You are on page 1of 6

CURRICULLUM VITAE

Ali. M
Electrical & Instrument
+6282174049940
alitopan9900@gmail.com
Batam, Indonesian

EDUCATION
 Senior High School ETIKA‐2 Pontianak

CERTIFICATED
 E & I Inspector : NO. OTI.EI.XXXI.05.15.666
 CABLE GLANDING and TERMINATION : NO. OTI.CBT‐IV.03.16.060
 TENISI K3 LISTRIK : NO.5/371/AS.02.04/XI/2021

SUMMARY JOB
More than 16 years extensive experienced in field of engineering, supervision, inspection,
fabrication, construction and installation of Electrical and instrumentation of offshore/onshore
in Oil & Gas platform such as platform utility module, Marine, Power Plant and Building. I have
ever been Work under Pressure. I like team work & have never leave a project under bad
condition. it gives a good sense of achievement and job satisfaction to have been a part of
team that gets the job done.

SKILL & ABILITY


 Contruction
 Cable Ladder/Tray Installation SS316, galvanize
 Installation Device Equipment like as F&G, JB, Lighting etc.
 Pulling Cable for Control, Electric, Instrument IS and ISE

 Install Glanding HAWK, CMP, and CAPRI product of Gland all Size
 Wiring Termination Control, Instrument, Lighting & small Power
 Inspection Equipment Installation, Cable Routing & Termination

Page 1 of 6
 Pre‐Comm and Commissioning
 Familiar with Instrument tools Multi Tester, Insulation Tester, Earthing Tester, Clamp
Meter
 Other system control I/O system list function test
 Hydraulic, Electrical pneumatic function test
 F&G, Instrument Device, HVAC, and sensor I/O function test
 Lighting system, Internal Communication system
 Cause and Effect general system testing
 Leak test, hydrotest of installation tubing instrument system

 Computer
 Microsoft Office (All Ver.)

 Understanding
 Ensure Contractor compliance with requirements of Inspection Test Plant & work
procedures.
 Monitor field construction activities to ensure requirements are meet in compliance
with drawings, specifications, and applicable codes.
 Issue Observation Report, Occurrence Report & NCR on Non‐complying products.
 Identify quality deficiencies and root causes at infancy to avoid substantial repetition
prior to discovery and minimize rework.
 Inspection equipment of Hazardous Area‐ensure equipment is suitable for the area in
which it is installed.
 Inspection all frame/support equipment electrical include installation for power
transformer, Main Switchboard, Emergency switchboard, Fixation Panels, Engine
Generators, etc.
 Familiar with electrical equipment inspection, installation, testing of electrical cable
LV/MV/HV, IPB/NPB, Substation Switchgear, Transformer, HV/LV motors, DCS, AC/DC
UPS‐Battery, Earthing systems, lightning arrester, Heat tracing system, etc.
 Prepared Check List & Datasheet of Electrical & Instrument Equipment.
 Witness and verify cable continuity test and insulation test or Insulation test including
the correct use and installation of cable glands.
 Squence Test Panel, Check Vibration, Temperature, RPM Motor.
 Check Earthing (proper electrical grounding) checks for continuity and resistance during
installation.
 Preparation of test records and reports.
 Completion of check sheet requirement and Planning of process to completion report.

Page 2 of 6
 Prepared Final Document dossier as Inspection Test Record include with incoming
material summary according ITP & requirement.
 Electrical Drawing, Symbol, Legend, Single Line Diagram, Layout Drawing, Cable
Schedule, and Detail Drawing.
 Learn about Hazardous Area Drawing.
 Material Specification, Standard Project / Specification. NEMA, NEC, IEC, IEEE, ANSI,
NFPA.
 Inspection Electrical work, Electrical Cabling, Cable Marking, Cable Glanding, Grounding
Cable and Pulling Cable, Connection and termination Cable, etc.
 Inspection Instrument work, Tubing Installation, Installation TT, FT, TE, LT, PDT, PDG, RTD.
 Pneumatic Testing Tubing.
 Electrical Equipment such as Panel Box, Junction Box, Marshalling Cabinet, Circuit
Breaker.
 Inspection of specification Installation Equipment.
 Cable Ladder and Cable Tray Installation and Inspection of Installation.
 Learn about Inspection, As built drawing, ITR, ITP, RFI, FIN, FIR, Material Control.
 Troubleshooting of control system.

Page 3 of 6
WORK EXPERIENCE

Name of Company : PT.DACHENG ENGINEERING


Work Location : TISSUE PROJECT APP.SINARMAS OKI PALEMBANG
Position : QA/QC Electrical & Instrument Inspector
Period : Feb”6, 2023 ‐ Present
Reason for Leaving :

Name of Company : PT. PP


Work Location : TIMOR‐1 C0AL FIRED STEAM POWER PLANT 2X50 MW
Position : Supervisor Electrical / Commissioning
Period : Okt”10 2022 – Jan” 28 2023
Reason for Leaving : Job Completed

Name of Company : PT. PP


Work Location : PLTMG 140.MW FREEPORT TIMIKA
Position : Supervisor Electrical
Period : Sept” 27 2021 – Sept“ 12 2022
Reason for Leaving : Job Completed

Name of Company : PT.TOSHIBA PLANT SYSTEM & SERVICE CORP ( TPSC )


Work Location : PLTU TANJUNG JATI B 2X1000 MW
Position : QA/QC Electrical Engineer
Period : Jun” 15 2019 – Augs“ 31 2021
Reason for Leaving : Job Completed

Page 4 of 6
Name of Company : PT.PP ( EPCC )
Work Location : PLTMG. MERAUKE 2X50 MW
Position : Supervisor Electrical
Period : Jan“ 11 2019 – Jul“ 11 2019
Reason for Leaving : Job Completed

`Name of Company : PT.INDO FUJI ENERGI


Work Location : PLTP EPCC KAMOJANG UNIT 1 1X50 MW
Position : Supervisor Instrument
Period : Agus” 14 2017 – Des” 15 2018
Reason for Leaving : Job Completed

Name of Company : PT.INDO FUJI ENERGI


Work Location : PLTMG PONTIANAK KALBAR 4X25 MW
Position : QA/QC Electrical & Instrument Inspector
Period : Jun” 01 2016 – Jan” 15 2017
Reason for Leaving : Job Completed

Name of Company : PT.TPE INDONESIA


Work Location : PLTU TANJUNG UNCANG BATAM 2X100 MW
Position : QA/QC Electrical & Instrument Inspector
Period : Augs” 01 2015 – Mar” 2016
Reason for Leaving : Job Completed

Name of Company : PT.TPE INDONESIA


Work Location : SIEMANS BATAM PROJEC YAMAL LNG
Position : QA/QC Electrical & Instrument Inspector
Periode : Jul” 01 2014 – Jun” 31 2015
Reason For Leaving : Job Completed

Page 5 of 6
Name of Company : PT.EIN INDONESIA
Work Location : PT.ASL MARINE BATAM
Position : Electrician Facillity Drydock
Period : Feb” 10 2008 – Sep” 2013
Reason for Leaving : Job Completed

Name of Company : PT.EIN INDONESIA


Work Location : PT.ASL SHIPYARD BATAM
Position : Electrical Technician Floating Dock
Period : Marc” 08.2005 – Febr” 06 2008
Reason for Leaving : Job Completed

Name of Company : CV.TENAGA SUKSES


Work Location : BATAM INDONESIA
Position : Electrical Technician Installation
Period : Augs” 02.1999 – July” 08.2005
Reason for Leaving : Job Completed

Page 6 of 6

You might also like