TEREX 40T Mobile Cranes Inspection

Inspection Component & Details

2
Inspection Component & Details

the inspection done for mobile cranes We will ensure this by myself
(Khaled Gormi Driving Champion)and the crane operator in charge on
the job site. The safe use of the crane. The parts of the inspection

➢ Crane and lifting accessories certifications update.


➢ General condition of the crane and lifting accessories.
➢ Crane free from any leaks
➢ Boom function Up/Down/Right/Left and Out/ In working
➢ All safety devices are in place and working
➢ Wire rope properly spooled on the winch drum
➢ Wire rope properly fitted on the open wedge socket.
➢ Crane controls are working
3
The Inspection Finding And Recommendations

➢ In poor condition, the hydraulic cooling fan crane does not function
properly.
➢ Wire rope termination is incorrectly installed.
➢ Absence of Lifting Accessories in Mobile Crane.
➢ Lack of proper safety equipment.
➢ Different types of tires and tires in poor condition.
➢ Preventative Maintenance There is a need to prevent degradation of
all crane boom components.
➢ Crane and lifting accessories with expired certifications

4
Wire Rope Termination

Wire rope termination is non load bearing.


• It should be correctly installed in the open
with socket with pull line aligned to the center
of the pin with dead line length minimum 6 time
rope diameter not less than 6’’.
• The drum end of the rope shall be anchored
to the drum, but no less than 5 full wraps of rope
should remain on drum in any Operating condition.

5
Lifting Accessories Recommended In Mobile Crane

Must common accessories used to


Attached the load to the crane
hook are:

Wire rope sling


Chain Sling
Shackles
Hook
Composite webbing sling.