AKASH METAL FORMING

TITLE: PROCEDURE FOR DESIGN AND DEVELOPMENT


REF. NO. : AMF-QSP-11
REV. NO. : 00
REV DATE : 01.11.2017
PURPOSE: To define the Continuous Improvement process that is applied at our Company.

SCOPE: The scope of this procedure is applicable to all personnel.

SLNo Input Reference No. Resp. Interaction Out put Reference

1 1. Customer Drawing 1. New Product


2. Initial Feasibility CFT/ Engg All employees timeplan
report MP 2. Feasibility
3. Technical Review Project team study
report 3. List of dies.
PROCEDURE :-

 Design Inputs
 Design and Development
 Design and Development Review
 Design Verification
 Design Validation and Testing
 Project Assessment

Prepared by : Production In charge Approved By; MP