You are on page 1of 15

N.

30A
N.30B
WTS = 22.77
WDS = 261.50 WTS = 725.69
R = 0.09 WDS = 296.42
B+0 R = 2.45
D+0

+15
+15
+12
+12
+9
+9
+6
+6
+3
N.30 NEW 1 +3
±0
WTS = 458.67 ±0
WDS = 242.62
R = 1.89
DD+0
20.60
20.60

+15

+12

+9
N.30A
+6
WTS = 22.77
WDS = 261.50
+3 R = 0.09
B+0
±0

+15

+12
20.60

+9
N.29 Ex
+6
WTS =
WDS = +3
R=
B+0 ±0

+15

+12 20.60

+9

+6

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between Distance Between
Profile Point (m) Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.29 EXISTING N.30 NEW 1 N.30A Tower Number N.30A N.30B PT. HEXA INTEGRA ELECTRICA AND
Tower Type B+0 B+0 B+0 Tower Type B+0 D+0 CAIULU UNIPESSOAL, LDA

Span length (m) 175.07 310.16 Span length (m) 212.84


Deviation Angle 8°12'45" R Deviation Angle
and Direction 3°46'52" R and Direction 3°46'52" R 39°45'52" R

Cumulative Distance (m) 0.00 175.07 485.23 Cumulative Distance (m) 485.23 698.06

N.30NEW N.30AA
N.30 DESIGN CONSULTANT TO PREPARE
PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
N.29 DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

N.30 NEW N.30A N.30B


N.30A LONGITUDINAL PROFILE
N.29 Existing - N.30B
N.30D
WTS = 666.68
WDS = 337.67
R = 1.97
D+0

+15

+12

+9

+6

+3

±0

20.60

N.30B
WTS = 725.69
WDS = 296.42
R = 2.45
D+0

N.30C
+15
WTS = 110.73
+12 WDS = 383.85
R = 0.29
+9 B+9
+6

+3
+15
±0
+12

+9

+6

20.60 +3

±0

20.60

Reference Datum (m) =

Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between
Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.30B N.30C N.30D PT. HEXA INTEGRA ELECTRICA AND
Tower Type D+0 B+9 D+0 CAIULU UNIPESSOAL, LDA

Span length (m) 380.00 387.70


Deviation Angle 1°33'23" R 49°5'50" R
and Direction 39°45'52" R

Cumulative Distance (m) 698.06 1078.06 1465.77

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
A N.30CC FEASIBILITY STUDY, PRELIMINARY
0A DESIGN AND TENDER DOCUMENTS FOR
.3 THE CONSTRUCTION OF NEW
N 150KV/20KV SUBSTATION AT TIBAR, DILI

LONGITUDINAL PROFILE
N.30B - N.30D
0B N.30C
N.30D
.3
N
N.30D
WTS = 666.68
WDS = 337.67
R = 1.97
D+0
N.30E
+15 WTS = 518.63
WDS = 354.88
+12 R = 1.46
+9
A+0
+6

+3 +15

±0 +12

+9

+6

+3
20.60

±0

20.60

N.30F
WTS = 87.25 N.30G
WDS = 329.02
R = 0.27 WTS = 544.32
WDS = 266.45
B+3 R = 2.04
B+6

+15

+12 +15

+9 +12

+6 +9

+3 +6

±0 +3

±0

20.60

20.60

Reference Datum (m) =

Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between
Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.30D N.30E N.30F N.30G PT. HEXA INTEGRA ELECTRICA AND
Tower Type D+0 A+0 B+3 B+6 CAIULU UNIPESSOAL, LDA

Span length (m) 287.63 422.12 235.91


Deviation Angle 49°5'50" R 2°34'47" L 3°26'6" R
and Direction 2°4'11" L

Cumulative Distance (m) 1465.77 1753.39 2175.51 2411.42

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
N.30EE N.30FF
C

FEASIBILITY STUDY, PRELIMINARY


0C

DESIGN AND TENDER DOCUMENTS FOR


THE CONSTRUCTION OF NEW
.3

150KV/20KV SUBSTATION AT TIBAR, DILI


N

LONGITUDINAL PROFILE
N.30D - N.30G
0D

N.30E N.30F N.30G


.3
N
N.30G
WTS = 544.32
WDS = 266.45
R = 2.04
B+6

+15

+12

+9

+6

+3

±0
N.30I
WTS = 675.19
WDS = 294.28
R = 2.29
20.60
B+0

+15

+12
N.30H
+9
WTS = -67.80
WDS = 271.00 +6
R = -0.25
+3
B+12
±0

+15

+12
20.60
+9

+6

+3

±0

20.60

+15

+12
N.30J
+9
WTS = 625.11
+6
WDS = 395.99
R = 1.58
+3 C+9
±0

20.60

Reference Datum (m) = ELECTRICIDADE DE TIMOR-LESTE,


Profile Point Name EMPRESA PUBLICA (EDTL,E.P.)

Elevation (m)

Distance Between PT. AMYTHAS IN JOINT VENTURE WITH


Profile Point (m) PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA
Tower Number N.30G N.30H N.30I N.30J
Tower Type B+6 B+12 B+0 C+9
Span length (m) 296.99 245.01 343.55
Deviation Angle 3°26'6" R 24°32'36" R
and Direction

Cumulative Distance (m) 2411.42 2708.41 2953.42 3296.96


DESIGN CONSULTANT TO PREPARE
PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
N.30FF N.30II DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

LONGITUDINAL PROFILE
N.30G - N.30J

N.30H N.30J
N.30G N.30I
+15

+12
N.30J
+9
WTS = 625.11
+6
WDS = 395.99
R = 1.58
+3 C+9
±0

20.60

N.30K
WTS = 91.14
WDS = 320.14
R = 0.28
B+9

+15

+12

+9

+6 N.30L
+3 WTS = -26.22
WDS = 273.08
±0
R = -0.10
E+0

20.60 +15

+12

+9

N.30K +6

WTS = 91.14 +3
WDS = 320.14
R = 0.28 ±0

B+9

+15 20.60

+12

+9

+6

+3

±0

20.60

ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)

Reference Datum (m) = Reference Datum (m) = PT. AMYTHAS IN JOINT VENTURE WITH
Profile Point Name Profile Point Name PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA
Elevation (m) Elevation (m)

Distance Between Distance Between


Profile Point (m) Profile Point (m)
Tower Number N.30J N.30K Tower Number N.30K N.30L
Tower Type C+9 B+9 Tower Type B+9 E+0
DESIGN CONSULTANT TO PREPARE
Span length (m) 448.43 Span length (m) 191.84 PRELIMINARY SITE SURVEY,
Deviation Angle 24°32'36" R 19°19'36" L Deviation Angle 19°19'36" L
and Direction and Direction 68°38'10" R FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
Cumulative Distance (m) 3296.96 3745.40 Cumulative Distance (m) 3745.40 3937.23 THE CONSTRUCTION OF NEW
JJ
0II N.30 150KV/20KV SUBSTATION AT TIBAR, DILI
3
N.

N.3
LONGITUDINAL PROFILE
N.30J - N.30L

0K
K
J 0K N.3
30 N.3 N.30K 0L
N.
N.30L
WTS = -26.22
WDS = 273.08
R = -0.10
E+0

N.30M N.30M
+15 WTS = 355.88 WTS = 355.88
N.30N
WDS = 366.76 WDS = 366.76 WTS = 381.87
+12
R = 0.97 R = 0.97 WDS = 331.40
+9 C+9 C+9 R = 1.15
D+9
+6

+3
+15 +15
±0 +15
+12 +12
+12
+9 +9
+9
+6 +6
+6
20.60 +3 +3
+3
±0 ±0
±0

20.60 20.60

20.60

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between Distance Between
Profile Point (m) Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.30L N.30M Tower Number N.30M N.30N PT. HEXA INTEGRA ELECTRICA AND
Tower Type E+0 C+9 Tower Type C+9 D+9 CAIULU UNIPESSOAL, LDA

Span length (m) 354.31 Span length (m) 379.20


Deviation Angle Deviation Angle 29°4'50" L
and Direction 68°38'10" R 28°49'49" L and Direction 28°49'49" L

Cumulative Distance (m) 3937.23 4291.55 Cumulative Distance (m) N.4291.55 4670.75
30
LL
DESIGN CONSULTANT TO PREPARE
Pos 2 Tingkat
PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI
M

N
L
Ru

30
ma
h ting
kat

30 N. N.30M

30
LONGITUDINAL PROFILE
.
N

N.
N.30L - N.30N
N.30N
WTS = 381.87 N.30O N.30O
WDS = 331.40 N.30P
R = 1.15 WTS = 207.05 WTS = 207.05
WDS = 205.16 WDS = 205.16 WTS =
D+9 WDS =
R = 1.01 R = 1.01
R=
TSP40+9 TSP40+9
DR+0
+15

+12
+15
+9
+12
+6
+9
+3 +12 +12
+6
±0 +9 +9
+3
+6 +6
±0
+3 +3

±0 ±0
20.60

20.60
GANTRY

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name

Elevation (m) Elevation (m)

Distance Between Distance Between


Profile Point (m) Profile Point (m)
Tower Number N.30N N.30O Tower Number N.30O N.30P ELECTRICIDADE DE TIMOR-LESTE,
Tower Type D+9 TSP40+9 Tower Type TSP40+9 DR+0 EMPRESA PUBLICA (EDTL,E.P.)
Span length (m) 283.59 126.72 Span length (m) 126.72
Deviation Angle 29°4'50" L 39°7'49" L Deviation Angle 39°7'49" L PT. AMYTHAS IN JOINT VENTURE WITH
and Direction and Direction
PT. HEXA INTEGRA ELECTRICA AND
Cumulative Distance (m) 4670.75 4954.34 Cumulative Distance (m) 4954.34 5081.05 CAIULU UNIPESSOAL, LDA

N.30OO
N.30PP BM
-0
4

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
N. N.30P 150KV/20KV SUBSTATION AT TIBAR, DILI
30
0N O N.30O
N.3 LONGITUDINAL PROFILE
BM
-0
3
N.30N - N.30P
N.31 EXIST
WTS =
WDS =
R=
D+3

+15

+12

+9

+6

+3

N.30AA N.30AA
WTS = -442.54 WTS = -442.54
WDS = 287.90 WDS = 287.90 N.30BB
R = -1.54 R = -1.54
WTS = 208.07
DD+0 DD+0 WDS = 395.20
R = 0.53
AA+9
+15 +15

+12 +12
+15
+9 +9
+12
+6 +6
+9
+3 +3
+6
±0 ±0
+3

±0

20.60 20.60

20.60

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between Distance Between
Profile Point (m) Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.31 EXISTING N.30AA Tower Number N.30AA N.30BB PT. HEXA INTEGRA ELECTRICA AND
Tower Type D+3 EE+0 Tower Type EE+0 AA+9 CAIULU UNIPESSOAL, LDA

Span length (m) 195.79 Span length (m) 380.00


Deviation Angle 32°57'10" L 88°47'30" L Deviation Angle 88°47'30" L
and Direction and Direction 1°21'4" R

Cumulative Distance (m) 0.00 195.79 Cumulative Distance (m) 195.79 575.79

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
N.30BB
0B

FEASIBILITY STUDY, PRELIMINARY


A
A DESIGN AND TENDER DOCUMENTS FOR
.3

. 30 THE CONSTRUCTION OF NEW


N

N. N 150KV/20KV SUBSTATION AT TIBAR, DILI


A

31
A
30

LONGITUDINAL PROFILE
.
N

N.31 Existing - N.30BB

0B
.3
N
N.30CC N.30CC
WTS = 658.86 WTS = 658.86
WDS = 344.97 WDS = 344.97
R = 1.91 R = 1.91
DD+0 DD+0

+15 +15

+12 +12

+9 +9
N.30DD
+6 +6
WTS = 341.03
WDS = 358.87
+3 +3 R = 0.95
BB+0
±0 ±0

+15

+12
20.60 20.60

+9

+6

+3
N.30BB
±0
WTS = 208.07
WDS = 395.20
R = 0.53
AA+9
20.60

+15

+12

+9

+6

+3

±0

20.60

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between Distance Between
Profile Point (m) Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.30BB N.30CC Tower Number N.30CC N.30DD PT. HEXA INTEGRA ELECTRICA AND
Tower Type AA+9 DD+0 Tower Type DD+0 BB+0 CAIULU UNIPESSOAL, LDA

Span length (m) 410.40 Span length (m) 279.53


Deviation Angle 49°49'31" R Deviation Angle 49°49'31" R 3°23'8" L
and Direction 1°21'4" R and Direction

Cumulative Distance (m) 575.79 986.19 Cumulative Distance (m) 986.19 1265.73

DESIGN CONSULTANT TO PREPARE


N.30DD PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
N.30CC
C

N.30BB THE CONSTRUCTION OF NEW


0C

150KV/20KV SUBSTATION AT TIBAR, DILI


.3
N

LONGITUDINAL PROFILE
N.30BB - N.30DD

N.30E
N.30C
N.30DD
WTS = 341.03
WDS = 358.87
R = 0.95
BB+0

+15

+12

+9

+6

+3

±0

20.60 N.30EE
WTS = 374.45
WDS = 365.50
R = 1.02
AA+12

+15
N.30FF
+12
WTS = 407.86
+9 WDS = 269.58
R = 1.51
+6
BB+6
+3

±0 +15

+12

+9

+6
20.60
+3

±0

20.60

Reference Datum (m) =

Profile Point Name


ELECTRICIDADE DE TIMOR-LESTE,
Elevation (m) EMPRESA PUBLICA (EDTL,E.P.)
Distance Between
Profile Point (m)
PT. AMYTHAS IN JOINT VENTURE WITH
Tower Number N.30DD N.30EE N.30FF PT. HEXA INTEGRA ELECTRICA AND
Tower Type BB+0 AA+12 BB+6 CAIULU UNIPESSOAL, LDA

Span length (m) 438.21 292.79


Deviation Angle 3°23'8" L 3°3'13" R
and Direction

Cumulative Distance (m) 1265.73 1703.94 1996.73

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
N.30DD FEASIBILITY STUDY, PRELIMINARY
N.30EE N.30FF DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

LONGITUDINAL PROFILE
N.30DD - N.30FF

N.30E N.30F N.30G


N.30FF
WTS = 407.86
WDS = 269.58
R = 1.51
BB+6

+15

+12

+9

+6 N.30HH
+3 WTS = 686.15
WDS = 293.20
±0
R = 2.34
BB+0

N.30GG
20.60 +15
WTS = -55.68
WDS = 246.23 +12
R = -0.23
+9
BB+9
+6

+3
+15
±0
+12

+9

+6
20.60
+3

±0

20.60

N.30II
WTS = 535.60
WDS = 402.95
R = 1.33
CC+9

+15

+12

+9

+6

+3

±0

20.60

ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)

Reference Datum (m) =

Profile Point Name PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
Elevation (m) CAIULU UNIPESSOAL, LDA

Distance Between
Profile Point (m)
Tower Number N.30FF N.30GG N.30HH N.30II
Tower Type BB+6 BB+9 BB+0 CC+9
Span length (m) 246.36 246.10 340.30 DESIGN CONSULTANT TO PREPARE
Deviation Angle 3°3'13" R 23°41'12" R PRELIMINARY SITE SURVEY,
and Direction
FEASIBILITY STUDY, PRELIMINARY
Cumulative Distance (m) 1996.73 2243.09 2489.19 2829.49 DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

N.30GG N.30HH
N.30FF N.30II LONGITUDINAL PROFILE
N.30FF - N.30II

N.30H N.30J
+15

+12 N.30II
+9 WTS = 535.60
WDS = 402.95
+6 R = 1.33
+3 CC+9
±0

20.60

N.30JJ
WTS =
WDS =
R=
BB+9

+15

+12

+9

+6

+3

±0
N.30KK
WTS = 173.27
WDS = 291.25
R = 0.59
EE+0
20.60

+15

+12

+9

+6

+3

N.30JJ ±0

WTS =
WDS =
R=
BB+9
20.60

+15

+12

+9

+6

+3

±0

20.60

ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name PT. AMYTHAS IN JOINT VENTURE WITH
PT. HEXA INTEGRA ELECTRICA AND
Elevation (m) Elevation (m) CAIULU UNIPESSOAL, LDA

Distance Between Distance Between


Profile Point (m) Profile Point (m)
Tower Number N.30II N.30JJ Tower Number N.30JJ N.30KK
Tower Type CC+9 BB+9 Tower Type BB+9 EE+0
Span length (m) 465.59 Span length (m) 219.02 DESIGN CONSULTANT TO PREPARE
Deviation Angle 23°41'12" R Deviation Angle 65°59'1" R PRELIMINARY SITE SURVEY,
and Direction 17°9'45" L and Direction 17°9'45" L
FEASIBILITY STUDY, PRELIMINARY
Cumulative Distance (m) 2829.49 3295.08 Cumulative Distance (m) 3295.08 3514.09 DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

30
II 0JJ N.30JJ
N.3

N.3
LONGITUDINAL PROFILE
N. N.30II - N.30KK

0K
K
J N.3
30 0 K 0L
N. N.3
N.30KK
WTS = 173.27
WDS = 291.25
R = 0.59
EE+0

+15

+12 N.30LL N.30LL


+9 WTS = 312.88 WTS = 312.88
WDS = 277.46 WDS = 277.46
+6 R = 1.13 R = 1.13
+3 EE+9 EE+9
±0 N.30MM
+15 +15 WTS = 107.29
WDS = 179.93
+12 +12 R = 0.60
+9 +9
TSP10+9
20.60

+6 +6

+3 +3 +12

±0 ±0 +9

+6

+3

±0
20.60 20.60

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name

Elevation (m) Elevation (m)

Distance Between Distance Between


Profile Point (m) Profile Point (m)
Tower Number N.30KK N.30LL Tower Number N.30LL N.30MM
Tower Type EE+0 EE+9 Tower Type EE+9 TSP10+9
Span length (m) 363.48 Span length (m) 191.44
Deviation Angle 65°59'1" R Deviation Angle 10°47'47" L ELECTRICIDADE DE TIMOR-LESTE,
and Direction 64°1'39" L and Direction 64°1'39" L
EMPRESA PUBLICA (EDTL,E.P.)
Cumulative Distance (m) 3514.09 3877.57 Cumulative Distance (m) 3877.57 4069.01

PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA

N.
30
N.30LL MM
N.30KK N.30

LL
Pos 2 Tingkat

N. DESIGN CONSULTANT TO PREPARE


30
M PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
3 0M DESIGN AND TENDER DOCUMENTS FOR
0L

N. THE CONSTRUCTION OF NEW


.3

150KV/20KV SUBSTATION AT TIBAR, DILI


N

LONGITUDINAL PROFILE
N.30KK - N.30MM
N.30NN N.30NN N.30OO
N.30MM WTS = 219.33 WTS = 219.33 WTS = 260.34
WDS = 221.62 WDS = 221.62 WDS = 220.19
WTS = 107.29 R = 0.99 R = 0.99 R = 1.18
WDS = 179.93
R = 0.60
TSP60+9 TSP60+9 TSP30+9
TSP10+9

+12
+12 +12
+12
+9
+9 +9
+9
+6
+6 +6
+6
+3
+3 +3
+3
±0
±0 ±0
±0

Reference Datum (m) = Reference Datum (m) =

Profile Point Name Profile Point Name

Elevation (m) Elevation (m)

Distance Between Distance Between


Profile Point (m) Profile Point (m)
Tower Number N.30MM N.30NN Tower Number N.30NN N.30OO
Tower Type TSP10+9 TSP60+9 Tower Type TSP60+9 TSP30+9
Span length (m) 168.42 Span length (m) 168.42 274.81
Deviation Angle 10°47'47" L 57°30'17" R Deviation Angle 57°30'17" R 23°54'30" L
and Direction and Direction
ELECTRICIDADE DE TIMOR-LESTE,
Cumulative Distance (m) 4069.01 4237.43 Cumulative Distance (m) 4237.43 4512.24 EMPRESA PUBLICA (EDTL,E.P.)

PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
NN

CAIULU UNIPESSOAL, LDA


OO
30
30

N.30MM N.30NN N.
N.

DESIGN CONSULTANT TO PREPARE


O
30 PRELIMINARY SITE SURVEY,
N. FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

LONGITUDINAL PROFILE
N.30MM - N.30OO
N.30OO N.30PP
WTS = 260.34 WTS =
WDS = 220.19 WDS =
R = 1.18 R=
TSP30+9 DTSP40+6

+15

+12

+9
+12
+6
+9
+3
+6
±0
+3

±0

20.60
GANTRY

Reference Datum (m) =

Profile Point Name

Elevation (m)

Distance Between
Profile Point (m)
Tower Number N.30OO N.30PP
Tower Type TSP30+9 DDR+0
Span length (m) 165.57
Deviation Angle 23°54'30" L 41°35'54" R
and Direction

Cumulative Distance (m) 4512.24 4677.81 ELECTRICIDADE DE TIMOR-LESTE,


EMPRESA PUBLICA (EDTL,E.P.)

PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA
N.30OO
N.30PP BM
-0
4

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
N.30P FEASIBILITY STUDY, PRELIMINARY
N.30O DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
BM
-0
150KV/20KV SUBSTATION AT TIBAR, DILI
3

LONGITUDINAL PROFILE
N.30OO - N.30PP