Professional Documents
Culture Documents
BOQ Up To 1st Floor Level
BOQ Up To 1st Floor Level
2
Ground floor (Up to DPC level to 1st floor slab) 13,983,368.57
2.1 Concrete work (Coloumns, beams & slab including r/f) 6,460,071.24
Total 20,029,172.77