RME Workshops Area 14/10/2015 1 2 3 4 5 1 - 6 2 4 6 8 10 7 - 14 3 6 9 12 15 4 8 12 16 20 5 10 15 20 25 15 - 25
RME Workshops Area 14/10/2015 1 2 3 4 5 1 - 6 2 4 6 8 10 7 - 14 3 6 9 12 15 4 8 12 16 20 5 10 15 20 25 15 - 25
All outcomes and consequences listed Ensure all supervisors and operatives employed in the use of, installation,
Human error
below. testing, inspection and maintenance or dismantling of cranes is competent &
experienced and adequately inducted.
Mobile crane or load falling due to poor All mobile cranes must be of the design standard stipulated CSM
Structural failure design / erection / overloading policy. All personnel erecting, using or dismantling cranes to be
suitably trained and competent and adhere to RA / MS. Ensure the
crane is maintained, inspected.
Mobile crane collapse / Crane & load collapsing / overturning Ensure that the location / ground condition / base survey has been conducted by
overturn due to being unstable a competent person. Traffic route to be suitable and Traffic precautions to be in
place and communicated.
Exclusion zones and lifting plan need to be established during lifting operations.
Falling objects Injury / fatality or damage to property