SUBJECT : INVOICE
Note:
Monthly Invoiced
TOTAL
PPN
PPH 23
SUBTOTAL
Invoice Amount
Monthly Invoiced
IDR 61,282,000.00
IDR 115,440,000.00
IDR 112,320,000.00
IDR 93,600,000.00
IDR 99,060,000.00
IDR 71,760,000.00
IDR 553,462,000.00
IDR 60,880,820.00
IDR (11,069,240.00)
IDR 603,273,580.00
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / DOZER 101 IDR 575,000.00 1 20-Dec-22 30-Dec-22 24.6 26.5 2.1 50 IDR 28,750,000.00
LIUGONG / DOZER 102 IDR 575,000.00 1 20-Dec-22 30-Dec-22 13.5 54.4 40.9 50 IDR 28,750,000.00
LIUGONG / GRADER 103 IDR 425,000.00 1 20-Dec-22 30-Dec-22 9.0 75.4 66.4 50 IDR 28,220,000.00
KOMATSU / EXCA 201 IDR 350,000.00 1 20-Dec-22 30-Dec-22 2,163.9 2,179.8 11.6 -4.3 50 IDR 17,500,000.00
KOMATSU / EXCA 202 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
KOMATSU / EXCA 203 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
KOMATSU / EXCA 204 IDR 350,000.00 1 20-Dec-22 30-Dec-22 14.7 89.1 74.4 50 IDR 26,040,000.00
KOMATSU / EXCA 205 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
KOMATSU / EXCA 206 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
KOMATSU / EXCA 207 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
KOMATSU / EXCA 208 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
KOMATSU / EXCA 209 IDR 350,000.00 1 20-Dec-22 30-Dec-22 16.0 102.4 74.1 -12.3 50 IDR 25,935,000.00
KOBELCO / EXCA 210 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
CAT / EXCA 211 IDR 350,000.00 1 20-Dec-22 30-Dec-22 1,183.6 1,201.3 17.7 50 IDR 6,195,000.00
LIUGONG / EXCA 212 IDR 350,000.00 1 20-Dec-22 30-Dec-22 50 IDR 17,500,000.00
DOOSAN / EXCA 301 IDR 550,000.00 1 20-Dec-22 30-Dec-22 6.6 27.5 20.9 50 IDR 27,500,000.00
DOOSAN / EXCA 302 IDR 550,000.00 1 20-Dec-22 30-Dec-22 8.0 30.7 22.7 50 IDR 27,500,000.00
DOOSAN / EXCA 303 IDR 550,000.00 1 20-Dec-22 30-Dec-22 4.7 30.3 25.6 50 IDR 27,500,000.00
FUSO / DT 401 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 402 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 403 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 404 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 405 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 406 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 407 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 408 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 409 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
FUSO / DT 410 IDR 2,833,333.00 1 20-Dec-22 30-Dec-22 10 IDR 28,333,330.00
Note: TOTAL IDR 678,528,300.00
Unit Exca 201 (HM 2169,1 - 2173,4) Maintenance Perform PPN IDR 74,638,113.00
Unit Exca 209 (HM 76,6 - 88,9 pada tgl 29-30 ) Maintenance Perform PPH 23 IDR (13,570,566.00)
SUBTOTAL IDR 739,595,847.00
Please transfer your payment to:
Account Name : CV. Putra Gemilang Perkasa
Account No. : 1520094777477
Name of Bank : Bank Mandiri
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 IDR 425,000.00 1 01-Jan-23 31-Jan-23 75.4 362.6 287.2 -1 200 IDR 122,060,000.00
LIUGONG / DOZER 102 IDR 575,000.00 1 01-Jan-23 31-Jan-23 26.5 250.4 223.9 200 IDR 128,742,500.00
LIUGONG / DOZER103 IDR 575,000.00 1 01-Jan-23 31-Jan-23 54.4 204.5 150.1 200 IDR 115,000,000.00
KOMATSU / EXCA 201 IDR 350,000.00 1 01-Jan-23 31-Jan-23 2,179.8 2,436.2 256.4 200 IDR 89,740,000.00
KOMATSU / EXCA 202 IDR 350,000.00 1 01-Jan-23 31-Jan-23 18.5 203.2 184.7 200 IDR 70,000,000.00
KOMATSU / EXCA 203 IDR 350,000.00 1 01-Jan-23 31-Jan-23 25.8 156.6 130.8 200 IDR 70,000,000.00
KOMATSU / EXCA 204 IDR 350,000.00 1 01-Jan-23 31-Jan-23 89.1 283.7 194.6 200 IDR 70,000,000.00
KOMATSU / EXCA 205 IDR 350,000.00 1 01-Jan-23 31-Jan-23 16.5 195.2 178.7 200 IDR 70,000,000.00
KOMATSU / EXCA 206 IDR 350,000.00 1 01-Jan-23 31-Jan-23 15.1 183.7 168.6 200 IDR 70,000,000.00
KOMATSU / EXCA 207 IDR 350,000.00 1 01-Jan-23 31-Jan-23 15.6 117.2 101.6 200 IDR 70,000,000.00
KOMATSU / EXCA 208 IDR 350,000.00 1 01-Jan-23 31-Jan-23 15.6 172.0 156.4 200 IDR 70,000,000.00
KOMATSU / EXCA 209 IDR 350,000.00 1 01-Jan-23 31-Jan-23 102.4 373.8 271.4 200 IDR 94,990,000.00
KOBELCO / EXCA 210 IDR 350,000.00 1 01-Jan-23 31-Jan-23 8.6 189.5 180.9 200 IDR 70,000,000.00
CAT / EXCA 211 IDR 350,000.00 1 01-Jan-23 31-Jan-23 1,201.3 1,493.1 291.8 200 IDR 102,130,000.00
LIUGONG / EXCA 212 IDR 350,000.00 1 01-Jan-23 31-Jan-23 1,079.7 1,253.0 173.3 200 IDR 70,000,000.00
DOOSAN / EXCA 301 IDR 550,000.00 1 01-Jan-23 31-Jan-23 27.5 337.6 310.1 200 IDR 170,555,000.00
DOOSAN / EXCA 302 IDR 550,000.00 1 01-Jan-23 31-Jan-23 30.7 314.9 284.2 200 IDR 156,310,000.00
DOOSAN / EXCA 303 IDR 550,000.00 1 01-Jan-23 31-Jan-23 30.3 353.7 323.4 200 IDR 177,870,000.00
FUSO / DT 401 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 402 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 403 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 404 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 405 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 406 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 407 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 408 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 409 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
FUSO / DT 410 IDR 85,000,000.00 1 01-Jan-23 31-Jan-23 31 IDR 85,000,000.00
Note: TOTAL IDR 2,637,397,500.00
PPN IDR 290,113,725.00
PPH 23 IDR (52,747,950.00)
SUBTOTAL IDR 2,874,763,275.00
Please transfer your payment to:
Account Name : CV. Putra Gemilang Perkasa
Account No. : 1520094777477
Name of Bank : Bank Mandiri
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 IDR 425,000.00 1 01-Feb-23 28-Feb-23 362.6 403.2 40.6 200 IDR 85,000,000.00
LIUGONG / DOZER 102 IDR 575,000.00 1 01-Feb-23 28-Feb-23 250.4 266.5 16.1 200 IDR 115,000,000.00
LIUGONG / DOZER 103 IDR 575,000.00 1 01-Feb-23 28-Feb-23 204.5 229.0 24.5 200 IDR 115,000,000.00
KOMATSU / EXCA 201 IDR 350,000.00 1 01-Feb-23 28-Feb-23 2,436.2 2,471.0 34.8 200 IDR 70,000,000.00
KOMATSU / EXCA 202 IDR 350,000.00 1 01-Feb-23 28-Feb-23 203.2 228.2 25.0 200 IDR 70,000,000.00
KOMATSU / EXCA 203 IDR 350,000.00 1 01-Feb-23 28-Feb-23 156.6 181.4 24.8 200 IDR 70,000,000.00
KOMATSU / EXCA 204 IDR 350,000.00 1 01-Feb-23 28-Feb-23 283.7 313.9 30.2 200 IDR 70,000,000.00
KOMATSU / EXCA 205 IDR 350,000.00 1 01-Feb-23 28-Feb-23 195.2 218.8 23.6 200 IDR 70,000,000.00
KOMATSU / EXCA 206 IDR 350,000.00 1 01-Feb-23 28-Feb-23 183.7 221.9 38.2 200 IDR 70,000,000.00
KOMATSU / EXCA 207 IDR 350,000.00 1 01-Feb-23 28-Feb-23 117.2 131.7 14.5 200 IDR 70,000,000.00
KOMATSU / EXCA 208 IDR 350,000.00 1 01-Feb-23 28-Feb-23 172.0 209.9 37.9 200 IDR 70,000,000.00
KOMATSU / EXCA 209 IDR 350,000.00 1 01-Feb-23 28-Feb-23 373.8 414.7 40.9 200 IDR 70,000,000.00
KOBELCO / EXCA 210 IDR 350,000.00 1 01-Feb-23 28-Feb-23 189.5 207.1 17.6 200 IDR 70,000,000.00
CAT / EXCA 211 IDR 350,000.00 1 01-Feb-23 28-Feb-23 1,493.1 1,531.2 38.1 200 IDR 70,000,000.00
LIUGONG / EXCA 212 IDR 350,000.00 1 01-Feb-23 28-Feb-23 1,253.0 1,295.0 42.0 200 IDR 70,000,000.00
DOOSAN / EXCA 301 IDR 550,000.00 1 01-Feb-23 28-Feb-23 337.6 367.6 30.0 200 IDR 110,000,000.00
DOOSAN / EXCA 302 IDR 550,000.00 1 01-Feb-23 28-Feb-23 314.9 358.4 43.5 200 IDR 110,000,000.00
DOOSAN / EXCA 303 IDR 550,000.00 1 01-Feb-23 28-Feb-23 353.7 359.8 6.1 200 IDR 110,000,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
SANY / EXCA 01 IDR 260,000.00 1 01-Mar-23 16-Mar-23 2,822.0 2,837.0 15.0 IDR 3,900,000.00
SANY / EXCA 02 IDR 260,000.00 1 01-Mar-23 31-Mar-23 2,508.0 2,789.0 281.0 IDR 73,060,000.00
CAT / EXCA 03 IDR 260,000.00 1 01-Mar-23 17-Mar-23 2,163.0 2,352.0 189.0 IDR 49,140,000.00
CAT / EXCA 05 IDR 260,000.00 1 01-Mar-23 31-Mar-23 10,857.0 11,139.0 282.0 IDR 73,320,000.00
KOBELCO / 06 IDR 260,000.00 1 01-Mar-23 17-Mar-23 6,138.0 6,309.0 171.0 IDR 44,460,000.00
KOBELCO / 07 IDR 260,000.00 1 01-Mar-23 31-Mar-23 6,866.0 7,205.0 339.0 IDR 88,140,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
CAT / REXCA 01 IDR 260,000.00 1 17-Mar-23 31-Mar-23 2,350.0 2,461.0 111.0 IDR 28,860,000.00
KOBELCO / REXCA 02 IDR 260,000.00 1 17-Mar-23 31-Mar-23 6,309.0 6,418.0 109.0 IDR 28,340,000.00
SANY / REXCA 03 IDR 260,000.00 1 17-Mar-23 31-Mar-23 2,850.0 2,964.0 114.0 IDR 29,640,000.00
Note: TOTAL IDR 86,840,000.00
PPN IDR 9,552,400.00
PPH 23 IDR (1,736,800.00)
SUBTOTAL IDR 94,655,600.00
Please transfer your payment to:
Account Name : CV. Putra Gemilang Perkasa
Account No. : 1520094777477
Name of Bank : Bank Mandiri
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
Arham Baso
MP TRUCK
Invoice Amount
Monthly Invoiced
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
31-Mar-23 28
TOTAL
PPN
PPH 23
SUBTOTAL
Invoice Amount
Monthly Invoiced
IDR 85,000,000.00
IDR 115,000,000.00
IDR 115,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 70,000,000.00
IDR 110,000,000.00
IDR 110,000,000.00
IDR 110,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 85,000,000.00
IDR 2,335,000,000.00
IDR 256,850,000.00
IDR (46,700,000.00)
IDR 2,545,150,000.00
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 IDR 425,000.00 1 01-Apr-23 30-Apr-23 433.5 699.1 265.6 200 IDR 112,880,000.00
LIUGONG / DOZER 102 IDR 575,000.00 1 01-Apr-23 30-Apr-23 266.6 399.7 133.1 200 IDR 115,000,000.00
LIUGONG / DOZER 103 IDR 575,000.00 1 01-Apr-23 30-Apr-23 244.1 410.2 166.1 200 IDR 115,000,000.00
KOMATSU / EXCA 201 IDR 350,000.00 1 01-Apr-23 30-Apr-23 2,508.4 2,715.9 207.5 200 IDR 72,625,000.00
KOMATSU / EXCA 202 IDR 350,000.00 1 01-Apr-23 30-Apr-23 270.5 498.5 228.0 200 IDR 79,800,000.00
KOMATSU / EXCA 203 IDR 350,000.00 1 01-Apr-23 30-Apr-23 209.9 472.6 262.7 200 IDR 91,945,000.00
KOMATSU / EXCA 204 IDR 350,000.00 1 01-Apr-23 30-Apr-23 314.2 486.6 172.4 200 IDR 70,000,000.00
KOMATSU / EXCA 205 IDR 350,000.00 1 01-Apr-23 30-Apr-23 247.1 515.6 268.5 200 IDR 93,975,000.00
KOMATSU / EXCA 206 IDR 350,000.00 1 01-Apr-23 30-Apr-23 222.4 304.9 82.5 200 IDR 70,000,000.00
KOMATSU / EXCA 207 IDR 350,000.00 1 01-Apr-23 30-Apr-23 168.7 385.9 217.2 200 IDR 76,020,000.00
KOMATSU / EXCA 208 IDR 350,000.00 1 01-Apr-23 30-Apr-23 210.3 321.8 111.5 200 IDR 70,000,000.00
KOMATSU / EXCA 209 IDR 350,000.00 1 01-Apr-23 30-Apr-23 476.3 753.1 276.8 200 IDR 96,880,000.00
KOBELCO / EXCA 210 IDR 350,000.00 1 01-Apr-23 30-Apr-23 212.7 371.1 158.4 200 IDR 70,000,000.00
CAT / EXCA 211 IDR 350,000.00 1 01-Apr-23 30-Apr-23 1,538.7 1,748.1 209.4 200 IDR 73,290,000.00
LIUGONG / EXCA 212 IDR 350,000.00 1 01-Apr-23 30-Apr-23 1,306.2 1,533.7 227.5 200 IDR 79,625,000.00
DOOSAN / EXCA 301 IDR 550,000.00 1 01-Apr-23 30-Apr-23 421.5 666.1 244.6 200 IDR 134,530,000.00
DOOSAN / EXCA 302 IDR 550,000.00 1 01-Apr-23 30-Apr-23 362.5 696.6 334.1 200 IDR 183,755,000.00
DOOSAN / EXCA 303 IDR 550,000.00 1 01-Apr-23 30-Apr-23 412.0 764.2 352.2 200 IDR 193,710,000.00
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 IDR 425,000.00 1 01-May-23 31-May-23 699.1 975.1 276.0 200 IDR 117,300,000.00
LIUGONG / DOZER 102 IDR 575,000.00 1 01-May-23 31-May-23 399.7 772.4 372.7 200 IDR 214,302,500.00
LIUGONG / DOZER 103 IDR 575,000.00 1 01-May-23 31-May-23 410.2 732.4 322.2 200 IDR 185,265,000.00
KOMATSU / EXCA 201 IDR 350,000.00 1 01-May-23 31-May-23 2,715.9 3,076.6 360.7 200 IDR 126,245,000.00
KOMATSU / EXCA 202 IDR 350,000.00 1 01-May-23 31-May-23 498.5 838.4 339.9 200 IDR 118,965,000.00
KOMATSU / EXCA 203 IDR 350,000.00 1 01-May-23 31-May-23 472.6 820.4 347.8 200 IDR 121,730,000.00
KOMATSU / EXCA 204 IDR 350,000.00 1 01-May-23 31-May-23 486.6 886.7 400.1 200 IDR 140,035,000.00
KOMATSU / EXCA 205 IDR 350,000.00 1 01-May-23 31-May-23 515.6 863.4 347.8 200 IDR 121,730,000.00
KOMATSU / EXCA 206 IDR 350,000.00 1 01-May-23 31-May-23 304.9 690.6 385.7 200 IDR 134,995,000.00
KOMATSU / EXCA 207 IDR 350,000.00 1 01-May-23 31-May-23 385.9 759.8 373.9 200 IDR 130,865,000.00
KOMATSU / EXCA 208 IDR 350,000.00 1 01-May-23 31-May-23 321.8 643.9 322.1 200 IDR 112,735,000.00
KOMATSU / EXCA 209 IDR 350,000.00 1 01-May-23 31-May-23 753.1 1,129.5 376.4 200 IDR 131,740,000.00
KOBELCO / EXCA 210 IDR 350,000.00 1 01-May-23 31-May-23 371.1 785.0 413.9 200 IDR 144,865,000.00
CAT / EXCA 211 IDR 350,000.00 1 01-May-23 31-May-23 1,748.1 1,985.5 237.4 200 IDR 83,090,000.00
LIUGONG / EXCA 212 IDR 350,000.00 1 01-May-23 31-May-23 1,533.7 1,892.3 358.6 200 IDR 125,510,000.00
DOOSAN / EXCA 301 IDR 550,000.00 1 01-May-23 31-May-23 666.1 1,055.4 389.3 200 IDR 214,115,000.00
DOOSAN / EXCA 302 IDR 550,000.00 1 01-May-23 31-May-23 696.6 1,129.5 432.9 200 IDR 238,095,000.00
DOOSAN / EXCA 303 IDR 550,000.00 1 01-May-23 31-May-23 764.2 1,165.0 400.8 200 IDR 220,440,000.00
FUSO / DT 402 IDR 85,000,000.00 1 01-May-23 31-May-23 Potoongan Cas 2 day 31 IDR 79,516,000.00
FUSO / DT 407 IDR 85,000,000.00 1 01-May-23 31-May-23 Potongan cas 3 day 1 shift 31 IDR 75,403,000.00
HINO / DT 409 IDR 85,000,000.00 1 01-May-23 31-May-23 potongan 1 shift 31 IDR 83,629,000.00
HINO / DT 410 IDR 85,000,000.00 1 01-May-23 31-May-23 Potongan 3 day 31 IDR 76,774,000.00
Note: TOTAL IDR 3,507,344,500.00
DT 402 Standby 2 Day Manpower PGP ( Rekapan Hitungan terlampir) PPN IDR 385,807,895.00
DT 407 Standby 3 Day 1 Shift Manpower PGP ( Rekapan Hitungan terlampir) PPH 23 IDR (70,146,890.00)
DT 409 Standby 1 Shift Manpower PGP (Rekapan Hitungan terlampir) Grand Total IDR 3,823,005,505.00
DT 410 standby 3 Day Manpower PGP (Rekapan Hitungan terlampir)
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
REXCA 01 IDR 260,000.00 1 01-May-23 31-May-23 2,651.0 2,937.0 286.0 IDR 74,360,000.00
REXCA 02 IDR 260,000.00 1 01-May-23 31-May-23 6,560.5 6,846.0 285.5 IDR 74,230,000.00
REXCA 03 IDR 260,000.00 1 03-May-23 31-May-23 3,137.2 3,383.0 245.8 IDR 63,908,000.00
REXCA 04 IDR 260,000.00 1 02-May-23 31-May-23 11290.4 11443.0 152.6 IDR 39,676,000.00
REXCA 05 IDR 260,000.00 1 01-May-23 30-May-23 7,426.0 7,590.0 164.0 IDR 42,640,000.00
REXCA 06 IDR 260,000.00 1 01-May-23 31-May-23 2,927.7 3,158.0 230.3 IDR 59,878,000.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 GC IDR 275,000.00 1 02-Jun-23 01-Jul-23 7,515.0 200 IDR 55,000,000.00
EXCA CAT 320 GX IDR 275,000.00 1 02-Jun-23 01-Jul-23 9,040.0 200 IDR 55,000,000.00
EXCA CAT 320 D2GC IDR 275,000.00 1 02-Jun-23 01-Jul-23 10,432.0 200 IDR 55,000,000.00
EXCA CAT 320 NG IDR 275,000.00 1 02-Jun-23 01-Jul-23 7353.0 200 IDR 55,000,000.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 IDR 425,000.00 1 01-Jun-23 30-Jun-23 975.1 1,259.1 284.0 200 IDR 120,700,000.00
LIUGONG / DOZER 102 IDR 575,000.00 1 01-Jun-23 30-Jun-23 772.4 976.8 204.4 200 IDR 117,530,000.00
LIUGONG / DOZER 103 IDR 575,000.00 1 01-Jun-23 30-Jun-23 732.4 970.0 237.6 200 IDR 136,620,000.00
KOMATSU / EXCA 201 IDR 350,000.00 1 01-Jun-23 30-Jun-23 3,076.6 3,380.6 304.0 200 IDR 106,400,000.00
KOMATSU / EXCA 202 IDR 350,000.00 1 01-Jun-23 30-Jun-23 838.4 1,119.5 281.1 200 IDR 98,385,000.00
KOMATSU / EXCA 203 IDR 350,000.00 1 01-Jun-23 30-Jun-23 820.4 1,088.3 267.9 200 IDR 93,765,000.00
KOMATSU / EXCA 204 IDR 350,000.00 1 01-Jun-23 30-Jun-23 886.7 1,177.9 291.2 200 IDR 101,920,000.00
KOMATSU / EXCA 205 IDR 350,000.00 1 01-Jun-23 30-Jun-23 863.4 1,169.1 305.7 200 IDR 106,995,000.00
KOMATSU / EXCA 206 IDR 350,000.00 1 01-Jun-23 30-Jun-23 690.6 1,011.4 320.8 200 IDR 112,280,000.00
KOMATSU / EXCA 207 IDR 350,000.00 1 01-Jun-23 30-Jun-23 759.8 1,090.7 330.9 200 IDR 115,815,000.00
KOMATSU / EXCA 208 IDR 350,000.00 1 01-Jun-23 30-Jun-23 643.9 942.0 298.1 200 IDR 104,335,000.00
KOMATSU / EXCA 209 IDR 350,000.00 1 01-Jun-23 30-Jun-23 1,129.5 1,442.6 313.1 200 IDR 109,585,000.00
KOBELCO / EXCA 210 IDR 350,000.00 1 01-Jun-23 30-Jun-23 785.0 1,104.8 319.8 200 IDR 111,930,000.00
CAT / EXCA 211 IDR 350,000.00 1 01-Jun-23 30-Jun-23 1,985.5 2,276.2 290.7 200 IDR 101,745,000.00
LIUGONG / EXCA 212 IDR 350,000.00 1 01-Jun-23 30-Jun-23 1,892.3 2,126.8 234.5 200 IDR 82,075,000.00
DOOSAN / EXCA 301 IDR 550,000.00 1 01-Jun-23 30-Jun-23 1,055.4 1,360.3 304.9 200 IDR 167,695,000.00
DOOSAN / EXCA 302 IDR 550,000.00 1 01-Jun-23 30-Jun-23 1,129.5 1,453.1 323.6 200 IDR 177,980,000.00
DOOSAN / EXCA 303 IDR 550,000.00 1 01-Jun-23 30-Jun-23 1,165.0 1,426.9 261.9 200 IDR 144,045,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
REXCA 01 IDR 260,000.00 1 01-Jun-23 30-Jun-23 2,937.0 3,117.0 180.0 IDR 46,800,000.00
REXCA 02 IDR 260,000.00 1 01-Jun-23 30-Jun-23 6,846.0 7,081.0 235.0 IDR 61,100,000.00
REXCA 03 IDR 260,000.00 1 01-Jun-23 28-Jun-23 3,383.0 3,596.0 213.0 IDR 55,380,000.00
REXCA 04 IDR 260,000.00 1 01-Jun-23 08-Jun-23 11443.0 11471.0 28.0 IDR 7,280,000.00
REXCA 05 IDR 260,000.00 1 03-Jun-23 27-Jun-23 7,590.0 7,726.0 136.0 IDR 35,360,000.00
REXCA 06 IDR 260,000.00 1 01-Jun-23 28-Jun-23 3,158.0 3,368.0 210.0 IDR 54,600,000.00
REXCA 07 IDR 260,000.00 1 09-Jun-23 30-Jun-23 12.0 190.0 178.0 IDR 46,280,000.00
Note: Pada tgl 8-9 Juni 2023 Rexca 04 di ganti oleh Rexca 07 (New Unit) TOTAL IDR 306,800,000.00
PPN IDR 33,748,000.00
PPH 23 IDR 6,136,000.00
SUBTOTAL IDR 334,412,000.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 GC / RESKI IDR 275,000.00 1 02-Jun-23 04-Jul-23 7,715.0 7,915.0 200.0 200 IDR 55,000,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK FUSO 02 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 7 SHIFT IDR 66,250,000.00
DUMP TRUCK FUSO 03 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 14 SHIFT IDR 57,500,000.00
DUMP TRUCK FUSO 04 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 4 SHIFT IDR 70,000,000.00
DUMP TRUCK FUSO 05 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 15 SHIFT IDR 56,250,000.00
DUMP TRUCK FUSO O7 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 52 SHIFT IDR 10,000,000.00
DUMP TRUCK FUSO O8 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 2 SHIFT , OUT 2 SHIFT IDR 70,000,000.00
DUMP TRUCK FUSO O9 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 4 SHIFT , OUT 2 SHIFT IDR 67,500,000.00
DUMP TRUCK FUSO O10 IDR 75,000,000.00 1 01-Jun-23 30-Jun-23 BD 2 SHIFT IDR 72,500,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
Note:
01-Jun-23 30-Jun-23
01-Jun-23 30-Jun-23
01-Jun-23 30-Jun-23
01-Jun-23 30-Jun-23
Invoice Amount
Monthly Invoiced
Adjusment MIN
Days DAYS
IDR 21,741,650.00
Rp 1,133,333 12
Rp 68,000,000 13
18
7
Rp 13,599,996 Rp 54,400,004
Rp 14,733,329 Rp 53,266,671
Rp 20,399,994 Rp 47,600,006
Rp 7,933,331 Rp 60,066,669
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
Note:
Monthly Invoiced
30-Jun-23 BD 7 SHIFT
30-Jun-23 BD 14 SHIFT
30-Jun-23 BD 4 SHIFT
30-Jun-23 BD 15 SHIFT
30-Jun-23 BD 52 SHIFT
30-Jun-23 BD 2 SHIFT
Grand Total
Invoice Amount
Monthly Invoiced
IDR 60,066,669.00
IDR 52,133,338.00
IDR 63,466,668.00
IDR 51,000,005.00
IDR 9,066,684.00
IDR 63,466,668.00
IDR 61,200,002.00
IDR 65,733,334.00
IDR 426,133,368.00
IDR 86,166,632.00
7 Rp 1,133,333 Rp 7,933,331 Rp 60,066,669
4 Rp 4,533,332 Rp 63,466,668
6 Rp 6,799,998 Rp 61,200,002
2 Rp 2,266,666 Rp 65,733,334
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
Arham Baso
To
PT. SALAPANG CAHAYA SEJAHTERA
MAKASSAR , SULAWESI SELATAN
SUBJECT : INVOICE
Note: - Harga Belum Termasuk Operator (disediakan oleh penyewa) TOTAL IDR 392,000,000.00
- Kontrak akan terhitung setelah unit tiba di site
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 Rp 425,000 1 01-Jul-23 31-Jul-23 1,259.1 1,518.1 259.0 200 Rp 110,075,000
LIUGONG / DOZER 102 Rp 575,000 1 01-Jul-23 31-Jul-23 976.8 1,323.9 347.1 200 Rp 199,582,500
LIUGONG / DOZER 103 Rp 575,000 1 01-Jul-23 31-Jul-23 970.0 1,213.1 243.1 200 Rp 139,782,500
KOMATSU / EXCA 201 Rp 350,000 1 01-Jul-23 31-Jul-23 3,380.6 3,783.0 402.4 200 Rp 140,840,000
KOMATSU / EXCA 202 Rp 350,000 1 01-Jul-23 31-Jul-23 1,119.5 1,522.1 402.6 200 Rp 140,910,000
KOMATSU / EXCA 203 Rp 350,000 1 01-Jul-23 31-Jul-23 1,088.3 1,491.4 403.1 200 Rp 141,085,000
KOMATSU / EXCA 204 Rp 350,000 1 01-Jul-23 31-Jul-23 1,177.9 1,582.0 404.1 200 Rp 141,435,000
KOMATSU / EXCA 205 Rp 350,000 1 01-Jul-23 31-Jul-23 1,169.1 1,566.6 397.5 200 Rp 139,125,000
KOMATSU / EXCA 206 Rp 350,000 1 01-Jul-23 31-Jul-23 1,011.4 1,382.8 371.4 200 Rp 129,990,000
KOMATSU / EXCA 207 Rp 350,000 1 01-Jul-23 31-Jul-23 1,090.7 1,475.6 384.9 200 Rp 134,715,000
KOMATSU / EXCA 208 Rp 350,000 1 01-Jul-23 31-Jul-23 942.0 1,348.8 406.8 200 Rp 142,380,000
KOMATSU / EXCA 209 Rp 350,000 1 01-Jul-23 31-Jul-23 1,442.6 1,822.6 380.0 200 Rp 133,000,000
KOBELCO / EXCA 210 Rp 350,000 1 01-Jul-23 31-Jul-23 1,104.8 1,518.0 413.2 200 Rp 144,620,000
CAT / EXCA 211 Rp 350,000 1 01-Jul-23 31-Jul-23 2,276.2 2,652.3 376.1 200 Rp 131,635,000
LIUGONG / EXCA 212 Rp 350,000 1 01-Jul-23 31-Jul-23 2,126.8 2,525.7 398.9 200 Rp 139,615,000
DOOSAN / EXCA 301 Rp 550,000 1 01-Jul-23 31-Jul-23 1,360.3 1,756.5 396.2 200 Rp 217,910,000
DOOSAN / EXCA 302 Rp 550,000 1 01-Jul-23 31-Jul-23 1,453.1 1,933.9 480.8 200 Rp 264,440,000
DOOSAN / EXCA 303 Rp 550,000 1 01-Jul-23 31-Jul-23 1,426.9 1,838.6 411.7 200 Rp 226,435,000
FUSO / DT 401 Rp 85,000,000 1 01-Jul-23 31-Jul-23 3 Day 1 Shift BD , 1 shift No driver 31 Rp 74,032,000
Arham Baso
Direktur
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
Arham Baso
NTERNASIONAL
0.0
0.0
0.0
Invoice Amount
Monthly Invoiced
Adjusment MIN
Hours HOURS
200
50
TOTAL
Invoice Amount
Monthly Invoiced
IDR 55,000,000.00
IDR 13,750,000.00
IDR 6,000,000.00
IDR 74,750,000.00
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
REXCA 01 IDR 260,000.00 1 01-Jul-23 31-Jul-23 3,117.0 3,392.0 275.0 IDR 71,500,000.00
REXCA 02 IDR 260,000.00 1 01-Jul-23 31-Jul-23 7,081.0 7,335.0 254.0 IDR 66,040,000.00
REXCA 03 IDR 260,000.00 1 01-Jul-23 31-Jul-23 3,596.0 3,867.0 271.0 IDR 70,460,000.00
REXCA 05 IDR 260,000.00 1 08-Jul-23 30-Jul-23 7,726.0 7,922.0 196.0 IDR 50,960,000.00
REXCA 06 IDR 260,000.00 1 01-Jul-23 30-Jul-23 3,368.0 3,607.0 239.0 IDR 62,140,000.00
REXCA 07 IDR 260,000.00 1 02-Jul-23 31-Jul-23 190.0 474.0 284.0 IDR 73,840,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK FUSO 02 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 30 1 day 1 shift Break Down IDR 71,370,968.00
DUMP TRUCK FUSO 03 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 9 22 day 1 shift Break Down IDR 20,564,513.00
DUMP TRUCK FUSO 04 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 30 1 day 1 shift Break Down IDR 71,370,968.00
DUMP TRUCK FUSO O5 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 23 8 day 1 shift IDR 54,435,483.00
DUMP TRUCK FUSO O7 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 Break Down Total
DUMP TRUCK FUSO 10 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 29 2 day 1 shift Break Down IDR 68,951,618.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK 01 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 18 13 day Break Down IDR 43,548,398.00
DUMP TRUCK 02 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 24 7 day 1 shift Break Down IDR 56,854,845.00
DUMP TRUCK 03 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 24 7 day Break Down IDR 58,064,522.00
DUMP TRUCK 04 IDR 75,000,000.00 1 01-Jul-23 31-Jul-23 9 22 day Break Down IDR 21,774,212.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 D2GC / 03 RISMAN IDR 275,000.00 1 23-Aug-23 23-Sep-23 9,440.0 9,640.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 04 WAYAN IDR 275,000.00 1 22-Aug-23 22-Sep-23 10,832.0 11,032.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 06 RISKI IDR 275,000.00 1 21-Aug-23 21-Sep-23 7,915.0 8,115.0 200 IDR 55,000,000.00
EXCA CAT 320 GX / 09 ADI IDR 275,000.00 1 23-Aug-23 23-Sep-23 409.0 609.0 200 IDR 55,000,000.00
EXCA CAT 320 NG / NYOMAN IDR 275,000.00 1 20-Aug-23 20-Sep-23 7753.6 7953.6 200 IDR 55,000,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
REXCA 02 IDR 260,000.00 1 01-Aug-23 04-Aug-23 7,335.0 7,367.0 32.0 IDR 8,320,000.00
REXCA 03 IDR 260,000.00 1 02-Aug-23 16-Aug-23 3,867.0 3,976.0 109.0 IDR 28,340,000.00
REXCA 07 IDR 260,000.00 1 03-Aug-23 11-Aug-23 474.0 539.0 65.0 IDR 16,900,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK FUSO 01 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 17 11 Day BD 3 Day ND IDR 41,129,030.00
DUMP TRUCK FUSO 02 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 29 3 Day BD 1 Shift ND IDR 66,532,257.00
DUMP TRUCK FUSO 03 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 25 1 Day BD 5 Day ND IDR 60,483,870.00
DUMP TRUCK FUSO 04 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 26 4 Day 1 Shift BD 2 Day 1 Shift ND IDR 58,064,515.00
DUMP TRUCK FUSO O5 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 9 21 Day BD 1 Day ND IDR 21,774,190.00
DUMP TRUCK FUSO O7 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 10 20 Day BD 1 Day ND IDR 24,193,545.00
DUMP TRUCK FUSO 10 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 29 1 Shift BD 1 Day 1 Shift ND IDR 70,161,290.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK 02 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 26 1 Day 1 Shift BD 3 Day 1 Shift ND IDR 62,903,225.00
DUMP TRUCK 03 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 23 3 Day BD 5 Day ND IDR 55,645,160.00
DUMP TRUCK 04 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 10 15 Day 1 Shift BD 5 Day 1 Shift ND IDR 24,193,545.00
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 Rp 425,000 1 01-Aug-23 31-Aug-23 1,518.1 1,892.4 374.3 200 Rp 159,077,500
LIUGONG / DOZER 102 Rp 575,000 1 01-Aug-23 31-Aug-23 1,323.9 1,640.1 316.2 200 Rp 181,815,000
LIUGONG / DOZER 103 Rp 575,000 1 01-Aug-23 31-Aug-23 1,213.1 1,567.3 354.2 200 Rp 203,665,000
KOMATSU / EXCA 201 Rp 350,000 1 01-Aug-23 31-Aug-23 3,783.0 4,207.3 424.3 200 Rp 148,505,000
KOMATSU / EXCA 202 Rp 350,000 1 01-Aug-23 31-Aug-23 1,522.1 1,974.9 452.8 200 Rp 158,480,000
KOMATSU / EXCA 203 Rp 350,000 1 01-Aug-23 31-Aug-23 1,491.4 1,955.3 463.9 200 Rp 162,365,000
KOMATSU / EXCA 204 Rp 350,000 1 01-Aug-23 31-Aug-23 1,582.0 2,048.6 466.6 200 Rp 163,310,000
KOMATSU / EXCA 205 Rp 350,000 1 01-Aug-23 31-Aug-23 1,566.6 2,031.2 464.6 200 Rp 162,610,000
KOMATSU / EXCA 206 Rp 350,000 1 01-Aug-23 31-Aug-23 1,382.8 1,858.8 476.0 200 Rp 166,600,000
KOMATSU / EXCA 207 Rp 350,000 1 01-Aug-23 31-Aug-23 1,475.6 1,942.8 467.2 200 Rp 163,520,000
KOMATSU / EXCA 208 Rp 350,000 1 01-Aug-23 31-Aug-23 1,348.8 1,835.2 486.4 200 Rp 170,240,000
KOMATSU / EXCA 209 Rp 350,000 1 01-Aug-23 31-Aug-23 1,822.6 2,298.2 475.6 200 Rp 166,460,000
KOBELCO / EXCA 210 Rp 350,000 1 01-Aug-23 31-Aug-23 1,518.0 1,983.2 465.2 200 Rp 162,820,000
CAT / EXCA 211 Rp 350,000 1 01-Aug-23 31-Aug-23 2,652.3 3,128.0 475.7 200 Rp 166,495,000
LIUGONG / EXCA 212 Rp 350,000 1 01-Aug-23 31-Aug-23 2,525.7 2,991.0 465.3 200 Rp 162,855,000
DOOSAN / EXCA 301 Rp 550,000 1 01-Aug-23 31-Aug-23 1,756.5 2,207.8 451.3 200 Rp 248,215,000
DOOSAN / EXCA 302 Rp 550,000 1 01-Aug-23 31-Aug-23 1,933.9 2,429.9 496.0 200 Rp 272,800,000
DOOSAN / EXCA 303 Rp 550,000 1 01-Aug-23 31-Aug-23 1,838.6 2,309.5 470.9 200 Rp 258,995,000
Arham Baso
Direktur
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
REXCA 05 IDR 260,000.00 1 03-Aug-23 22-Aug-23 3,393.0 3,526.0 133.0 IDR 34,580,000.00
REXCA 06 IDR 260,000.00 1 03-Aug-23 22-Aug-23 3,606.0 3,713.0 107.0 IDR 27,820,000.00
REXCA 07 IDR 260,000.00 1 03-Aug-23 22-Aug-23 7,922.0 8,042.0 120.0 IDR 31,200,000.00
REXCA 09 IDR 260,000.00 1 21-Aug-23 24-Aug-23 7,384.0 7,417.0 33.0 IDR 8,580,000.00
REXCA 10 IDR 260,000.00 1 23-Aug-23 24-Aug-23 3,980.0 3,988.0 8.0 IDR 2,080,000.00
REXCA 11 IDR 260,000.00 1 23-Aug-23 24-Aug-23 550.0 564.0 14.0 IDR 3,640,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
Note:
Monthly Invoiced
TOTAL
PPN
PPH 23
SUBTOTAL
Invoice Amount
Monthly Invoiced
IDR 29,032,255.00
IDR 54,435,482.00
IDR 48,387,095.00
IDR 45,967,740.00
IDR 9,677,415.00
IDR 12,096,770.00
IDR 58,064,515.00
IDR 257,661,272.00
IDR 28,342,739.92
IDR 5,153,225.44
IDR 280,850,786.48
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK FUSO 01 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 11 Day BD 3 Day ND 2 Day 1 Shift No Op IDR 35,080,642.00
DUMP TRUCK FUSO 02 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 3 Day BD 1 Shift ND 2 Day 1 Shift No Op IDR 60,483,870.00
DUMP TRUCK FUSO 03 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 1 Day BD 5 Day ND 2 Day 1 Shift No Op IDR 54,435,482.00
DUMP TRUCK FUSO 04 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 4 Day 1 Shift BD 2 Day 1 Shift ND 2 Day 1 Shift No Op IDR 52,016,127.00
DUMP TRUCK FUSO O5 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 21 Day BD 1 Day ND 2 Day 1 Shift No Op IDR 15,725,802.00
DUMP TRUCK FUSO O7 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 20 Day BD 1 Day ND 2 Day 1 Shift No Op IDR 18,145,157.00
DUMP TRUCK FUSO 10 IDR 75,000,000.00 1 01-Aug-23 31-Aug-23 1 Shift BD 1 Day 1 Shift ND 2 Day 1 Shift No Op IDR 64,112,902.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 D2GC / 03 RISMAN IDR 275,000.00 1 17-Sep-23 17-Oct-23 9,640.0 9,840.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 04 WAYAN IDR 275,000.00 1 15-Sep-23 15-Oct-23 11,032.0 11,232.0 200 IDR 55,000,000.00
EXCA CAT 320 D / 05 YAHYA IDR 275,000.00 1 09-Sep-23 09-Oct-23 11,688.0 11,888.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 06 RESKI IDR 275,000.00 1 14-Sep-23 14-Oct-23 8,115.0 8,315.0 200 IDR 55,000,000.00
EXCA CAT 320 NG / NYOMAN IDR 275,000.00 1 14-Sep-23 14-Oct-23 7953.0 8153.0 200 IDR 55,000,000.00
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
30-Sep-23
Invoice Amount
Monthly Invoiced
Adjusment MIN
Hours HOURS
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
30
30
30
30
30
30
30
TOTAL
PPN
PPH 23
Grand Total
Invoice Amount
Monthly Invoiced
Rp 96,985,000
Rp 154,042,500
Rp 134,492,500
Rp 117,775,000
Rp 167,545,000
Rp 157,745,000
Rp 167,650,000
Rp 137,095,000
Rp 160,720,000
Rp 128,975,000
Rp 123,690,000
Rp 127,190,000
Rp 135,765,000
Rp 70,000,000
Rp 125,825,000
Rp 211,585,000
Rp 212,080,000
Rp 260,975,000
Rp 85,000,000
Rp 79,516,000
Rp 85,000,000
Rp 85,000,000
Rp 85,000,000
Rp 85,000,000
Rp 85,000,000
Rp 85,000,000
Rp 40,334,200
Rp 85,000,000
Rp 3,489,985,200
Rp 383,898,372
Rp 69,799,704
Rp 3,804,083,868
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
EXCA LIUGONG 922E IDR 425,000.00 1 12-Sep-23 30-Sep-23 1,618.5 1,789.6 171.1 IDR 72,717,500.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
DUMP TRUCK 01 IDR 75,000,000.00 1 01-Sep-23 30-Sep-23 4 shift ND 14 Shift BD 21 IDR 52,500,000.00
DUMP TRUCK 02 IDR 75,000,000.00 1 01-Sep-23 30-Sep-23 16 Shift BD 2 Shift ND 21 IDR 52,500,000.00
DUMP TRUCK 03 IDR 75,000,000.00 1 01-Sep-23 30-Sep-23 16 Shift ND 14 Shift BD 15 IDR 37,500,000.00
DUMP TRUCK 04 IDR 75,000,000.00 1 01-Sep-23 30-Sep-23 16 Shift ND 3 Shift BD 20 IDR 51,250,000.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 D / 05 YAHYA IDR 275,000.00 1 15-Oct-23 15-Nov-23 11,888.0 12,088.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 06 RESKI IDR 275,000.00 1 20-Oct-23 20-Nov-23 8,315.0 8,515.0 200 IDR 55,000,000.00
EXCA CAT 320 GX/ 09 ADI IDR 275,000.00 1 12-Oct-23 12-Nov-23 609.0 809.0 200 IDR 55,000,000.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
SANY SY 215 ACE IDR 275,000.00 1 09-Oct-23 31-Oct-23 3,750.0 3,950.0 200.0 200 IDR 55,000,000.00
CAT 320 D2 GC IDR 275,000.00 1 13-Oct-23 31-Oct-23 10,603.0 10,779.3 176.3 200 IDR 48,482,500.00
CAT 320 GC (77) IDR 275,000.00 1 13-Oct-23 31-Oct-23 10,018.5 10,194.0 175.5 200 IDR 48,262,500.00
Mobilisasi CAT 320 GC (77) Kodal - Tottalang IDR 9,000,000.00 1 IDR 9,000,000.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
EXCA LIUGONG 922E IDR 425,000.00 1 01-Oct-23 31-Oct-23 1,789.6 1,952.3 162.7 IDR 69,147,500.00
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 Rp 425,000 1 01-Oct-23 30-Oct-23 2,120.6 2,517.2 396.6 200 Rp 168,555,000
LIUGONG / DOZER 102 Rp 575,000 1 01-Oct-23 30-Oct-23 1,908.0 2,164.6 256.6 200 Rp 147,545,000
LIUGONG / DOZER 103 Rp 575,000 1 01-Oct-23 30-Oct-23 1,801.2 2,025.6 224.4 200 Rp 129,030,000
KOMATSU / EXCA 201 Rp 350,000 1 01-Oct-23 30-Oct-23 4,543.8 4,921.9 378.1 200 Rp 132,335,000
KOMATSU / EXCA 202 Rp 350,000 1 01-Oct-23 30-Oct-23 2,453.6 3,007.9 554.3 200 Rp 194,005,000
KOMATSU / EXCA 203 Rp 350,000 1 01-Oct-23 30-Oct-23 2,406.0 2,940.6 534.6 200 Rp 187,110,000
KOMATSU / EXCA 204 Rp 350,000 1 01-Oct-23 30-Oct-23 2,527.6 3,067.0 539.4 200 Rp 188,790,000
KOMATSU / EXCA 205 Rp 350,000 1 01-Oct-23 30-Oct-23 2,422.9 2,852.5 429.6 200 Rp 150,360,000
KOMATSU / EXCA 206 Rp 350,000 1 01-Oct-23 30-Oct-23 2,318.0 2,852.6 534.6 200 Rp 187,110,000
KOMATSU / EXCA 207 Rp 350,000 1 01-Oct-23 30-Oct-23 2,311.3 2,737.8 426.5 200 Rp 149,275,000
KOMATSU / EXCA 208 Rp 350,000 1 01-Oct-23 30-Oct-23 2,188.6 2,650.5 461.9 200 Rp 161,665,000
KOMATSU / EXCA 209 Rp 350,000 1 01-Oct-23 30-Oct-23 2,661.6 3,112.0 450.4 200 Rp 157,640,000
KOBELCO / EXCA 210 Rp 350,000 1 01-Oct-23 30-Oct-23 2,371.1 2,847.8 476.7 200 Rp 166,845,000
CAT / EXCA 211 Rp 350,000 1 01-Oct-23 30-Oct-23 3,280.7 3,655.2 374.5 200 Rp 131,075,000
LIUGONG / EXCA 212 Rp 350,000 1 01-Oct-23 30-Oct-23 3,350.5 3,808.1 457.6 200 Rp 160,160,000
DOOSAN / EXCA 301 Rp 550,000 1 01-Oct-23 30-Oct-23 2,592.5 3,055.7 463.2 200 Rp 254,760,000
DOOSAN / EXCA 302 Rp 550,000 1 01-Oct-23 30-Oct-23 2,815.5 3,334.0 518.5 200 Rp 285,175,000
DOOSAN / EXCA 303 Rp 550,000 1 01-Oct-23 30-Oct-23 2,784.0 3,304.0 520.0 200 Rp 286,000,000
Arham Baso
Direktur
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 D / 05 YAHYA IDR 275,000.00 1 16-Nov-23 16-Dec-23 12,088.0 12,288.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 06 RESKI IDR 275,000.00 1 17-Nov-23 17-Des-23 8,515.0 8,715.0 200 IDR 55,000,000.00
EXCA CAT 320 GX/ 09 ADI IDR 275,000.00 1 13-Nov-23 13-Des-23 809.0 1,009.0 200 IDR 55,000,000.00
Arham Baso
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
EXCA LIUGONG 922E IDR 425,000.00 1 01-Nov-23 30-Nov-23 1,952.9 2,319.4 366.5 IDR 155,762,500.00
Arham Baso
To
PT. MOKINDO JAYA ABADI
KENDARI , SULAWESI TENGGARA
SUBJECT : INVOICE
EXCA CAT 320 D2GC / 03 RISMAN IDR 275,000.00 1 22-Nov-23 22-Dec-23 10,040.0 10,240.0 200 IDR 55,000,000.00
EXCA CAT 320 GC / 04 WAYAN IDR 275,000.00 1 26-Nov-23 26-Dec-23 11,432.0 11,632.0 200 IDR 55,000,000.00
Arham Baso
To
PT. GUNUNG SAMUDERA INTERNASIONAL
MAKASSAR , SULAWESI SELATAN
SUBJECT : INVOICE
Arham Baso
To
PT. FORMAT TEKNIK MANDIRI
HALMAHERA TIMUR
SUBJECT : INVOICE
LIUOGONG / GRADER 101 Rp 425,000 1 08-Nov-23 21-Nov-23 2,517.0 2,547.0 30.0 200 Rp 12,750,000
LIUGONG / DOZER 103 Rp 575,000 1 01-Nov-23 20-Nov-23 2,025.6 2,059.3 33.7 200 Rp 19,377,500
KOMATSU / EXCA 202 Rp 350,000 1 01-Nov-23 02-Nov-23 3,007.9 3,014.6 6.7 200 Rp 2,345,000
KOMATSU / EXCA 205 Rp 350,000 1 01-Nov-23 02-Nov-23 2,852.5 2,870.5 18.0 200 Rp 6,300,000
KOMATSU / EXCA 207 Rp 350,000 1 01-Nov-23 01-Nov-23 2,737.8 2,739.9 2.1 200 Rp 735,000
KOMATSU / EXCA 208 Rp 350,000 1 06-Nov-23 21-Nov-23 2,650.5 2,899.2 248.7 200 Rp 87,045,000
KOMATSU / EXCA 209 Rp 350,000 1 01-Nov-23 20-Nov-23 3,112.0 3,352.5 240.5 200 Rp 84,175,000
KOBELCO / EXCA 210 Rp 350,000 1 01-Nov-23 02-Nov-23 2,847.8 2,866.6 18.8 200 Rp 6,580,000
CAT / EXCA 211 Rp 350,000 1 01-Nov-23 21-Nov-23 3,655.2 3,876.5 221.3 200 Rp 77,455,000
LIUGONG / EXCA 212 Rp 350,000 1 01-Nov-23 01-Nov-23 3,808.1 3,818.6 10.5 200 Rp 3,675,000
DOOSAN / EXCA 301 Rp 550,000 1 01-Nov-23 01-Nov-23 3,055.7 3,061.7 6.0 200 Rp 3,300,000
DOOSAN / EXCA 302 Rp 550,000 1 04-Nov-23 04-Nov-23 3,334.0 3,337.5 3.5 200 Rp 1,925,000
Arham Baso
Direktur
To
PT. JAGA AMAN SEJAHTERA
JAKARTA BARAT
SUBJECT : INVOICE
Arham Baso
Direktur
AN DUMP TRUCK
Monthly Invoiced
Rp 8,457,500
Rp 100,485,000
Rp 69,790,000
Rp 54,075,000
Rp 42,035,000
Rp 90,720,000
Rp 94,290,000
Rp 198,110,000
Rp 207,020,000
Rp 196,240,000
TOTAL Rp 1,061,222,500
PPN Rp 116,734,475
PPH 23 Rp 21,224,450
Grand Total Rp 1,156,732,525