Professional Documents
Culture Documents
30A
N.30B
WTS = 22.77
WDS = 261.50 WTS = 725.69
R = 0.09 WDS = 296.42
B+0 R = 2.45
D+0
+15
+15
+12
+12
+9
+9
+6
+6
+3
N.30 NEW 1 +3
±0
WTS = 458.67 ±0
WDS = 242.62
R = 1.89
DD+0
20.60
20.60
+15
+12
+9
N.30A
+6
WTS = 22.77
WDS = 261.50
+3 R = 0.09
B+0
±0
+15
+12
20.60
+9
N.29 Ex
+6
WTS =
WDS = +3
R=
B+0 ±0
+15
+12 20.60
+9
+6
Cumulative Distance (m) 0.00 175.07 485.23 Cumulative Distance (m) 485.23 698.06
N.30NEW N.30AA
N.30 DESIGN CONSULTANT TO PREPARE
PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
N.29 DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI
+15
+12
+9
+6
+3
±0
20.60
N.30B
WTS = 725.69
WDS = 296.42
R = 2.45
D+0
N.30C
+15
WTS = 110.73
+12 WDS = 383.85
R = 0.29
+9 B+9
+6
+3
+15
±0
+12
+9
+6
20.60 +3
±0
20.60
LONGITUDINAL PROFILE
N.30B - N.30D
0B N.30C
N.30D
.3
N
N.30D
WTS = 666.68
WDS = 337.67
R = 1.97
D+0
N.30E
+15 WTS = 518.63
WDS = 354.88
+12 R = 1.46
+9
A+0
+6
+3 +15
±0 +12
+9
+6
+3
20.60
±0
20.60
N.30F
WTS = 87.25 N.30G
WDS = 329.02
R = 0.27 WTS = 544.32
WDS = 266.45
B+3 R = 2.04
B+6
+15
+12 +15
+9 +12
+6 +9
+3 +6
±0 +3
±0
20.60
20.60
LONGITUDINAL PROFILE
N.30D - N.30G
0D
+15
+12
+9
+6
+3
±0
N.30I
WTS = 675.19
WDS = 294.28
R = 2.29
20.60
B+0
+15
+12
N.30H
+9
WTS = -67.80
WDS = 271.00 +6
R = -0.25
+3
B+12
±0
+15
+12
20.60
+9
+6
+3
±0
20.60
+15
+12
N.30J
+9
WTS = 625.11
+6
WDS = 395.99
R = 1.58
+3 C+9
±0
20.60
Elevation (m)
LONGITUDINAL PROFILE
N.30G - N.30J
N.30H N.30J
N.30G N.30I
+15
+12
N.30J
+9
WTS = 625.11
+6
WDS = 395.99
R = 1.58
+3 C+9
±0
20.60
N.30K
WTS = 91.14
WDS = 320.14
R = 0.28
B+9
+15
+12
+9
+6 N.30L
+3 WTS = -26.22
WDS = 273.08
±0
R = -0.10
E+0
20.60 +15
+12
+9
N.30K +6
WTS = 91.14 +3
WDS = 320.14
R = 0.28 ±0
B+9
+15 20.60
+12
+9
+6
+3
±0
20.60
ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)
Reference Datum (m) = Reference Datum (m) = PT. AMYTHAS IN JOINT VENTURE WITH
Profile Point Name Profile Point Name PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA
Elevation (m) Elevation (m)
N.3
LONGITUDINAL PROFILE
N.30J - N.30L
0K
K
J 0K N.3
30 N.3 N.30K 0L
N.
N.30L
WTS = -26.22
WDS = 273.08
R = -0.10
E+0
N.30M N.30M
+15 WTS = 355.88 WTS = 355.88
N.30N
WDS = 366.76 WDS = 366.76 WTS = 381.87
+12
R = 0.97 R = 0.97 WDS = 331.40
+9 C+9 C+9 R = 1.15
D+9
+6
+3
+15 +15
±0 +15
+12 +12
+12
+9 +9
+9
+6 +6
+6
20.60 +3 +3
+3
±0 ±0
±0
20.60 20.60
20.60
Cumulative Distance (m) 3937.23 4291.55 Cumulative Distance (m) N.4291.55 4670.75
30
LL
DESIGN CONSULTANT TO PREPARE
Pos 2 Tingkat
PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI
M
N
L
Ru
30
ma
h ting
kat
30 N. N.30M
30
LONGITUDINAL PROFILE
.
N
N.
N.30L - N.30N
N.30N
WTS = 381.87 N.30O N.30O
WDS = 331.40 N.30P
R = 1.15 WTS = 207.05 WTS = 207.05
WDS = 205.16 WDS = 205.16 WTS =
D+9 WDS =
R = 1.01 R = 1.01
R=
TSP40+9 TSP40+9
DR+0
+15
+12
+15
+9
+12
+6
+9
+3 +12 +12
+6
±0 +9 +9
+3
+6 +6
±0
+3 +3
±0 ±0
20.60
20.60
GANTRY
N.30OO
N.30PP BM
-0
4
+15
+12
+9
+6
+3
N.30AA N.30AA
WTS = -442.54 WTS = -442.54
WDS = 287.90 WDS = 287.90 N.30BB
R = -1.54 R = -1.54
WTS = 208.07
DD+0 DD+0 WDS = 395.20
R = 0.53
AA+9
+15 +15
+12 +12
+15
+9 +9
+12
+6 +6
+9
+3 +3
+6
±0 ±0
+3
±0
20.60 20.60
20.60
Cumulative Distance (m) 0.00 195.79 Cumulative Distance (m) 195.79 575.79
31
A
30
LONGITUDINAL PROFILE
.
N
0B
.3
N
N.30CC N.30CC
WTS = 658.86 WTS = 658.86
WDS = 344.97 WDS = 344.97
R = 1.91 R = 1.91
DD+0 DD+0
+15 +15
+12 +12
+9 +9
N.30DD
+6 +6
WTS = 341.03
WDS = 358.87
+3 +3 R = 0.95
BB+0
±0 ±0
+15
+12
20.60 20.60
+9
+6
+3
N.30BB
±0
WTS = 208.07
WDS = 395.20
R = 0.53
AA+9
20.60
+15
+12
+9
+6
+3
±0
20.60
Cumulative Distance (m) 575.79 986.19 Cumulative Distance (m) 986.19 1265.73
LONGITUDINAL PROFILE
N.30BB - N.30DD
N.30E
N.30C
N.30DD
WTS = 341.03
WDS = 358.87
R = 0.95
BB+0
+15
+12
+9
+6
+3
±0
20.60 N.30EE
WTS = 374.45
WDS = 365.50
R = 1.02
AA+12
+15
N.30FF
+12
WTS = 407.86
+9 WDS = 269.58
R = 1.51
+6
BB+6
+3
±0 +15
+12
+9
+6
20.60
+3
±0
20.60
LONGITUDINAL PROFILE
N.30DD - N.30FF
+15
+12
+9
+6 N.30HH
+3 WTS = 686.15
WDS = 293.20
±0
R = 2.34
BB+0
N.30GG
20.60 +15
WTS = -55.68
WDS = 246.23 +12
R = -0.23
+9
BB+9
+6
+3
+15
±0
+12
+9
+6
20.60
+3
±0
20.60
N.30II
WTS = 535.60
WDS = 402.95
R = 1.33
CC+9
+15
+12
+9
+6
+3
±0
20.60
ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)
Distance Between
Profile Point (m)
Tower Number N.30FF N.30GG N.30HH N.30II
Tower Type BB+6 BB+9 BB+0 CC+9
Span length (m) 246.36 246.10 340.30 DESIGN CONSULTANT TO PREPARE
Deviation Angle 3°3'13" R 23°41'12" R PRELIMINARY SITE SURVEY,
and Direction
FEASIBILITY STUDY, PRELIMINARY
Cumulative Distance (m) 1996.73 2243.09 2489.19 2829.49 DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI
N.30GG N.30HH
N.30FF N.30II LONGITUDINAL PROFILE
N.30FF - N.30II
N.30H N.30J
+15
+12 N.30II
+9 WTS = 535.60
WDS = 402.95
+6 R = 1.33
+3 CC+9
±0
20.60
N.30JJ
WTS =
WDS =
R=
BB+9
+15
+12
+9
+6
+3
±0
N.30KK
WTS = 173.27
WDS = 291.25
R = 0.59
EE+0
20.60
+15
+12
+9
+6
+3
N.30JJ ±0
WTS =
WDS =
R=
BB+9
20.60
+15
+12
+9
+6
+3
±0
20.60
ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)
Profile Point Name Profile Point Name PT. AMYTHAS IN JOINT VENTURE WITH
PT. HEXA INTEGRA ELECTRICA AND
Elevation (m) Elevation (m) CAIULU UNIPESSOAL, LDA
30
II 0JJ N.30JJ
N.3
N.3
LONGITUDINAL PROFILE
N. N.30II - N.30KK
0K
K
J N.3
30 0 K 0L
N. N.3
N.30KK
WTS = 173.27
WDS = 291.25
R = 0.59
EE+0
+15
+6 +6
+3 +3 +12
±0 ±0 +9
+6
+3
±0
20.60 20.60
N.
30
N.30LL MM
N.30KK N.30
LL
Pos 2 Tingkat
LONGITUDINAL PROFILE
N.30KK - N.30MM
N.30NN N.30NN N.30OO
N.30MM WTS = 219.33 WTS = 219.33 WTS = 260.34
WDS = 221.62 WDS = 221.62 WDS = 220.19
WTS = 107.29 R = 0.99 R = 0.99 R = 1.18
WDS = 179.93
R = 0.60
TSP60+9 TSP60+9 TSP30+9
TSP10+9
+12
+12 +12
+12
+9
+9 +9
+9
+6
+6 +6
+6
+3
+3 +3
+3
±0
±0 ±0
±0
N.30MM N.30NN N.
N.
LONGITUDINAL PROFILE
N.30MM - N.30OO
N.30OO N.30PP
WTS = 260.34 WTS =
WDS = 220.19 WDS =
R = 1.18 R=
TSP30+9 DTSP40+6
+15
+12
+9
+12
+6
+9
+3
+6
±0
+3
±0
20.60
GANTRY
Elevation (m)
Distance Between
Profile Point (m)
Tower Number N.30OO N.30PP
Tower Type TSP30+9 DDR+0
Span length (m) 165.57
Deviation Angle 23°54'30" L 41°35'54" R
and Direction
LONGITUDINAL PROFILE
N.30OO - N.30PP