Site OF
OFQUANTITY
BILLName : Taman Badung
QUANTITY
PT. Site ID : BDG_042
PT.BALI
BALITOWERINDO
TOWERINDO SENTRA
SENTRATower (SST)
: Self Support
Tower Type : 50 M Back Bone
Site Name
Tower : - : Badung - Bali
Height Site :-
ID
Area : Monopole Octagonal
Tower Type : 21m
: Jabodetabek
Tower Height
Area Vertikality dan Perbaikan Kemiringan Tower
Pekerjaan
NO Item Work Unit Qty (APD) Unit Price (IDR) Total Price (IDR) Remarks
A Site Preparation
Physical Preparation
*Documentation: foto kegiatan dan hasil vertikality
- Local Permits
A.1 Ls 1.00 1,000,000.00 1,000,000.00 before dan after + foto alat serta foto kegiatan pekerjaan
- Site Security
perbaikan jika dilakukan pekerjaan perbaikan
- Documentation
A.2 Mobilization & Demobilization Ls 1.00 500,000.00 500,000.00
Sub Total 1,500,000.00
B Pekerjaan Vertikality:
Pengecekan dan Penarikan Slip Joint Monopole Miring Menggunakan Hand Tackle dan
C.2 Ls 1.00 1,042,000.00 1,042,000.00
Hidrolik/dongkrak untuk leveling baseplate jika ditemukan kemiringan di baseplate.
C.3 Pengecekan verticality menggunakan theodolite Ls 1.00 (include point B.1) Vertikality After Pekerjaan Perbaikan
Grouting Cementing WITH ZICA Grout (5 cm) ukuran pedestal 1m x 1m (include 1 zak=25 kg, 1m3=1920kg = 77zak, dibuat sdikit
C.4 pembersihan area grouting hingga benar benar bersih dari kotoran dan debu sebelum di Zak 4.00 160,000.00 640,000.00 kemiringan ke arah sisi luar pedestal supaya air tidak
grouting ulang) menggenang
Total 1,820,500.00
Grand Total 4,160,500.00
Note :