KEC-6.50MLD WTP PROCESS - Malkanagiri. Final
KEC-6.50MLD WTP PROCESS - Malkanagiri. Final
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Design Input
Total Population Considered in 2054 : 73862 Nos.
Daily per Capita Demand at WTP
Design (LPCD) : 87.5 Liters/day
Raw water in flow rate (73862x87.5) : 6462925.00 Liters/day
6.47 MLD
Bulk Water Demand Nil 0.00 MLD
Total Water 6.47 MLD
Say 6.50 MLD
Plant Running hours : 20.00 hrs
Hours per day : 24.00 hrs
Design Raw Water inflow rate (6.5x24/20) : 7.80 MLD
Say 7.80 MLD
Design Flow Rate : 325.00 m3/hr
0.09 m3/sec
50% Overload for all Channels, Pipes
50% (325 x 1.5) : 487.50 m3/hr
and openings
: 0.14 m3/sec
100% Overload for filter inlet & outlet 100% (325 x 2) : 650.00 m3/hr
: 0.18 m3/sec
1 Aerator Fountain
Design Rate of flow : 487.50 m3/hr
Page 1
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Internal Dia of Collection Launder ID 4.70 m
Page 2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Area provided 12.92 m2
Surface area loading Provided (12.92/325) 0.040 m2/m3/hr(OK)
Provide Cascade Aerator with 5 Cascades Riser-300mm; 1st Tread-500mm, 2nd to 6th-400mm& Collection launder
of 4.7 m Inner dia and 0.45 m width 1.8 m Total depth including free board.
Page 3
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
2b Parshall flume
Reference:
IS 14371:1996:" Measurement of Liquid Flow in Open Channels -
PARSHALL and SANIIRI FLUMES"
Rate of flow : 0.135 m3/sec
Q=k ha n : Table no: 3 PF No-3
Discharge equation for Parshall flume
Where,
Discharge constant , k : 0.679
Discharge coefficient, n : 1.521
Substituting the Values
U/S Channel Floor is to be
Liquid depth of PF(U/S) ha connected to PF floor by a : 0.346 m
slope of 1:4.
Liquid Depth of U/S Channel(Ha)
0.446 m
Say 0.450 m
Modular Limit (hb/ha) : 0.60
Page 4
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Free board for the Parshall flume
length of 3.7m(As per IS:14371 FB : 1.00 m
Cl.8.2.1)
2c Downstream channel
Design Rate of flow (with 50% overloading) : 487.50 m3/hr
Assume velocity of flow Vcl : 0.90 m/sec
Area of channel required : 0.15 m2
Width of the channel Wcl : 1.50 m
Water depth in the channel : 0.10 m
4 Flash Mixer
No of units 2 Nos
Design Rate of flow q : 162.50 m3/hr
4a Flash mixer tank
As per CPHEEO manual,
Considering Detention time as t Detention time 30 to 60sec : 60.00 secs
Clause: 7.4.2, page no: 205
Page 5
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Length of the tank provided : 1.50 m
Page 6
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Ratio of tank height to Width shall be between 1:1 to 3:1 : 2.00 OK
Therefore, Volume of tank provided Vfmp : 2.71 m3
Drain line 100.00 mm
Provide Flash Mixer of 1.5 m Length x 1.5 m Width x 3 m liquid depth + 0.50 m free board
4b Inlet Sluice Gate for each Flash Mixer
Design Rate of flow (with 100% overloading) : 325.00 m3/hr
Q=CdxAxV
Coefficient of discharge (Cd) 0.7 to 0.8 0.70
Veleocity (V) : 1.20 m/sec
No of inlets per each Flash mixer : 1.00 Nos
Area (A) of opening required : 0.075 Sqm
Width of gate : 0.27 m
Width of gate provided 0.30 m
Depth of gate : 0.30 m
Depth of gate provided : 0.30 m
Provide MS Sluice Gate for each Flash Mixer of size 0.3 m wide x 0.3 m height + required operating height.
4c Drop Chamber
Design Rate of flow : 162.50 m3/hr
Width of chamber as per Flash mixer : 1.50 m
Length of chamber Provided : 1.00 m
Depth of chamber required *To be Finalised as per HFD.
: 5.95 m
Depth of chamber Provided
: 5.95 m
Provide a Drop chamber of 1 m Length x 1.5 m width x 5.95 m depth + 0.5 m free board
Rectangular Sharp crested weir at Top Q=0.5445 x Ce x (g)^0.5 x b As per CPHEEO Manual, Cl no:
of side wall x h^1.5 4.2.1.2 (a)
Page 7
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Page 8
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
6 Clariflocculator
Design Rate of flow : 325.00 m3/hr
No of units : 2
6a Clarifloculator Inlet Pipe
Design Rate of flow (with 50%
overloading) 487.5/2 : 243.75 m3/hr
Assume a velocity of : 0.65 m/sec
Area required for opening 243.75/3600/0.65 : 0.10 m2
Size of pipeline required : 0.36 m
Size of pipeline provided : 400.00 mm
Provide 400 mm dia pipe
6b Clarifloculator Inlet Shaft
Assume a velocity of : 0.40 m/sec
Area Required for inlet shaft : 0.17 m2
Size of inlet shaft : 0.46 m
However provide an inlet Shaft of size 500 mm 500.00 mm
Considering 250 mm wall thickness, Outer dia of inlet shaft : 1000.00 mm
1.00 m
Consider Velocity of flow : 0.30 m/sec
Area required for opening : 0.23 m2
No of openings in Dispersion Chamber
: 8 Nos
Width of each opening : 0.168 m
Say 0.15 m
Depth of opening : 0.192 m
say 0.200 m
Height of Dispersion chamber : 0.79 m
Say : 0.80 m
Dia of Dispersion chamber : 1.60 m
Say : 1.60 m
Provide 8 No. of openings of size 0.15 x 0.2 m in Dispersion chamber
Provide Dispersion Chamber of size 1.6m dia x 0.8m Height at the Top of the Shaft
6c Flocculator
Design Rate of flow : 162.50 m3/hr
As per CPHEEO manual,
Mechanical type flocculator,
Assume detention time page no: 213 : 30.00 minutes
Page 9
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Page 10
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Volume of flocculator 162.5x30/60 : 81.25 m3
: 406.25 OK
Provided Surface overflow rate : 29.5 m3/m2/day(OK)
Slope (1:9.75)
Orifice Design
Design Flow 162.50 m3/hr
0.04514 m3/Sec
Weir loading 300.00 m3/day/m
12.50 m3/hr/m
Weir loading Length required 13.00 m
Available Periferal Length 46.16 m
Submerged Orifice for decanting velocity considered 0.50 m/s
surface water
Discharge Co-efficent Cd 0.70
Total Area of Orifices required 0.1290 m2
Consider Orifice Size Dia 50.00 mm
Number of Orifices 65.72 nos
Provide 102.00 nos
C/C distance of Orifice 0.4525 m
Provide 450.000 mm
Actual Weir Overloading 10.15 <12.50(OK)
Submerged Orifices shall be provided 100mm below TWL(Range 30mm to 600mm as per CPHEEO)
6e Collection Launder (It is to be provided outside peripheral wall of Clariflocculator)
Flow to launder (with 50%
(50% of Total Flow)
overloading) : 0.034 m3/sec
Width of launder (b) : 0.45 m
Page 13
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Provide a Launder of size 0.45 m wide and 0.25m Liquid depth + 1.15m Free Board
Provide Clarifier of 14.7 m inner Dia with 3.6 m Total Side Wall Depth with including 0.50 m FB
6f Sludge outlet pipe
Considered Suspended solids of Raw 175.00 mg/l
Water Taken 1NTU : 1SS :
Outlet of suspended solids from 10.00 mg/l
clarifier water :
Sludge to be removed from 165.00 mg/l
cariflocculator :
Alum dosage : 50.00 mg/l
Sludge generated from Alum : 12.30 mg/l
Lime dosage : 25.00 mg/l
Sludgesuspended
Total generatedsolids
from removed
Lime from : 25.00 mg/l
clarifer : 202.30 mg/l
Sludge removed in 1 Clariflocculator : 32.87 kg/hr
Sludge removed in clariflocculator : 788.97 kg/day
Sludge consitency : 1.20 %
Sludge volume generated from both m3/day
65.75
Clariflocculators :
Daily quantity of sludge from Both
: 2.74 m3/hr
Clariflocculators
Assuming that above sludge is discharged daily for a period of 10 min per hour.
Flow rate : 0.0091 m3/sec
Assuming the velocity of sludge : 0.90 m/sec
Area of pipe required : 0.01 m2
Dia. Of pipe required : 113.7 mm
Dia of pipe provided : 200 mm
Provide 200 dia DI Sludge pipe with Telescopic sludge valve
6g Clariflocculator Sludge Hooper
Design
No. of Clariflocculators : 2 Nos
Flow rate from each Clariflocculator : 2.74 m3/hr
Detention time : 2.50 hr
Sludge volume generated : 6.85 m3
Depth provided : 0.80 m
Area required : 8.56 sqm
Top Diameter of Hooper including
central shaft dia : 4.00 m
Bottom Diameter of Hooper including
central shaft dia : 3.00 m
Hooper side wall slope(V:H) : 1.6:1
A (Trapezoidal Section) : 1.50 m
B (Trapezoidal Section) : 1.00 m
C/S Area of Hooper : 1.25 sqm
Central Diameter of Hooper : 3.00 m
Peripheral Length of Hooper : 9.42 m
Volume of Sludge Hooper : 11.78 m3(OK)
Provide Size of Clariflocculator Sludge Hooper 4.0m(Top Dia) x 3.0m(Bottom Dia) x 0.80m(Depth).
Schematic diagram is to be provided.(Refer attached Schematic Diagram)
6h Connecting
Design Rate Channel from50%
of flow (with Clarifier to Bypass Channel
overloading) qcc qf : 243.75 m3/hr
Velocity Vcc : 0.70 m/sec
Page 14
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Area of channel required 243.75/3600/0.7 : 0.10 m2
Width of channel : 0.60 m
Page 15
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Page 17
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
: 4.80 m3/m2/hr
Design flow of filter qf : 325.00 m3/hr
No. of Twin filter beds proposed Nf (qf^0.5) / 4.69 : 4.0 Nos
Provide (3W+1SB) 4.0 Nos
No. of Twin filter beds working, when (3W+1SB)
1 filter bed is under washing : 3.00 Nos
Design flow of filters 325.00 m3/hr
Area of filter bed required Af qf / Rf : 67.71 m2
No. of single filter beds (Sub-section) Nf Working : 6.00 Nos
Area of each unit Aftb Af/Nf : 11.28 m2
Length to Width ratio as (Range) : 1.20 to 1.33
Width of filter unit Wfb (Afb/1.25)^0.5 : 3.07 m
Say : 3.00 m
Length of filter unit Lfb Aftb / Wfb : 3.84 m
Provide width of filter bed : 3.00 m
Provide length of bed : 3.80 m
Length to Width ratio 1.27 OK
Provide 8 nos of Single filter beds(6W+2SB) of each size 3m(W) x 3.8m(L)
Depth of filter sand : 0.75 m
Depth of Gravel : 0.45 m
Depth of water : 2.00 m
Depth for Laterals : 0.35 m
Free board : 0.50 m
Total depth : 4.05 m
7d Filter media
As per CPHEEO manual,
Sand Clause: 7.6.3.6, page no: 246
Page 19
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Wash water for each Single bed 36x11.4/60 : 6.84 Cum/min
Wash water for each Twin bed : 820.80 Cum/hr
Wash water for each Twin bed : 13.68 Cum/min
Length of each bed : 3.80 m
02nos Wall End Gutters are
to be centered@0.60m from
No of cross Troughs/bed : 4 Nos
the wall and other two
@1.0m c/c.
Rate of flow/Trough : 0.029 Cum/sec
Width of trough : 0.35 m
As per CPHEEO manual,
Depth of water in trough
Equation: 7.32, page no: 250 : 0.15 m
(Q=1.376*b*h^3/2)
Say : 0.25 m
Size of cross trough :
Depth with free board : 0.25 m
Width : 0.35 m
Outer dimension (width) of cross trough : 0.60 m
Length of filter bed : 3.80 m
Lateral Travel of Wash water : 0.475 m(OK)
Provide Wash Water Gutter Size 0.35m(W) x 0.25m(LD) + 0.10m(FB)
Page 20
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Page 22
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Say : 2100.00 LPM
Pumping head (Tentative) H : 25.00 m
HP required Rp x H /4300/0.65 : 17.95 HP
Say : 20.00 HP
Provide 2 No. of pumpsets with 20 HP capable of discharging 2100 lpm with a head of 25 m, 1W+1S
8c Pump Delivery Pipe Size to Backwash Over Head Tank
Back wash water Pumping capacity : 370.00 Cum
Tank to be filled in : 3.00 Hours
Page 24
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Provided Filter Outlet Chamber Size 1.3m(L) x 1.3m(W) x 1.5m(LD) + 0.5m(FB).
Sharp Crest Weir 1.3m Width x 1.4m Height(P) x 0.10m Head Over Crest(h).
10a Design of Clear Water Channel (with 50% overloading)
Discharge : 487.5 m3/hr
Page 26
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Dosing Pumping head : 25.0 m
i Lime tanks
Provide 2.20 m
Page 27
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Page 29
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Liquid depth provided : 3.00 m
Area required : 53.11 sqm
Dia of tank : 8.22 m
Dia of tank Provided : 9.00 m
Provide 1no. of BWRS of 9 m Dia x 3 m water depth + 0.50 m FB
Wash water generated per 24 hours : 547.20 cum/day
Max. Filter inlet Suspened soilds
assumed as : 15.00 mg/lit
Filter outlet Suspened Soilds assumed
as : 1.00 mg/lit
Page 31
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Hours of pump Operation : 16 Hrs
Capacity at 16 hrs operation : 1.78 cum/hr
No of pumps provided : 1.0 Nos
20 Centrifuge
No of centrifuge working : 1.0 Nos
Total sludge flow to centrifuges : 2.00 cum/hr
No. of Operation hours : 16.0 hr
Provide 2nos. (1W+1S) of Centrifuges of 2 cum/hr in 16 hr of operation
Total solids flow for 16 hours
operations : 89.19 kg/hr
Solids handling capacity of each
centrifuge : 1427.04 kg/day
Capacity Of Centrifuge Provided : 2.00 cum/hr
Under flow sludge consistency from
centrifuge : 20.00 %
Under flow from centrifuge : 7.20 cum/day
: 0.45 cum/hr
Supernantant from centrifuge : 21.34 cum/day
Supernantant from centrifuge : 1.33 cum/hr
21 Poly Eletrolyte (PE) Dosing system
21a DWPE requirment for Sludge thickner
Total sludge flow to the Sludge
thickners 1585.60 Kg/day
No. of Operation hours 24.00 hr
Assuming as 1kg/T of dry
Dosage rate of DWPE for Thickners soilds 1.00 kg/T
DWPE requirement 1.59 kg/day
Strength of DWPE Sloutions 0.50 %
Volume of DWPE for thickners 0.32 cum/day
No. of tanks required 2.00 nos
Rating of tank 12.00 hrs
Volume of DWPE for 12hrs Capacity 0.16 cum
Provide 02nos DWPE Tanks size 0.9m(L) x 0.90m(W) x 1.1m(D) including DS-0.1m + 0.50m(FB) in Chemical House.
Page 32
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
PROCESS DESIGN CALCULATIONS FOR 6.5 MLD WTP
Volume of DWPE for Centrifuges 0.57 cum/day
No. of tanks required 2.00 nos
Rating of tank 8.00 hrs
Volume of DWPE for 8hrs Capacity 0.29 cum
Provide 02nos DWPE Tanks size 0.90m(L) x 0.90m(W) x 1.10m(LD) + 0.50m(FB) in Centrifuge
Building.
21d DWPE dosing pumps for Centrifuge
Pump capacity 35.68 lph
Pump capacity Provided 40.00 lph
Provide 2nos. (1W+1S) of Thickner dosing Pumps of 40 lph at 25 m head(Tentative)
21e DWPE Common tank for Thickner and Centrifuge
Volume of DWPE capacity for thickner
and centrifuge 0.44 cum
Liquid depth D 0.80 m
Assuming storage capacity of : 1.00 months
DWPE requirement for 1 month : 133.19 Kg
Provide capacity of 1can/bag : 150.0 kg
No of drums required : 1.00 nos
Assume area required for 1 drum : 1.00 m2
Area of DWPE storage : 1.00 m2
Provide 02nos Tanks size 1.0m(L) x 1.0m(W) x 1.10m(D) + 0.50m(FB) in Chemical House First Floor.
Provide 2nos. (1W+1S) of dosing Pumps of 70 lph at 25 m head(Tentative)are to be placed in the Chemical House
Page 33
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 1
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 2
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 3
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 4
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Discharge through rectangular weir Q=0.5445 x Ce x (g)^0.5 x b x As per CPHEEO Manual, Cl no:
h^1.5 4.2.1.2 (a)
Coefficient of discharge (Ce) 0.864
Width of Weir (b) 1.30 m
Liquid Depth Provided 1.50 m
Head over crest 0.10
Height of the Weir(P) 1.40 m
(0.06/(0.5445 x 0.864 x 3.132 x
Head over weir (H)
1.3))^(1/1.5) 0.100 m
Head over weir provided 0.10 m
TWL of Control Chamber 144.65 m
IL of Control Chamber 143.15 m
b Filters
Tip of the Weir in Control chamber 144.55 m
Assuming top layer of sand bed 150 mm below the Tip of Sharp Crest
Weir in control chamber weir
Top layer of sand bed 144.40 m
Depth of sand bed 0.75 m
Depth of gravel bed 0.45 m
Depth for Laterals 0.35 m
IL of Top of under drain Filter floor,
Bottom level of Filter Bed
fitted with Laterals 142.85 m
Thickness of under drain floor 0.30 m
Top of Manifold Channel 142.55 m
Depth of manifold 0.50 m
IL of Manifold 142.05 m
Pipe Gallery Floor Level at Center 141.45 m
Pipe Gallery Floor Level at Side 141.40 m
Bottom Level of Trough(Gutter) over
Sand Bed 144.825 m
Say 144.80 m
IL of Trough (Gutter) Slab Thickness=0.15m 144.95 m
Top of Trough wall (Gutter) Depth of Gutter with FB=0.35m
145.30 m
IL of Gullet 143.15 m
Liquid depth over the Sand bed 2.00 m
TWL in Filter Bed 146.40 m
Free Board 0.50 m
Top of the Filter Wall To Vary as per GAD. 146.90 m
Page 5
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Length of pipe 5m
Flow through pipe with 100% over load 0.060 m3/s
Roughness coeffecient for pipe CR 110.00
5x((0.07/110)^1.81/
(i) Head loss (H)
(994.62x(0.35^4.81)) 0.008 m
Page 6
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 7
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 8
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 9
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Velocity considered
0.40 m/s
Size of inlet shaft 0.46 m
Provided Shaft size 0.50 m
Therefore, velocity through pipe 0.35 m/s
Head loss as per Hazen willam's formula
0.07 m3/sec
Page 11
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 13
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 14
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
n (concrete surface)
0.014
Slope (S) 0.0001
Length of channel
6.00 m
Head loss 0.00083 m
Head loss provided 0.05 m
TWL in Down stream Channel(At
Start) 147.70 m
IL in Down stream Channel 147.40 m
b PARSHALL FLUME
Design flow = 487.50 m³/hr
Number of units = 1.00
Flow per unit = 487.50 m³/hr
Flow,Q, design = 0.135 m³/sec
Throat width,W = 300 mm
Modular Limit (Hb/Ha) = 0.600
Provide Difference between approach channel and down stream Channel = 0.150 m
Page 15
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Top of the Bell mouth 0.15m above tip of the cascade 150.00 m
Page 16
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 17
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Length of pipe 20 m
Flow through pipe 0.0002 m3/s
Roughness coeffecient for pipe CR 110.00
20x10.67x((0.001/110)^1.852/
Head loss
((0.2^4.8704)) 0.00001 m
However Total head loss provided as 3% slope (minimum) of length of
per CPHEEO manual. pipe 0.60 m
Page 20
ANNEXURE -2
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
HYDRAULIC DESIGN CALCULATIONS FOR 6.5MLD WTP
Page 21
Execution of 04nos Individual Mega RPWS Project Pertaining to Khairput, Malkangiri, Mathili &
Kalimela Blocks of Malkangiri District including 5 Years Operation & Maintenance.
LIST OF WTP COMPONENTS
S.no UNITS SIZING QUANTITY
Hopper TW-6.50m
14.70m dia x 3.1m SWD
9 Clariflocculator 2Nos x BW-5.50m x
+0.5m FB
0.80mSD
As per Technical
29 Staff Quarters 90sqm G.F Specification, Pg
no: 159
Mechanical list
d Air Blower pipe 300 mm dia pipe DI 1 0 1
8 Backwash water storage tank
Backwash water pump Horizontal centrifugal, 900m3@12m head Casing- CI, 2 1 3
Shaft &
Impeller- SS
9 Recovered water & settled sludge
pump house
Recovered Filter Sludge transfer pump Horizontal centrifugal pump Casing- CI, 1 1 2
Shaft &
Impeller- SS
10 Clariflocculator Sludge Sump
Clariflocculator Sludge transfer pumps Sutable pump Casing- CI, 1 1 2
Shaft &
Impeller- SS
11 Chlorination system
a Chlorinators (Pre-chlorination) Vacuum feed type gas chlorinator of capacity --
Pre -chlorination -16.67 kg/hr
19 1 20
b Chlorinators (Post-chlorination) Vacuum feed type gas chlorinator of capacity --
Post -chlorination - 6.68 kg/hr
c Chlorine booster pumps of suitable capacity -- 1 1 2
d EOT at Chlorination Building 5 Tonne Capacity 1 0 1
e Chlorine tonners for pre- & post Chlorine tonners each of capacity 900 kg -- 1 1 2
chlorination
f Drum Weigher 1 T, Circular scale indicator type --- 1 0 1
12 Service water Sump
a Service water pumps Horizontal centrifugal type of capacity 25m3/ Casing- CI, 1 1 2
hr @ 10m head for filling Service water tank Shaft &
Impeller- SS
10 Sump pumps at Filter gallery Submersible type of capacity 18m3/hr @ 7m Casing- CI, 1 1 2
head Shaft &
Impeller- SS
13 Lab. Equipments As per tender -- 1 lot
14 Sampling pumps of suitable capacity CI 2 0 2
15 Instrumentation
a Flow meter Ultrasonic time of flight type at inlet of raw --- 1 0 1
water reservoir pipe
b Level transmitter Ultrasonic Type at Each compartment of raw --- 2 0 2
water reservoir
c Flow meter open channel Ultrasonic type at each --- 3 0 3
Parshall Flume
d Turbidity Meter at Raw water channel, Clariflocculator outlet --- 3 1 4
& Filtered water Channel
e Differential pressure transmitter/Less of For each filter --- 6 0 6
Head indicator
f Conductivity Probes/transducers At each Filter --- 6 0 6
g Electromagnetic flow meter At each backwash water pipe line --- 4 0 4
h Level Switch in Backwash water storage tank --- 2 0 2
i Ultrasonic level transmitter in Wash water recovery tank --- 4 0 4
j Flow meter at Common header of Alum Dosing Line --- 1 0 1
k Air Flow meter at Common header of Air blower pipe line, 1 0 1
l Level indicator at Supernatant tank, Clariflocculator sludge --- 5 0 5
sump, recovered Filter Sludge Sump
m Level Switch in Alum Solution Tank --- 2 0 2
n Flow Switch In alum carrier water line at inlet of Flash --- 1 0 1
Mixer
o Residual chlorine transmitter at outlet of clariflocculators and treated water --- 4 0 4
Mechanical list