Step Description Amount

1 Foundation (Up to DPC level) 6,045,804.20

2
Ground floor (Up to DPC level to 1st floor slab) 13,983,368.57

2.1 Concrete work (Coloumns, beams & slab including r/f) 6,460,071.24

2.2 Brick work (Walls & Retaining Wall 9") 1,785,162.33


2.3 Finishing work (Plastering,painting,tilling etc) 4,685,680.00
2.4 Furniture & fittings ( Bathroom fittings,doors & windows, etc) 1,052,455.00

Total 20,029,172.77