DAILY REPORT

Format No: KPS-ALSO-AD-21(R0)

Date: 05. Jan. 2023 A ENGR SUPVR MGR


P
Department
P
Electrical Team
R
O
V
1. Manpower:
E

Identification Present Absent Leave W/off Total Remark


Korean 2 - - - 2
Engineers 4 - - - 4
Technicians 4 - - - 4
Electrician - - - - -
Total 10 - - - 10 See Note Below

2. WORK DESCRIPTION PERFORMED:


STATUS MAN
SYSTEM WORK DESCRIPTION
Percentage POWER
Completed
LV System - Performed monthly PM check sheet for LV system.
100%
Completed
MV System - Performed monthly PM check sheet for MV system
100%
[Req. No.: 19265] Checked SCR compressor motor 904 for tripping after removing
the coupling, the motor worked normally with no load, mechanical team checked
SCR Completed
the coupling and found normal, Switched the supply source from BDP-904 to BDP-
compressor
902 and worked normally, will prepare MR to purchase a new breaker because no 100%
904
spare was found in warehouse.
(The Compressor will be supplied by BDP-902 until replacing the breaker)
[Req. No.: 19276] Checked cooling radiator panel of DG#6 for common alarm, Electrical
Cooling Completed
found loose wire on one of the contactors, it was rectified and the alarm was Team
Radiator 100%
cleared.
Completed
Common - Received some engine Aux. and engine ventilation spare parts.
100%
- Following and updating MR/IR status.
- Updating work permit list.
Office - Prepared weekly major jobs.
(Document/ In Progress
- Prepared and submitted holiday shift duty
EPMS/Meeting)
- Preparing Spare parts, consumables, tools and devices plan of 2023
- Clearing Completed T.M on EPMS (Performed work).

3. Holiday Schedule:
Day Staff Date
Friday Yazan Makhloof, Ibrahim Almasri 2023-01-06
Saturday Ahmad Santrisi, Ibrahim Almasri 2023-01-07

4. Note
- N/A