioary r e ext staz 710) CASH
No No
Name of the
Beneficiary
ather/Husband'sAle calDone |Name of|
Name
Rs. BAGS VALUE OTY ALE ticns NAF &BC
No Stage As perthe
Quantity Value
Stage Matenal 12 13 14 15 16 17 18 1920 21 2 22
1 6 8 10
Venfied & Certified that the above beneficiaries have completed the construcdion work as per the stage shown at
col. 6 and the house measurements are not less than the standard measurements. specfications are not infenor
to the standard specifications recorded at page nos of M.B. No. 472
laurK
Asst Engineer (iousng
Asst. Engineer (Housing)
Secton
Section