TRA Cement Unit Maintenance
TRA Cement Unit Maintenance
FM-088 Version 4
Title: Cement unit maintenance Applicant: Short description of work to be carried out:
Work Area: Cement unit room Department: Drilling Service Leve 4
Work Permit no: Area Responsible Person:
TBT card no.: Department leader: Paul Best
Job (TM master) no: Sub-contractor / Client Schlumberger
Risk rating: low medium high
Steps Hazard Initial Risk Controls Residual Risk
Description Effect Persons at Risk Severity Likelihood Risk Rating Controls in order to reduce the risk Severity Likelihood Risk Rating
Break down the activity, task, job, project Describe all hazards for Describe the effects. Name all persons/ranks at risk. Persons Risk Matrix. Risk Matrix. Sum of the Describe the controls required to ensure Risk Matrix. Risk Matrix. Sum of the
etc. in individual steps. each step. not related to the task may also be No controls in No controls in severity and the residual risk is acceptable. Controls in Controls in severity and
affected. place. place. likelihood. place. place. likelihood.
Residual risk high? Yes Change engineering design, reduce by substitution or further control measures required.
Sign (if applicable)
Page 1 of 3
Risk Assessment Matrix
FM-004
TRA Participant List
TRA Title: