COSTO HORARIO DE EQUIPO MECANICO

2010 ABRIL
COSTO TOTAL
POT. PESO
ITEM EQUIPO MECANICO CAPACIDAD HORARIO
HP KG S/.

1 MEZCLADORA DE CONCRETO 23 11 p3 2,200 30.00

2 CAMION VOLQUETE 330 10 m3 26,000 110.00

3 MOTOBOMBA 10 4" 135 30.00

4 CAMION CISTERNA (4X2) AGUA 145 - 165 2000 gln 13,000 95.00

5 COMPRESORA NEUMATICA 87 250-330 PCM 2,000 85.00

6 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 7 - 9 Tn. 7,300 190.00

7 CARGADOR SOBRE LLANTAS 125 2.5 yd3 11,500 190.00

8 TRACTOR DE ORUGAS 190 - 240 HP 20,520 280.00

9 TRACTOR DE ORUGAS 140 - 160 HP 16,500 200.00

10 RETROEXCAVADORA 20,520 240.00

11 MARTILLO NEUMATICO 25-29 KG 29 25.00

12 VIBRADOR DE CONCRETO 4 1.35 plg 30.00

13 MOTONIVELADORA 125 11,515 180.00

14 PLANCHA COMPACTADORA 4HP 4 95 25.00

15 ZARANDA DE FIERRO 400 5.00

16 EQUIPO TOPOGRAFICO 20.00


CALCULO DE RENDIMIENTO PARA TRANSPORTE - TRAMO I

MATERIAL MATERIAL DE ELIMINACION FUENTES AGUA


BASES DE CALCULO UND AFIRMADO PRESTAMO MATERIAL CONCRETO AFIRMADO

DISTANCIA MEDIA PONDERADA Km. 1.71 0.00 0.00 0.03 0.46


VELOCIDAD CARGADO.(con material) Km/Hr. 20.00 30.00 20.00 20.00 20.00
VELOCIDAD DESCARGADO.(sin material) Km/Hr. 30.00 40.00 30.00 30.00 30.00
TIEMPO CARGA Y DESCARGA. Min. 5.00 5.30 5.00 35.00 35.00
TIEMPO RECORRIDO CARGADO Form. 60 d /20 60 d /30 60 d /20 60 d /20 60 d /20
TIEMPO RECORRIDO DESCARGADO Form. 60 d /30 60 d /40 60 d /30 60 d /30 60 d /30
TIEMPO RECORRIDO Min. 5.00 3.50 5.00 5.00 5.00
CICLO Form. 5.00 + 5.00d 5.30 + 3.50d 5.00 + 5.00d 35.00 + 5.00d 35.00 + 5.00d
CICLO Min. 13.55 5.30 5.00 35.15 37.30
TIEMPO TRABAJADO POR DIA Min. 480.00 480.00 480.00 480.00 480.00
EFICIENCIA % 95.00% 95.00% 95.00% 95.00% 95.00%
TIEMPO UTIL TRABAJADO Min. 456.00 456.00 456.00 456.00 456.00
VOLUMEN DEL VOLQUETE M3. 10.00 10.00 10.00 7.57 7.57
VOLUMEN DEL CAMION CISTERNA. Gln. 2,000.00 2,000.00
NUMERO DE VIAJES AL DIA Un. 33.65 86.04 91.20 12.97 12.23
VOLUMEN TRANSPORTADO/DIA M3. 336.53 860.38 912.00 98.21 92.54
RENDIMIENTO m3/dia 337 860 912 98 93
DISTANCIA MEDIA - AFIRMADO A EMPLEARSE EN LA SUPERFICIE DE RODADURA - TRAMO I

INICIO DE TRAMO I FIN DE TRAMO I


PALCA KM 8+600
KM 0+000 PALCA
CASCANI
CANTERA N°1
KM 11+380

Inicio del Tramo 0+000.00 Espesor de afirmado 0.15 m


Fín de Tramo 8+600.00 Ancho de calzada 3.50 m
Factor de expansión 1.20 %
CANTERA INFLUENCIA DISTANCIA ACCESOS DISTANCIA VOLUMEN VOL. X DIST
DE AFIRMADO TOTAL
N° KM KM KM KM KM KM M3 KM - M3

1 17+500.00 18+850.00 19+569.00 0.360 1.350 1.710 5,418.00 9,262.071

TOTAL 5,418.00 9,262.07

Distancia Media = Total (Vol x Dist)


Tota (Volumen)
Distancia Media = 1.71 KM
DISTANCIA MEDIA DE BOTADEROS PARA LA ELIMINACION DE MATERIAL - TRAMO I

FIN DE TRAMO I
INICIO DE TRAMO I SAN JUAN - CASCANI
PALCA KM 8+600
KM 0+000

BOTADERO N° 1 BOTADERO N° 2 BOTADERO N°3


KM 0+600 KM 3+150 KM 6+580

Inicio del Tramo 0+000.00


Fín de Tramo 8+600.00

BOTADEROS INFLUENCIA DISTANCIA ACCESOS DISTANCIA VOLUMEN VOL. X DIST


TOTAL
N° KM KM KM KM KM KM M3 KM - M3

1 0+600.00 0+000.00 0+600.00 0.600 0.020 0.620 4350.70 2,697.434


0+600.00 1+875.00 1.275 0.020 1.295 12980.21 16,809.372
2 3+150.00 1+875.00 3+150.00 1.275 0.020 1.295 12980.21 16,809.372
3+150.00 4+865.00 1.715 0.020 1.735 9746.77 16,910.646
3 6+580.00 4+865.00 6+580.00 1.715 0.020 1.735 9746.77 16,910.646
6+580.00 8+600.00 2.020 0.020 2.040 26080.59 53,204.404
TOTAL 75,885.25 123,341.87

Distancia Media = Total (Vol x Dist)


Tota (Volumen)
Distancia Media = 1.63 KM
DISTANCIA MEDIA DE AGUA A EMPLEARSE EN LA SUPERFICIE DE RODADURA - OBRAS DE ARTE - TRAMO III

INICIO DE TRAMO III


TANTARA
KM 24+420

FIN DE TRAMO III


AURAHUA
F.A. N° 2 F.A. N° 3 F.A. N° 4 F.A. N° 5 F.A. N° 6 F.A. N° 7 F.A. N° 8 F.A. N° 9 KM 45+300
F.A. N° 10 F.A. N° 11
KM 25+160 KM 27+080 KM 29+400 KM 34+320 KM 36+760 KM 36+925 KM 39+310 KM 39+475 KM 41+230 KM 41+540

F.A. N° 1
KM 24+162

Inicio del Tramo 24+420.00


Fín de Tramo 45+300.00

FUENTES DE AGUA INFLUENCIA DISTANCIA ACCESOS DISTANCIA VOLUMEN VOL. X DIST


TOTAL
N° KM KM KM KM KM KM M3 KM - M3
1 24+162.00 24+420.00 24+532.00 0.112 0.258 0.370 67.20 24.864
2 25+160.00 24+532.00 26+619.00 2.087 0.030 2.117 1,252.20 2,650.907
3 27+080.00 26+619.00 27+080.00 0.461 0.030 0.491 276.60 135.811
27+080.00 28+240.00 1.160 0.030 1.190 696.00 828.240
4 29+400.00 28+240.00 29+400.00 1.160 0.030 1.190 696.00 828.240
29+400.00 31+860.00 2.460 0.030 2.490 1,476.00 3,675.240
5 34+320.00 31+860.00 34+320.00 2.460 0.030 2.490 1,476.00 3,675.240
34+320.00 35+540.00 1.220 0.030 1.250 732.00 915.000
6 36+760.00 35+540.00 36+760.00 1.220 0.030 1.250 732.00 915.000
36+760.00 36+842.50 0.083 0.030 0.113 49.50 5.569
7 36+925.00 36+842.50 36+925.00 0.083 0.030 0.113 49.50 5.569
36+925.00 38+117.50 1.193 0.030 1.223 715.50 874.699
8 39+310.00 38+117.50 39+310.00 1.193 0.030 1.223 715.50 874.699
39+310.00 39+392.50 0.083 0.030 0.113 49.50 5.569
9 39+475.00 39+392.50 39+475.00 0.083 0.030 0.113 49.50 5.569
39+475.00 40+352.50 0.878 0.030 0.908 526.50 477.799
10 41+230.00 40+352.50 41+230.00 0.878 0.030 0.908 526.50 477.799
41+230.00 41+385.00 0.155 0.030 0.185 93.00 17.205
11 41+540.00 41+385.00 45+300.00 3.915 0.030 3.945 2,349.00 9,266.805

TOTAL 5,940.00 11,818.54

Distancia Media = Total (Vol x Dist)


Tota (Volumen)
Distancia Media = 1.99 KM
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
1.00 OBRAS PRELIMINARES 544,102.00

1.01 MOVILIZ. Y DESMOVILIZACION GLB 1.00 440,602.00 440,602.00


1.02 ROCE Y LIMPIEZA M2 150,000.00 0.69 103,500.00

2.00 MOVIMIENTO DE TIERRAS 12,519,819.40

2.01 CORTE EN MATERIAL NO CLASIFICADO M3 785,115.00 12.06 9,468,486.90


2.02 REEMPLAZO DE MATERIAL INADECUADO M3 2,500.00 21.32 53,300.00
2.03 PERFILADO Y COMPACTACION M2 170,000.00 0.93 158,100.00
2.04 CONFORMACION DE TERRAPLENES M3 290,000.00 7.09 2,056,100.00
2.05 TERRAPLENES CON MAT.DE CANTERA M3 50,750.00 13.51 685,632.50
2.06 REMOCION DE DERRUMBES M3 20,000.00 4.91 98,200.00

3.00 PAVIMENTO 12,835,139.00

3.01 SUB BASE GRANULAR M3 85,900.00 28.77 2,471,343.00


3.02 BASE GRANULAR e = 0.20m M3 123,200.00 37.83 4,660,656.00
3.03 IMPRIMACION M2 589,300.00 1.94 1,143,242.00
3.04 TRATAMIENTO SUPERFICIAL BICAPA M2 503,300.00 9.06 4,559,898.00

4.00 TRANSPORTE 8,706,100.00

4.01 TRANSPORTE HASTA 1KM M3-KM 680,000.00 7.62 5,181,600.00


4.02 TRANSPORTE MATERIAL DESPUES DE 1 KM M3-KM 2,650,000.00 1.33 3,524,500.00

5.00 DRENAJE 9,317,335.25

5.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 14.38 28,760.00


5.02 LIMPIEZA DE CAUCES M3 2,000.00 9.14 18,280.00
5.03 ELIMINACION DE ALCANT. METALICAS M 300.00 6.83 2,049.00
5.04 DEMOLICION DE CONCRETO M3 500.00 65.09 32,545.00
5.05 EXCAVACION PARA ESTRUCTURAS M3 15,000.00 26.34 395,100.00
5.06 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31 463,100.00
5.07.01 ALCANTARILLA TMC D = 36" M 1,000.00 321.42 321,420.00
5.07.02 ALCANTARILLA TMC D = 48" M 500.00 487.36 243,680.00
5.07.03 ALCANTARILLA TMC D = 60" M 100.00 739.98 73,998.00
5.07.04 ALCANTARILLA TMC D = 72" M 100.00 931.88 93,188.00
5.07.05 ALCANTARILLA TMC D = 96" M 25.00 1,437.29 35,932.25
5.07.06 ALCANTARILLA TMC D =130" M 25.00 1,946.68 48,667.00
5.08.01 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 800.00 232.52 186,016.00
5.08.02 CONCRETO SIMPLE F'C=175 K/CM2 M3 800.00 308.25 246,600.00
5.08.03 CONCRETO SIMPLE F'C=210 K/CM2 M3 800.00 335.93 268,744.00
5.09 ENCOFRADO Y DESENCOFRADO M2 5,000.00 31.09 155,450.00
5.10 ACERO DE REFUERZO KG 10,000.00 2.50 25,000.00
5.11 CANAL ALIVIADERO EN ALCANTARILLAS M 200.00 27.56 5,512.00
5.12 PROTECCION DE CAUCES M3 500.00 136.54 68,270.00
5.13 JUNTA PARA BADENES M 100.00 53.01 5,301.00
5.14.01 CANAL PROVISIONAL DURANTE CONSTRUCC M 500.00 63.37 31,685.00
5.14.02 REPOSICION DE CANALES DE RIEGO M 500.00 112.61 56,305.00

:\OLLANTA\733895247.xls\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
5.15 SUBDREN LATERAL M 2,000.00 286.34 572,680.00
5.16 TUBERIA DE DESCARGA EN SUBDREN M 200.00 158.78 31,756.00
5.17 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 75.43 4,148,650.00
5.18.01 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 218.65 546,625.00
5.18.02 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 260.47 651,175.00
5.19 ZANJAS DE CORONACION SIN REV. M 2,000.00 23.92 47,840.00
5.20 ZANJA DE CORONACION REVESTIDA M 500.00 112.35 56,175.00
5.21 CANAL ALIVIADERO EN TALUD SUPERIOR M 50.00 98.56 4,928.00
5.22 ZANJA DE DRENAJE M 300.00 34.60 10,380.00
5.23 GAVION TIPO CAJA M3 2,000.00 138.23 276,460.00
5.24 GAVION TIPO COLCHON M3 200.00 255.94 51,188.00
5.25 GEOTEXTIL SEPARADOR M2 200.00 4.78 956.00
5.26 ENROCADO DE PROTECCION M3 2,000.00 56.46 112,920.00

6.00 OBRAS DE ARTE 7,160,250.00

6.01 MURO DE CONCRETO CICLOPEO M3 10,000.00 384.32 3,843,200.00


6.02 EXCAVACION PARA ESTRUCTURAS M3 20,000.00 26.34 526,800.00
6.03 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31 463,100.00
6.04 ENCOFRADO Y DESENCOFRADO M2 20,000.00 31.09 621,800.00
6.05 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 3,000.00 232.52 697,560.00
6.06 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,000.00 335.93 1,007,790.00

7.00 SE¥ALIZACION Y SEGURIDAD VIAL 1,031,165.82

7.01 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.95 399,000.00


7.02 SE¥ALES PREVENTIVAS UND 152.00 467.01 70,985.52
7.03 SE¥ALES REGLAMENTARIAS UND 42.00 424.12 17,813.04
7.04.01 SE¥ALES INFORMATIVAS M2 16.00 457.47 7,319.52
7.04.02 CIMENTACION DE SE¥ALES INFORMATIVAS M3 20.00 496.29 9,925.80
7.04.03 TUBO D = 3" M 150.00 101.35 15,202.50
7.05 POSTES KILOMETRICOS UND 16.00 156.14 2,498.24
7.06 POSTES DELINEADORES UND 2,200.00 129.13 284,086.00
7.07 GUARDAVIAS NUEV0S (INCLUYE TERMINAL) M 1,680.00 132.39 222,415.20
7.08 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00 1,920.00

8.00 IMPACTO AMBIENTAL 2,081,268.18

8.01 REHAB. AREA AFECTADA POR CONST.CAMP GLB 1.00 39,791.20 39,791.20
8.02 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 22,941.23 22,941.23
8.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 29,117.94 174,707.64
8.04 REHAB. DE BOTADEROS UND 15.00 21,617.94 324,269.10
8.05 CONFORM.DE MATERIAL EN BOTADEROS M3 522,500.00 2.72 1,421,200.00
8.06 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,679.92 2,679.92
8.07 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,988.23 4,988.23
8.08 SEÑALIZACION AMBIENTAL GLB 1.00 25,799.26 25,799.26
8.09 EDUCACION AMBIENTAL GLB 1.00 1,346.60 1,346.60
8.10 EXPROPIACION DE ZONAS RURALES M2 500.00 125.47 62,735.00
8.11 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 0.81 810.00

:\OLLANTA\733895247.xls\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
9.00 VARIOS 378,473.20

9.01 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 866.33 173,266.00


9.02 REUBIC.DE POSTES DE LUZ UND 20.00 885.84 17,716.80
9.03 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60 18,312.00
9.04 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 44.00 4,400.00
9.05 REFORZ. TUBERIA DESAGUE M 100.00 26.12 2,612.00
9.06 ELEVACION DE BUZONES UND 20.00 130.12 2,602.40
9.07 MANTENIMIENTO DE TRANSITO DIA 240.00 664.85 159,564.00

COSTO DIRECTO 54,573,652.85

GASTOS GENERALES 7.459896% 4,071,138.00

UTILIDAD 10.00% 5,457,365.29

SUB_TOTAL 64,102,156.14

I.G.V. 18.00% 11,538,388.11

TOTAL INC. I.G.V. 75,640,544.25

:\OLLANTA\733895247.xls\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
1.00 OBRAS PRELIMINARES 544,102.00

1.01 MOVILIZ. Y DESMOVILIZACION GLB 1.00 440,602.00 440,602.00


1.02 ROCE Y LIMPIEZA M2 150,000.00 0.69 103,500.00

2.00 MOVIMIENTO DE TIERRAS 12,519,819.40

2.01 CORTE EN MATERIAL NO CLASIFICADO M3 785,115.00 12.06 9,468,486.90


2.02 REEMPLAZO DE MATERIAL INADECUADO M3 2,500.00 21.32 53,300.00
2.03 PERFILADO Y COMPACTACION M2 170,000.00 0.93 158,100.00
2.04 CONFORMACION DE TERRAPLENES M3 290,000.00 7.09 2,056,100.00
2.05 TERRAPLENES CON MAT.DE CANTERA M3 50,750.00 13.51 685,632.50
2.06 REMOCION DE DERRUMBES M3 20,000.00 4.91 98,200.00

3.00 PAVIMENTO 7,131,999.00

3.01 SUB BASE GRANULAR M3 85,900.00 28.77 2,471,343.00


3.02 BASE GRANULAR e = 0.20m M3 123,200.00 37.83 4,660,656.00

4.00 TRANSPORTE 8,430,400.00

4.01 TRANSPORTE HASTA 1KM M3-KM 670,000.00 7.62 5,105,400.00


4.02 TRANSPORTE MATERIAL DESPUES DE 1 KM M3-KM 2,500,000.00 1.33 3,325,000.00

5.00 DRENAJE 9,317,335.25

5.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 14.38 28,760.00


5.02 LIMPIEZA DE CAUCES M3 2,000.00 9.14 18,280.00
5.03 ELIMINACION DE ALCANT. METALICAS M 300.00 6.83 2,049.00
5.04 DEMOLICION DE CONCRETO M3 500.00 65.09 32,545.00
5.05 EXCAVACION PARA ESTRUCTURAS M3 15,000.00 26.34 395,100.00
5.06 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31 463,100.00
5.07.01 ALCANTARILLA TMC D = 36" M 1,000.00 321.42 321,420.00
5.07.02 ALCANTARILLA TMC D = 48" M 500.00 487.36 243,680.00
5.07.03 ALCANTARILLA TMC D = 60" M 100.00 739.98 73,998.00
5.07.04 ALCANTARILLA TMC D = 72" M 100.00 931.88 93,188.00
5.07.05 ALCANTARILLA TMC D = 96" M 25.00 1,437.29 35,932.25
5.07.06 ALCANTARILLA TMC D =130" M 25.00 1,946.68 48,667.00
5.08.01 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 800.00 232.52 186,016.00
5.08.02 CONCRETO SIMPLE F'C=175 K/CM2 M3 800.00 308.25 246,600.00
5.08.03 CONCRETO SIMPLE F'C=210 K/CM2 M3 800.00 335.93 268,744.00
5.09 ENCOFRADO Y DESENCOFRADO M2 5,000.00 31.09 155,450.00
5.10 ACERO DE REFUERZO KG 10,000.00 2.50 25,000.00
5.11 CANAL ALIVIADERO EN ALCANTARILLAS M 200.00 27.56 5,512.00
5.12 PROTECCION DE CAUCES M3 500.00 136.54 68,270.00
5.13 JUNTA PARA BADENES M 100.00 53.01 5,301.00
5.14.01 CANAL PROVISIONAL DURANTE CONSTRUCC M 500.00 63.37 31,685.00
5.14.02 REPOSICION DE CANALES DE RIEGO M 500.00 112.61 56,305.00
5.15 SUBDREN LATERAL M 2,000.00 286.34 572,680.00
5.16 TUBERIA DE DESCARGA EN SUBDREN M 200.00 158.78 31,756.00

:\OLLANTA\733895247.xls\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
5.17 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 75.43 4,148,650.00
5.18.01 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 218.65 546,625.00
5.18.02 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 260.47 651,175.00
5.19 ZANJAS DE CORONACION SIN REV. M 2,000.00 23.92 47,840.00
5.20 ZANJA DE CORONACION REVESTIDA M 500.00 112.35 56,175.00
5.21 CANAL ALIVIADERO EN TALUD SUPERIOR M 50.00 98.56 4,928.00
5.22 ZANJA DE DRENAJE M 300.00 34.60 10,380.00
5.23 GAVION TIPO CAJA M3 2,000.00 138.23 276,460.00
5.24 GAVION TIPO COLCHON M3 200.00 255.94 51,188.00
5.25 GEOTEXTIL SEPARADOR M2 200.00 4.78 956.00
5.26 ENROCADO DE PROTECCION M3 2,000.00 56.46 112,920.00

6.00 OBRAS DE ARTE 7,160,250.00

6.01 MURO DE CONCRETO CICLOPEO M3 10,000.00 384.32 3,843,200.00


6.02 EXCAVACION PARA ESTRUCTURAS M3 20,000.00 26.34 526,800.00
6.03 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31 463,100.00
6.04 ENCOFRADO Y DESENCOFRADO M2 20,000.00 31.09 621,800.00
6.05 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 3,000.00 232.52 697,560.00
6.06 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,000.00 335.93 1,007,790.00

7.00 SE¥ALIZACION Y SEGURIDAD VIAL 1,031,165.82

7.01 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.95 399,000.00


7.02 SE¥ALES PREVENTIVAS UND 152.00 467.01 70,985.52
7.03 SE¥ALES REGLAMENTARIAS UND 42.00 424.12 17,813.04
7.04.01 SE¥ALES INFORMATIVAS M2 16.00 457.47 7,319.52
7.04.02 CIMENTACION DE SE¥ALES INFORMATIVAS M3 20.00 496.29 9,925.80
7.04.03 TUBO D = 3" M 150.00 101.35 15,202.50
7.05 POSTES KILOMETRICOS UND 16.00 156.14 2,498.24
7.06 POSTES DELINEADORES UND 2,200.00 129.13 284,086.00
7.07 GUARDAVIAS NUEV0S (INCLUYE TERMINAL) M 1,680.00 132.39 222,415.20
7.08 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00 1,920.00

8.00 IMPACTO AMBIENTAL 2,081,268.18

8.01 REHAB. AREA AFECTADA POR CONST.CAMP GLB 1.00 39,791.20 39,791.20
8.02 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 22,941.23 22,941.23
8.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 29,117.94 174,707.64
8.04 REHAB. DE BOTADEROS UND 15.00 21,617.94 324,269.10
8.05 CONFORM.DE MATERIAL EN BOTADEROS M3 522,500.00 2.72 1,421,200.00
8.06 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,679.92 2,679.92
8.07 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,988.23 4,988.23
8.08 SEÑALIZACION AMBIENTAL GLB 1.00 25,799.26 25,799.26
8.09 EDUCACION AMBIENTAL GLB 1.00 1,346.60 1,346.60
8.10 EXPROPIACION DE ZONAS RURALES M2 500.00 125.47 62,735.00
8.11 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 0.81 810.00

9.00 VARIOS 378,473.20

:\OLLANTA\733895247.xls\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
9.01 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 866.33 173,266.00
9.02 REUBIC.DE POSTES DE LUZ UND 20.00 885.84 17,716.80
9.03 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60 18,312.00
9.04 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 44.00 4,400.00
9.05 REFORZ. TUBERIA DESAGUE M 100.00 26.12 2,612.00
9.06 ELEVACION DE BUZONES UND 20.00 130.12 2,602.40
9.07 MANTENIMIENTO DE TRANSITO DIA 240.00 664.85 159,564.00

COSTO DIRECTO 48,594,812.85

GASTOS GENERALES 8.377721% 4,071,138.00

UTILIDAD 10.00% 4,859,481.29

SUB_TOTAL 57,525,432.14

I.G.V. 18.00% 10,354,577.79

TOTAL INC. I.G.V. 67,880,009.93

:\OLLANTA\733895247.xls\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
1.00 OBRAS PRELIMINARES #REF!

1.01 MOVILIZ. Y DESMOVILIZACION GLB 1.00 #REF! #REF!


1.02 ROCE Y LIMPIEZA M2 170,000.00 0.29 49,300.00

2.00 MOVIMIENTO DE TIERRAS 15,359,148.65

2.01 CORTE EN MATERIAL NO CLASIFICADO M3 1,009,645.00 11.05 11,156,577.25


2.02 REEMPLAZO DE MATERIAL INADECUADO M3 2,500.00 20.40 51,000.00
2.03 PERFILADO Y COMPACTACION M2 170,000.00 0.93 158,100.00
2.04 CONFORMACION DE TERRAPLENES M3 256,348.00 8.05 2,063,601.40
2.05 REMOCION DE DERRUMBES M3 20,000.00 4.53 90,600.00
2.06 CONFORM.DE MATERIAL EN BOTADEROS M3 828,500.00 2.22 1,839,270.00

3.00 PAVIMENTO 10,615,740.95

3.01 SUB BASE GRANULAR M3 82,005.00 23.62 1,936,958.10


3.02 BASE GRANULAR e = 0.20m M3 117,170.00 31.16 3,651,017.20
3.03 IMPRIMACION M2 542,030.00 1.67 905,190.10
3.04 TRATAMIENTO SUPERFICIAL BICAPA M2 497,295.00 8.29 4,122,575.55

4.00 TRANSPORTE 7,851,722.95

4.01 TRANSPORTE HASTA 1KM M3-KM 938,555.00 4.55 4,270,425.25


4.02 TRANSPORTE MATERIAL DESPUES DE 1 KM M3-KM 3,169,290.00 1.13 3,581,297.70

5.00 DRENAJE 6,871,965.25

5.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 12.32 24,640.00


5.02 LIMPIEZA DE CAUCES M3 2,000.00 7.59 15,180.00
5.03 ELIMINACION DE ALCANT. METALICAS M 300.00 6.77 2,031.00
5.04 DEMOLICION DE CONCRETO M3 500.00 24.18 12,090.00
5.05 EXCAVACION PARA ESTRUCTURAS M3 15,000.00 26.28 394,200.00
5.06 RELLENO PARA ESTRUCTURAS M3 10,000.00 27.97 279,700.00
5.07.01 ALCANTARILLA TMC D = 36" M 1,000.00 314.94 314,940.00
5.07.02 ALCANTARILLA TMC D = 48" M 500.00 478.43 239,215.00
5.07.03 ALCANTARILLA TMC D = 60" M 100.00 728.29 72,829.00
5.07.04 ALCANTARILLA TMC D = 72" M 100.00 917.71 91,771.00
5.07.05 ALCANTARILLA TMC D =130" M 25.00 1,920.81 48,020.25
5.08.01 CONC. CICLOPEO F'C=175 KG/CM2 + 30%P.M. M3 800.00 176.21 140,968.00
5.08.02 CONCRETO SIMPLE F'C=210 K/CM2 M3 800.00 261.82 209,456.00
5.09 ENCOFRADO Y DESENCOFRADO M2 5,000.00 30.96 154,800.00
5.10 ACERO DE REFUERZO KG 10,000.00 2.47 24,700.00
5.11 ALIVIADERO EN ALCANTARILLAS M2 200.00 73.96 14,792.00
5.12 PROTECCION DE CAUCES EN BADENES M3 500.00 47.24 23,620.00
5.13 JUNTA PARA BADENES M 100.00 14.16 1,416.00
5.14.01 CANAL PROVISIONAL DURANTE CONSTRUCC M 500.00 51.18 25,590.00
5.14.02 REPOSICION DE CANALES DE RIEGO M 500.00 96.54 48,270.00
5.15 SUBDREN LATERAL M 2,000.00 157.08 314,160.00
5.16 TUBERIA DE DESCARGA EN SUBDREN M 200.00 122.18 24,436.00

:\OLLANTA\733895247.xls\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
5.17 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 60.75 3,341,250.00
5.18.01 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 117.75 294,375.00
5.18.02 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 127.54 318,850.00
5.19 ZANJAS DE CORONACION SIN REVESTIR M 2,000.00 14.73 29,460.00
5.20 ZANJA DE CORONACION REVESTIDA M 500.00 53.51 26,755.00
5.21 REVESTIMIENTO CON PIEDRA EMBOQUILLA M2 50.00 40.70 2,035.00
5.22 ZANJA DE DRENAJE M 300.00 37.92 11,376.00
5.23 GAVION TIPO CAJA M3 2,000.00 123.37 246,740.00
5.24 GAVION TIPO COLCHON M3 200.00 240.82 48,164.00
5.25 GEOTEXTIL SEPARADOR M2 200.00 4.78 956.00
5.26 ENROCADO DE PROTECCION M3 2,000.00 37.59 75,180.00

6.00 OBRAS DE ARTE 11,494,710.00

6.01 MURO DE CONCRETO CICLOPEO M3 22,000.00 334.21 7,352,620.00


6.02 EXCAVACION PARA ESTRUCTURAS M3 40,000.00 26.28 1,051,200.00
6.03 RELLENO PARA ESTRUCTURAS M3 20,000.00 27.97 559,400.00
6.04 ENCOFRADO Y DESENCOFRADO M2 40,000.00 30.96 1,238,400.00
6.05 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 3,000.00 169.21 507,630.00
6.06 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,000.00 261.82 785,460.00

7.00 SEÑALIZACION Y SEGURIDAD VIAL 856,269.74

7.01 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.89 397,800.00


7.02 SEÑALES PREVENTIVAS UND 152.00 322.83 49,070.16
7.03 SEÑALES REGLAMENTARIAS UND 42.00 299.81 12,592.02
7.04.01 SEÑALES INFORMATIVAS M2 16.00 364.83 5,837.28
7.04.02 CIMENTACION DE SEÑALES INFORMATIVAS M3 20.00 299.87 5,997.40
7.04.03 TUBO D = 3" M 150.00 119.24 17,886.00
7.05 POSTES KILOMETRICOS UND 16.00 100.43 1,606.88
7.06 POSTES DELINEADORES UND 2,200.00 68.12 149,864.00
7.07 GUARDAVIAS NUEV0S (INCLUYE TERMINAL) M 1,680.00 127.20 213,696.00
7.08 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00 1,920.00

8.00 IMPACTO AMBIENTAL #REF!

8.01 REHAB. AREA AFECTADA POR CONST.CAMP GLB 1.00 21,242.90 21,242.90
8.02 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 24,431.13 24,431.13
8.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 32,376.28 194,257.68
8.04 REHAB. DE BOTADEROS UND 15.00 24,876.28 373,144.20
8.06 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,507.10 2,507.10
8.07 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,803.68 4,803.68
8.08 SEÑALIZACION AMBIENTAL GLB 1.00 24,115.04 24,115.04
8.09 EDUCACION AMBIENTAL GLB 1.00 1,346.60 1,346.60
8.10 EXPROPIACION DE ZONAS RURALES M2 500.00 123.76 61,880.00
8.11 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 #REF! #REF!

9.00 VARIOS 269,672.40

9.01 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 342.33 68,466.00

:\OLLANTA\733895247.xls\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
9.02 REUBIC.DE POSTES DE LUZ UND 20.00 885.84 17,716.80
9.03 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60 18,312.00
9.04 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 43.45 4,345.00
9.05 REFORZ. TUBERIA DESAGUE M 100.00 25.66 2,566.00
9.06 ELEVACION DE BUZONES UND 20.00 114.41 2,288.20
9.07 MANTENIMIENTO DE TRANSITO DIA 240.00 649.91 155,978.40

COSTO DIRECTO #REF!

GASTOS GENERALES #REF! #REF!

UTILIDAD 10.00% #REF!

SUB_TOTAL #REF!

I.G.V. 18.00% #REF!

TOTAL INC. I.G.V. #REF!

:\OLLANTA\733895247.xls\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
100.00 OBRAS PRELIMINARES #REF!

101.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 #REF! #REF!


102.00 TRAZO Y REPLANTEO KM 84.47 1,051.69 88,836.25
103.00 MANTENIMIENTO DE TRANSITO GLB 1.00 155,932.74 155,932.74

200.00 MOVIMIENTO DE TIERRAS 13,570,046.16

202.00 LIMPIEZA GENERAL Y ROCE HA 17.00 2,951.03 50,167.51


205.00 EXCAVACION NO CLASIFICADA PARA EXPLANACIONES M3 1,009,645.00 11.05 11,156,577.25
206.00 REMOCION DE DERRUMBES M3 20,000.00 4.53 90,600.00
210.00 CONFORMACION DE TERRAPLENES M3 256,348.00 8.05 2,063,601.40
220.00 EXCAVACION PARA MEJORAMIENTO DE SUB-RASANTE M3 2,500.00 20.40 51,000.00
220.02 PERFILADO Y COMPACTADO EN ZONA DE CORTE M2 170,000.00 0.93 158,100.00

300.00 SUB-BASE Y BASE 5,587,975.30

303.00 SUB BASE GRANULAR M3 82,005.00 23.62 1,936,958.10


305.00 BASE GRANULAR M3 117,170.00 31.16 3,651,017.20

400.00 PAVIMENTO ASFALTICO 4,644,095.85

401.00 IMPRIMACION ASFALTICA M2 542,030.00 0.63 341,478.90


405.00 TRATAMIENTO SUPERFICIAL BICAPA M2 497,295.00 3.85 1,914,585.75
421.00 ASFALTO LIQUIDO GLN 552,785.00 4.32 2,388,031.20

600.00 OBRAS DE ARTE Y DRENAJE 14,841,112.75

600.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 12.32 24,640.00


600.02 LIMPIEZA DE CAUCES O ENCAUZAMIENTO M3 2,000.00 7.59 15,180.00
600.03 DEMOLICION DE ESTRUCTURAS M3 500.00 24.18 12,090.00
600.04 ELIMINACION DE ALCANTARILLAS METALICAS M 300.00 6.77 2,031.00
601.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 35,000.00 26.28 919,800.00
605.00 RELLENO PARA ESTRUCTURAS M3 30,000.00 27.97 839,100.00
605.01 MATERIAL FILTRANTE M3 5,500.00 46.18 253,990.00
610.01 CONCRETO CICLOPEO F'C=140 KG/CM2 M3 3,000.00 169.21 507,630.00
610.02 CONCRETO CICLOPEO F'C=175 KG/CM2 M3 22,800.00 176.21 4,017,588.00
610.05 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,800.00 261.82 994,916.00
610.10 ENCOFRADO Y DESENCOFRADO DE CIMENTACION M2 6,750.00 30.96 208,980.00
610.11 ENCOFRADO Y DESENCOFRADO DE MURO EXPUESTO M2 38,000.00 36.75 1,396,500.00
610.12 ENCOFRADO Y DESENCOFRADO DE LOSA M2 250.00 36.75 9,187.50
610.20 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 10,000.00 2.47 24,700.00
610.30 JUNTA DE DILATACION Y CONSTRUCCION LOSA/BADEN M 100.00 14.16 1,416.00
622.01 ALCANTARILLA T.M.C. D = 36" M 1,000.00 314.94 314,940.00
622.02 ALCANTARILLA T.M.C. D = 48" M 500.00 478.43 239,215.00
622.03 ALCANTARILLA T.M.C. D = 60" M 100.00 728.29 72,829.00
622.04 ALCANTARILLA T.M.C. D = 72" M 100.00 917.71 91,771.00
622.10 ALCANTARILLA ARMCO T.M.C. L<4.80m ( D = 130" ) M 25.00 1,920.81 48,020.25
625.01 SUBDREN LATERAL PROFUNDO M 2,000.00 157.37 314,740.00
625.10 TUBERIA DE DESCARGA EN SUBDREN M 200.00 122.18 24,436.00
635.01 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 60.75 3,341,250.00
635.02 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 117.75 294,375.00

:\OLLANTA\733895247.xls\PPTO (3)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
635.03 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 127.54 318,850.00
635.20 REVESTIMIENTO CON PIEDRA EMBOQUILLADA M2 50.00 40.70 2,035.00
635.30 ENROCADO DE PROTECCION M3 2,000.00 37.59 75,180.00
650.01 GEOTEXTIL SEPARADOR M2 200.00 4.78 956.00
670.01 GAVION TIPO CAJON M3 2,000.00 123.37 246,740.00
670.10 GAVION TIPO COLCHON M3 200.00 240.82 48,164.00
670.15 ALIVIADERO EN ALCANTARILLAS M2 200.00 73.96 14,792.00
670.20 ZANJA DE CORONACION REVESTIDA M 500.00 53.51 26,755.00
670.30 ZANJA DE CORONACION NO REVESTIDA M 2,000.00 14.73 29,460.00
670.51 ZANJA DE DRENAJE M 300.00 37.92 11,376.00
670.52 PROTECCION DE CAUCES EN BADENES M3 500.00 47.24 23,620.00
670.53 CANAL PROVISIONAL DURANTE CONSTRUCCION M 500.00 51.18 25,590.00
670.54 REPOSICION DE CANALES DE RIEGO M 500.00 96.54 48,270.00

700.00 TRANSPORTE 7,851,722.95

701.01 TRANSPORTE MAT. PROVENIENTE DE CANTERA HASTA 1KM3-KM 206,775.00 4.55 940,826.25
701.02 TRANSPORTE MAT. PROV. EXCAV. DE EXPLAN. HASTA 1K M3-KM 711,780.00 4.55 3,238,599.00
701.03 TRANSPORTE MAT. PROV.DERRUMBES HASTA 1KM M3-KM 20,000.00 4.55 91,000.00
702.01 TRANSPORTE MAT. PROVENIENTE DE CANTERA MAYOR 1 M3-KM 2,755,040.00 1.13 3,113,195.20
702.02 TRANSPORTE MAT. PROV. EXCAV. DE EXPLAN. MAYOR 1KM3-KM 404,250.00 1.13 456,802.50
702.03 TRANSPORTE MAT. PROV.DERRUMBES MAYOR 1KM M3-KM 10,000.00 1.13 11,300.00

800.00 SEÑALIZACION Y SEGURIDAD VIAL 856,269.74

801.00 SEÑALES PREVENTIVAS UND 152.00 322.83 49,070.16


802.00 SEÑALES REGLAMENTARIAS UND 42.00 299.81 12,592.02
803.00 SEÑALES INFORMATIVAS M2 16.00 364.83 5,837.28
804.00 POSTE DE FIJACION DE SEÑALES INFORMATIVAS D = 3" M 150.00 119.24 17,886.00
804.10 CIMENTACION DE SEÑALES INFORMATIVAS M3 20.00 299.87 5,997.40
805.00 POSTES DELINEADORES UND 2,200.00 68.12 149,864.00
810.00 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.89 397,800.00
820.00 GUARDAVIAS INCLUYE TERMINAL M 1,680.00 127.20 213,696.00
830.00 HITOS DE KILOMETRAJE UND 16.00 100.43 1,606.88
840.00 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00 1,920.00

900.00 IMPACTO AMBIENTAL 2,485,118.33

902.01 REHAB. DE BOTADEROS UND 15.00 24,876.28 373,144.20


902.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 32,376.28 194,257.68
906.00 ACONDICIONAMIENTO DE MATERIAL EN BOTADERO M3 828,500.00 2.22 1,839,270.00
907.00 REHAB. AREA AFECTADA POR CONST.CAMPAMENTOS GLB 1.00 21,242.90 21,242.90
908.00 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 24,431.13 24,431.13
909.00 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,507.10 2,507.10
909.01 SEÑALIZACION AMBIENTAL GLB 1.00 24,115.04 24,115.04
909.02 EDUCACION AMBIENTAL GLB 1.00 1,346.60 1,346.60
910.00 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,803.68 4,803.68

9100.00 VARIOS #REF!

9103.00 EXPROPIACION DE ZONAS RURALES M2 500.00 123.76 61,880.00


9104.00 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 #REF! #REF!

:\OLLANTA\733895247.xls\PPTO (3)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99 T.C. S/. 3.493 = 1 US$
ÍTEM DESCRIPCION UND METRADO PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
9105.01 REUBIC.DE POSTES DE LUZ UND 20.00 885.84 17,716.80
9105.02 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60 18,312.00
9106.00 ELEVACION DE BUZONES UND 20.00 114.41 2,288.20
9151.00 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 342.33 68,466.00
9152.00 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 43.45 4,345.00
9153.00 REFORZ. TUBERIA DESAGUE M 100.00 25.66 2,566.00

COSTO DIRECTO #REF!

GASTOS GENERALES #REF! #REF!

UTILIDAD 10.00% #REF!

SUB_TOTAL #REF!

I.G.V. 18.00% #REF!

TOTAL INC. I.G.V. #REF!

:\OLLANTA\733895247.xls\PPTO (3)