18CEO309J - COMPUTER APPLICATION IN CONSTRUCTION ENGINEERING AND MANAGEMENT AY (2022 -2023) ODD SEM Set 1 1. Prepare a minimum of 50 construction job activities and create a project link. Assign the project calendar and Find the critical path and maximum float in the project Description Marks split up (25 Marks) Aim 2.5 Comments used 5 Procedure 10 Results 2.5 Viva 5