Inspection Done, slump and temperature checked by Lab, for concrete compressive strength testing

cylinders filled and collected by lab. it's contractor responsibility to arrange with lab for compressive
strength testing for 7 days and 28 days according to the pouring date. proper curing required for the
cylinders and structure itself.